456 Blake Avenue
Brooklyn, NY 11212BBL 3-03780-0028Map
Owner of record: 456 Blake Avenue Project LLC
456 Blake Avenue is a walk-up apartment building built in 2023 in Brooklyn, 11212. It has 8 residential units across 4 floors. The owner of record is 456 Blake Avenue Project LLC. HPD has recorded 7 housing violations here, most recently on October 21, 2025. 4 of the 7 most recent violations are still open.
- HPD violations
- 7
- DOB violations
- 10
- ECB violations
- 25
- HPD complaints
- 8
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 7
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 6, 3rd story, 1st apartment from east at south
Oct 21, 2025 · Apt 6
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 1st room from north located at apt 6, 3rd story, 1st apartment from east at south
Oct 21, 2025 · Apt 6
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 6, 3rd story, 1st apartment from east at south
Oct 21, 2025 · Apt 6
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from north located at apt 6, 3rd story, 1st apartment from east at south
Oct 21, 2025 · Apt 6
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 1st room from north located at apt 6, 3rd story, 1st apartment from east at south original violation 18323703 issued 21-oct-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Oct 21, 2025 · Apt 6
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell/buzzer/intercom system from building street entrance to north1 room located at apt 6, 3rd story, 1st apartment from east at south
Oct 21, 2025 · Apt 6
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed
DOB building violations · 10
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 22, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 13, 2014
Dob violation - dismissed - Emergency none
Egncy-emergency none
Jun 16, 2014
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Aug 10, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 4, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 25
- Class - 2
I observed that the construction fence panels at exposures 1& 2 not properly maintained pursuant to subsection according to code 3307.7. panels with multiple gratify, deteriorative with gaps between plywood, bu
Jun 25, 2024 · Penalty $1,000
Resolve - Class - 2
At time of inspection active jobsite. upon request for superintendent logs, inadequate logs provided. pre-printed names of superintendent and competent person on logs. missing signatures of superintendent and c
Jul 18, 2023 · Penalty $625
Resolve - Class - 2
Noted: at time of inspection of an none active jobsite. observed sidewalk shed install at exp # 1 and 2 and no sidewalk shed parapet panel posted.
Mar 25, 2023
Resolve - Class - 2
At the time of my inspection of a 3 story nb. i observed ongoing masonry block work 2nd floor exposure 3 above adjacent property rear yard no ohp in-place & no control access zone. bc 3309.1 protection required
Feb 27, 2023
Resolve - Class - 1
At the time of my inspection of a 3 story nb. i observed at the 2nd floor pipe scaffold not maintained missing planking and guardrail systemstop all use of pipe scaffold on 2nd floor maintain as per code
Feb 27, 2023 · Penalty $6,250
Resolve - Class - 1
Unprotected powerline at the time of inspection on an active job site at 2nd floor level, i observed at exposure 2 hoisting /delivery of materials over sidewalk shed within approximately of 10 feet of unprotec
Jan 31, 2023
Resolve - Class - 1
Missing fire extinguishers (fdny) at the time of inspection on an active job site at 2nd floor level , i observed that no fire extinguishers was on site as per code creating an potential hazardous condition on
Jan 31, 2023 · Penalty $2,500
Resolve - Class - 2
At the time of inspection on an active job site , i observed that there aren't no numbers and stairs designation on floors and interior stairs leading up to the interior of building no signage at floor leve
Jan 31, 2023
Resolve - Class - 2
At the time of inspection on an active job site currently at 2nd floor level , construction superintendent(jierong wu) failed to perform his /her duties- missing fire extinguishers on site, no floor signs poste
Jan 31, 2023
Resolve - Class - 1
At the time of inspection on an active job site at 2nd floor level, no tr1s on file or on site for cold- form steel observed at 1st floor, no letter for cmu storage on c-joist based floor system and also no p
Jan 31, 2023
Resolve
Show 15 more ↓
- Class - 2
At the time of inspection on a active job site at 2nd floor level, i observed no overhead protection at exposure 1 entrance to building and at 2 ,3 or no control access zone in area for active cmu facade w
Jan 31, 2023
Resolve - Class - 2
At the time of inspection on an active job site currently at 2nd floor level, i observed inadequate housekeeping consisting of cmu blocks, metal, garbage bags, scaffolds parts and other construction materials
Jan 31, 2023
Resolve - Class - 1
At the time of inspection on an active jobsite currently at 2nd floor level, i observed a potential tripping hazards at permanent stairs main means of egress treads not solidly infilled .
Jan 31, 2023
Resolve - Class - 2
Construction fence not maintained per code missing viewing panels 3307.7.3 at exposure 1 /jobsite information panel .
Sep 12, 2022 · Penalty $1,000
Resolve - Class - 2
Failure to comply w/the comm's order to file a c of c w/the dob's for notice of violation #35099722m issued on 7/14/14 pursuant to 28-204.4 1rcny 102.01. failure to maintain exterior. visible cracks & gaps at
Sep 9, 2014 · Penalty $2,000
Resolve - Class - 1
Failure to maintain.noted:both step & vertical cracks noted in exterior bldg brick wall.crack gap approx.3"where cracks are,evidence of displacement of wall.rem:obtain permit to correct condition.
Jul 10, 2014 · Penalty $5,000
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner.mult diagonal and horizontal creeks of the bldg exterior & interior throughout bldg all elevations.west elevation foundation crack opening is approx 3"rem:fil
May 18, 2014 · Penalty $2,500
Resolve - Class - 1
Residence altered for occupancy as a dwelling for more than the legally approved # of families.2 family dwelling.cellar converted into 4 sros with bath & kitchen area with hot plate.rem:discontinue illegal use
May 18, 2014 · Penalty $51,000
Resolve - Class - 2
Work w/o a permit work,noted full height partition walls(woodstud & sheetrock),erected creating 4 sros with 3pc bath and kitchen area with hot plate.rem:obtain permit or restore premises to prior legal conditio
May 18, 2014 · Penalty $800
Resolve - Non-hazardous
Failure to maintain bldg-hazardous.defects noted: at west exterior brick wall developed crack approx 3"w x 10'l(center of bldg).from:top of bldg to bottom.also noted:developed crack approx 2"w x 2'l
Aug 9, 2007 · Penalty $800
Resolve - Non-hazardous
Failure to maintain exterior bldg wall. defects noted: multiple cracks approx:6"l - 15'l & approx 1/8"-3" wide in brick exterior wall and foundation wall at west side of bldg. vertical hair line crack approx
Aug 4, 2007 · Penalty $800
Resolve - Hazardous
Failure to maintain bldg.defects noted:multiple hear line cracks in interior sheetrock walls, ceiling and cellar slab,through out 1st and 2nd fl of bldg. remedy:obtain all permits to make all emergency repairs
Aug 4, 2007 · Penalty $2,500
Resolve - Hazardous
Failure to safeguard public and property affected by construction operation. following 1)no fence was provided from adjacent property 444 blake ave debri, lumber was stored on site. 2)improper fence 5',6' high
Apr 2, 2003 · Penalty $5,000
Resolve - Non-hazardous
Work without permit expierd permit upon inspection at above address: -bld. enclosed to roof, insulation installation in progress; drywall instruction in progress permit #301381546 exp. 09/0302 as per office rec
Oct 21, 2002 · Penalty $500
Resolve - Non-hazardous
Failure to provide approved at premises at time of inspection upon inspection at above address bad enclosed to roof; drywall & insulation work in progress; 2"x6" roof roofters in place remedy: stop all work,
Oct 21, 2002 · Penalty $250
Resolve
Complaints
- Safety
Fire escape
Oct 22, 2026 · Apt 8
Open - Door/window
Door
Oct 22, 2026 · Apt 8
Open - Electric
Power outage
Oct 22, 2026 · Apt 8
Open - Electric
Wiring
Oct 22, 2026 · Apt 8
Open - Water leak
Slow leak
Oct 17, 2025 · Apt 6
Close - General
Bell/buzzer/intercom
Oct 17, 2025 · Apt 6
Close - Paint/plaster
Ceiling
Oct 17, 2025 · Apt 6
Close - Nonconst
Vermin
Aug 11, 2007 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2023
- Floors
- 4
- Residential units
- 8
- Building area
- 7,372 ft²
- Lot area
- 3,000 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 42
- Block / lot
- 3780 / 28
- Assessed value
- $488,700
- Landmark / historic district
- No
HPD registration #391549, last renewed Jun 17, 2025.
Questions about 456 Blake Avenue
Who owns 456 Blake Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 456 Blake Avenue Project LLC.
Does 456 Blake Avenue have violations?
Yes. NYC HPD has recorded 7 housing violations at this property.
Is 456 Blake Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 456 Blake Avenue built?
City records list 2023 as the year it was built.
How many apartments are in 456 Blake Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.