972 Rutland Road
Brooklyn, NY 11212BBL 3-04611-0004Map
Owner of record: Neighborhood Restore Housing Development Fund Corp
972 Rutland Road is a mixed residential and retail building built in 1931 in Brooklyn, 11212. It has 4 residential units across 3 floors. The owner of record is Neighborhood Restore Housing Development Fund Corp. HPD has recorded 269 housing violations here, most recently on August 6, 2026. 47 of the 50 most recent violations are still open.
- HPD violations
- 269
- DOB violations
- 4
- ECB violations
- 1
- HPD complaints
- 167
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 269
- CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Aug 6, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Aug 6, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Oct 11, 2025 · Apt 2F
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 16, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox [ missing notice ] at public hall, 1st story
Sep 16, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 16, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Sep 16, 2025 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood base cabinet at south in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Sep 16, 2025 · Apt 2F
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tiles with grouted joints of visible mildew and mold around the walls at the bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Sep 16, 2025 · Apt 2F
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling at closet in the private hallway located at apt 2f, 2nd story, 1st apartment from north at east
Sep 16, 2025 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Sep 16, 2025 · Apt 2F
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Sep 16, 2025 · Apt 2F
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings [ missing notice ]
Sep 16, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above the ceiling in the entire apartment located at apt 3r3f, 3rd story, 1st apartment from north at east
Sep 11, 2025 · Apt 3R3F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at cooking range in the kitchen located at apt 3r3f, 1st apartment from north at east
Sep 11, 2025 · Apt 3R3F
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the kitchen located at apt 3r3f, 1st apartment from north at east
Sep 11, 2025 · Apt 3R3F
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the kitchen located at apt 3r3f, 1st apartment from north at east
Sep 11, 2025 · Apt 3R3F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 3r3f, 1st apartment from north at east
Sep 11, 2025 · Apt 3R3F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 3r3f, 1st apartment from north at east
Sep 11, 2025 · Apt 3R3F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3r3f, 1st apartment from north at east
Sep 11, 2025 · Apt 3R3F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Aug 29, 2025 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Aug 29, 2025 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar at boiler room
Aug 29, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Aug 29, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Aug 29, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet doors at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Aug 29, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Aug 29, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Aug 29, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Aug 28, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Aug 28, 2025 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Aug 28, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above ceiling at public hall, 3rd story
Aug 25, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Aug 25, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Aug 25, 2025 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Aug 25, 2025
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Aug 25, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Aug 25, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Aug 25, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Aug 25, 2025 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Aug 25, 2025 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Aug 25, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Aug 25, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 25, 2025
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at east wall junction box at public hall, 1st story
Aug 25, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of shopping carts, folding tables and household items at public hall, 1st story
Aug 25, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material ceiling at public hall, 3rd story
Aug 25, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Aug 25, 2025
Open — Nov sent out - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at public hall, 3rd story
Aug 25, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Aug 25, 2025 · Apt 2R
Open — Nov sent out
DOB building violations · 4
- Construction other optional
C-construction other optional
May 3, 2017
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
May 3, 2017
Vpw-violation unserved ecb-work without permit-active - Construction other optional
C-construction other optional
May 3, 2017
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
May 3, 2017
Vp-violation unserved ecb-active
ECB violations · 1
- Class - 3
B354. 32a.21b.50a.50b.50c.50d.50e.50f.50g.50h.50i.50a fresh air ventalation cloged 50b holes in boiler room ceiling 50c exposed wood beam in boiler room 50d back flow prevent or missing on feed water lines 50e
Jul 15, 2008 · Penalty $200
Active
Complaints
- Heat/hot water
Entire building
Aug 3, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Aug 1, 2026 · Apt 2R
Close - Heat/hot water
Entire building
Aug 1, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
Jun 18, 2026 · Apt 2F
Close - Paint/plaster
Ceiling
May 26, 2026 · Apt 3R
Close - Water leak
Heavy flow
May 26, 2026 · Apt 3R
Close - Appliance
Electric/gas range
May 26, 2026 · Apt 3R
Close - Heat/hot water
Apartment only
Dec 23, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 19, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 8, 2025 · Apt 2F
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Oct 10, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Oct 7, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Sep 16, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Aug 31, 2025 · Apt 2F
Close - Plumbing
Water supply
Aug 27, 2025 · Apt 3F
Close - General
Cooking gas
Aug 27, 2025 · Apt 3F
Close - Water leak
Heavy flow
Aug 27, 2025 · Apt 3R3F
Close - Heat/hot water
Apartment only
Aug 26, 2025 · Apt 2F
Close - Electric
Outlet/switch
Aug 26, 2025 · Apt 2F
Close - Flooring/stairs
Floor
Aug 26, 2025 · Apt 2F
Close - Unsanitary condition
Mold
Aug 26, 2025 · Apt 2F
Close - Safety
Smoke detector
Aug 26, 2025 · Apt 2F
Close - Paint/plaster
Ceiling
Aug 26, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Aug 26, 2025 · Apt 2F
Close - Water leak
Slow leak
Aug 26, 2025 · Apt 2F
Close - Door/window
Door
Aug 26, 2025 · Apt 2F
Close - Appliance
Electric/gas range
Aug 24, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Aug 23, 2025 · Apt 2R
Close - General
Cooking gas
Aug 23, 2025 · Apt 2R
Close - Plumbing
Water supply
Aug 22, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Jan 5, 2025 · Apt BLDG
Close - Paint/plaster
Wall
Dec 14, 2024 · Apt 2R
Close - Heat/hot water
Entire building
Dec 14, 2024 · Apt BLDG
Close - General
Cooking gas
Dec 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 6, 2024 · Apt 2F
Close - General
Cooking gas
Dec 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 13, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Oct 17, 2024 · Apt 2F
Close - Plumbing
Water supply
Sep 30, 2024 · Apt 2F
Close - Plumbing
Water supply
Aug 30, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Aug 23, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Jul 13, 2024 · Apt 2F
Close - Plumbing
Radiator
Jun 7, 2024 · Apt 2F
Close - Plumbing
Water supply
Jun 7, 2024 · Apt 2F
Close - Electric
Outlet/switch
Jun 7, 2024 · Apt 2F
Close - Paint/plaster
Wall
Jun 7, 2024 · Apt 2F
Close - Flooring/stairs
Floor
Jun 7, 2024 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1931
- Floors
- 3
- Residential units
- 4
- Building area
- 3,780 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4611 / 4
- Assessed value
- $242,100
- Landmark / historic district
- No
HPD registration #339631, last renewed Aug 14, 2025.
Questions about 972 Rutland Road
Who owns 972 Rutland Road?
The owner of record in NYC Department of City Planning PLUTO data is Neighborhood Restore Housing Development Fund Corp.
Does 972 Rutland Road have violations?
Yes. NYC HPD has recorded 269 housing violations at this property.
Is 972 Rutland Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 972 Rutland Road built?
City records list 1931 as the year it was built.
How many apartments are in 972 Rutland Road?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.