912 East 98 Street
Brooklyn, NY 11212BBL 3-03607-0008Map
Owner of record: Rh 912 Saratoga Ave LLC
912 East 98 Street is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 35 residential units across 4 floors. The owner of record is Rh 912 Saratoga Ave LLC. HPD has recorded 1,567 housing violations here, most recently on September 27, 2026. 45 of the 50 most recent violations are still open. City tax records listed 34 rent-stabilized apartments here in 2024.
- HPD violations
- 1,567
- DOB violations
- 21
- ECB violations
- 33
- HPD complaints
- 2,252
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,567
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling in the kitchen located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling throughout in the entire apartment located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north and west wall and west wall in the 3rd room from east located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed north wall in the 3rd room from east located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash at 2nd window from west at north in the bathroom located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective counter balance at lower window sash at 1st window from west at north in the 1st room from east located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out
Show 40 more ↓
- BHazardous
Replace with new the missing door at closet at west wall in the 1st room from east located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - BHazardous
Replace the broken or defective bathtub in the bathroom located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door frame in the entrance located at apt b9, 2nd story, 2nd apartment from west at north
Sep 27, 2026 · Apt B9
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Aug 13, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective fire retardant material over bulkhead door at south
Jul 23, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective marble thread 1st from the bottom leading to bulkhead at south section at public hall, 4th story
Jul 23, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 4th story, 2nd apartment from south at west , section at south
Jul 23, 2026 · Apt 5D
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroom located at apt 5d, 4th story, 2nd apartment from south at west , section at south
Jul 23, 2026 · Apt 5D
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5d, 4th story, 2nd apartment from south at west , section at south
Jul 23, 2026 · Apt 5D
Open — First no access to re- inspect violation - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd story balcony at 2nd stack from east at north exterior wall. at fire escape
Jul 23, 2026
Open — Nov certified on time - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 5d, 4th story, 2nd apartment from south at west , section at south
Jul 23, 2026 · Apt 5D
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 5d, 4th story, 2nd apartment from south at west , section at south
Jul 23, 2026 · Apt 5D
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5d, 4th story, 2nd apartment from south at west , section at south
Jul 23, 2026 · Apt 5D
Open — Civ14 mailed - ANon-hazardous
Provide a upper escutcheon plate at riser in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section at south
Jul 23, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south and west walls in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section at south
Jul 23, 2026 · Apt 3C
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the foyer located at apt 3c, 3rd story, 1st apartment from east at south , section at south
Jul 23, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at north wall in the bathroom located at apt 5d, 4th story, 2nd apartment from south at west , section at south
Jul 23, 2026 · Apt 5D
Open — Civ14 mailed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at . in the entrance located at apt 3c, 3rd story, 1st apartment from east at south , section at south
Jul 23, 2026 · Apt 3C
Open — Civ14 mailed - CImmediately hazardous
Properly repair with similar material the broken or defective marble saddle at intermediate landing at south bulkhead
Jul 23, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at entrance , 1st story
Jul 23, 2026
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at center located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Open — Civ14 mailed - ANon-hazardous
Properly repair or replace the broken or defective 1st door from west at north in the 1st room from east at south located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east at north located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south wall in the bathroom located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the 1st room from east at south located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. ceiling in the bathroom located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Open — Civ14 mailed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the 1st room from east at south located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at chair rails at north wall in the 1st room from east at south located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at south located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the 1st room from east at south located at apt 10d, 4th story, 1st apartment from north at east
Jul 11, 2026 · Apt 10D
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 4th story, 2nd apartment from south at west , section at south
Jul 9, 2026 · Apt 5D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 10d, 4th story, 1st apartment from north at east , section at north
Jul 9, 2026 · Apt 10D
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 2nd story, 2nd apartment from north at east , section at south
Jul 9, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 5b, 2nd story, 2nd apartment from north at east , section at south
Jul 9, 2026 · Apt 5B
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door.
Jul 9, 2026
Closed — Violation closed
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 17, 2014
Dob violation - dismissed - Construction other optional
Due to fire
Feb 17, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 2, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 2, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - dismissed
Show 11 more ↓
- Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Apr 13, 2010
Dob violation - dismissed - Construction other optional
Work w/out permit
Sep 12, 2009
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Nov 20, 1991
Vp*-violation unserved ecb- dismissed
ECB violations · 33
- Class - 1
Failure to obey a vacate order from the commissioner per 28-207.4. at the time of inspection, i observed the cellar level illegally occupied as a class a apartment while under an active partial vacate order for
Jun 23, 2025 · Penalty $12,500
Resolve - Class - 2
Federal steam boiler gas piolit is not hard pipe to regulator+regulator is missing cap+vent limiter+boiler safety valves are painted+missing body drain pipes+abandoned hw boiler has gas pipe not plugged;correct
Jan 23, 2025
Resolve - Class - 1
At time of inspection observed building facade in state of disrepair, at exposure 1,3 and 4 vertical and horizontal cracks at multiple location., maintain exterior building wall
Nov 28, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building wall(s) or appurtenances. noted: at exp #1 4th story, loose bricks sitting on window sill over pedestrian walkway that can become a hazardous condition. exp #1 has cracks in facade,
Aug 9, 2018
Resolve - Class - 2
Failure to comply w/the comm'nrs order to file a cert.of correction w/the dob for nov35090594x issued on 9/16/14 pursuant to 28-204.4 & 1rcny 102-01@time of violation the dob indicate no certificate of correcti
Nov 14, 2014 · Penalty $830
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. observed in cellar missing fire stopping on ceiling various areas throughout entire cellar. remedy: make site safe provide required fire stopping forthwith.
Sep 16, 2014 · Penalty $1,000
Resolve - Class - 1
Failure to comply with the commissioner;s order contained in notice of violation #34995311r issued on 09/13/12.sros in cellar. rem:comply with the commissioner's order.
Feb 22, 2014 · Penalty $2,400
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or bldg dept records:c of o #44000 issued on 4-13-27 states cellar occupancy is ordinary use. cellar at south wing occupied as rec room w/2 beds,hot plate,refrig
Feb 17, 2014 · Penalty $6,000
Resolve - Class - 1
Fail to comply w/commissioner's order contained in nov #34995311r issued on 09/13/12 for work w/o permit in the cellar. rem:comply w/commissioner's order.
Dec 31, 2013 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34995311r issued on 9.13.12 for work w/o permit in the cellar. remedy: complyw/the commissioner's order.
Oct 23, 2013 · Penalty $2,400
Resolve
Show 23 more ↓
- Class - 1
Failure to comply w/the comm's order to correct conditions cited in nov 34995311r issued 9/13/12 for work in cellar w/o a permit. remedy: comply w/the comm's order.
Aug 13, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34995311r issued on 9.13.12. created sro in the cellar. remedy: comply w/the commissioner's order.
Jun 17, 2013 · Penalty $6,000
Resolve - Class - 2
B254,5b,15,24a,32a,50,50a,50b,50c,50d,50e,50f. 50-chimney base door missing; 50a-abandoned ragpac boiler not legally abandoned; 50b-belt guard missing on oil trans pump; 50c-piolit regulator missing cap; 50b
Apr 12, 2013 · Penalty $500
Resolve - Class - 1
Failure to comply w/commissioner's order contained in nov#34995311r issued on 9/13/12. for work w/o a permit created sro's at cellar. rmdy: comply with commissioner's order.
Apr 2, 2013 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34995311r issued on 9/13/12. for creating sro's at cellar. remedy: comply w/the comm's order.
Feb 8, 2013 · Penalty $6,000
Resolve - Class - 2
Failure to comply w/the comm's order to file a c of c w/the dob's for nov #34995312z issued on 9/13/12. remedy: file a c of c.
Dec 14, 2012 · Penalty $800
Resolve - Class - 1
Failure to comply w/the commissioner's order to correct conditions cited in nov #34995311r issued on 9.13.12 for creating sros in cellar. remedy: comply w/code.
Dec 14, 2012 · Penalty $2,400
Resolve - Class - 1
Occupancy contrary to that allowed by the cert of occupancy. noted:illegal occupancy at cellar of sky high deli at north west corner. at cellar currently occupied as 2 sro's with bedding cloths a/c unit & perso
Sep 13, 2012 · Penalty $2,400
Resolve - Class - 1
Work without a permit. at cellar level having erected full height partition with dead bolt locked door to create two separate sro's with south side sro having thru wall interior wall a/c unit discharing not exc
Sep 13, 2012 · Penalty $1,600
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34924802n issued on 8/21/11 pursuant to 28-204.4 & 1rcny 102-01. for failure to maintain - failure
Jan 14, 2012 · Penalty $2,000
Resolve - Class - 2
Failure to comply w/the comm's order to file a c of c w/the dept of buildings for notice of violation #34924803p issued on 8/21/11 pursuant to 28-204.4 & 1rcny 102-01. occupancy contrary violation at cellar.
Jan 14, 2012 · Penalty $2,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #34924802n, 34924803p issued on 8.21.11 pursuant to 28-204.4 &1rcny 102-01. remedy: file a c/c.
Nov 2, 2011 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.failure to provide required adequate means of egress from every flr.cellar occupied as eating & drinking establishment w/bar for birthday party w/50-60 people.t
Aug 21, 2011 · Penalty $1,200
Resolve - Class - 1
Occupancy contrary to that allowed by c/o or bldg dept. records.c/o#44000 issued 04/13/1927 states cellar occupancy is ordinary use.cellar occupied as eating & drinking establishment w/bar for birthday party fo
Aug 21, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to provide unobstructed exit passageway noted blocked egress from fire escape to opening on shed to st level opening has a 2x wood plank from shed to ladder on fire escape then cover w/ plywood preventi
Dec 1, 2010
Resolve - Class - 1
Failure to maintain exterior bldg walls in a code compliant manner noted at all street facing parapet walls leaning cracked displaced w/ brick masonry dislodged and fallen to street in various locations through
Apr 7, 2010 · Penalty $1,000
Resolve - Class - 2
Failure to comply with comm-order to file certificate of correction with dob pursuant to 28-204.2 for violation 34781813n. remedy: file certificate of correction.
Dec 2, 2009 · Penalty $800
Resolve - Class - 3
Work w.o permit. at rear of first fl establishment doing business as valeria's on newport st side of bldg, was a mezzanine const & bath cm.dept record shown no permit issued for said work. remedy: obtain permi
Sep 12, 2009 · Penalty $200
Resolve - Class - 1
Failure to maintain bldg walls and appurtenances note at rear of premises brick chimney has a crack approx 1/8"-1/2"wide running vertically from finished grade to roof lvl crack was painted over approx 3/4 of t
Jul 8, 2009 · Penalty $5,000
Resolve - Hazardous
Occupancy contrary to that allowed by c of o & dob records 2 b rooms created at cellar at south/east.fixtures present.remedy:restore premises to legal occupancy.
Apr 16, 2007 · Penalty $2,500
Resolve - Non-hazardous
Dangerous places and thingsl : note : having installed awning approx 8" from fire escape, obstructing two drop ladders on e 98 st side of building and are on new port ave remedy : provide total clearance for al
May 5, 2004 · Penalty $2,500
Resolve - Non-hazardous
31-a,32,38,40,47.
Nov 20, 1991 · Penalty $250
Resolve - Hazardous
3b,3c,3d,7a,27a,31a,38,40,49,32-hi&low pressuretrol corroded replace. missing covers on pressuretrol replace. 32-chimney clogged must be cleaned from top to bottom.
Nov 14, 1991 · Penalty $170
Resolve
Complaints
- Door/window
Window frame
Sep 2, 2026 · Apt B9
Close - Door/window
Door
Sep 2, 2026 · Apt B9
Close - Door/window
Window frame
Sep 2, 2026 · Apt B9
Close - Plumbing
Bathtub/shower
Sep 2, 2026 · Apt B9
Close - Appliance
Electric/gas range
Sep 2, 2026 · Apt B9
Close - Plumbing
Bathtub/shower
Sep 2, 2026 · Apt B9
Close - Flooring/stairs
Floor
Sep 2, 2026 · Apt B9
Close - Flooring/stairs
Floor
Sep 2, 2026 · Apt B9
Close - Flooring/stairs
Floor
Jul 13, 2026 · Apt C8
Close - Water leak
Damp spot
Jul 13, 2026 · Apt C8
Close
Show 40 more ↓
- Electric
Lighting
Jul 13, 2026 · Apt C8
Close - Plumbing
Bathtub/shower
Jul 13, 2026 · Apt C8
Close - Safety
Carbon monoxide detector
Jul 7, 2026 · Apt 10D
Close - Safety
Fire escape
Jul 7, 2026 · Apt 10D
Close - Paint/plaster
Wall
Jul 7, 2026 · Apt 10D
Close - Door/window
Door
Jul 7, 2026 · Apt 10D
Close - Appliance
Refrigerator
Jul 7, 2026 · Apt 10D
Close - Flooring/stairs
Floor
Jul 7, 2026 · Apt 10D
Close - Electric
Outlet/switch
Jul 7, 2026 · Apt 10D
Close - Paint/plaster
Wall
Jul 7, 2026 · Apt 10D
Close - Door/window
Window frame
Jul 7, 2026 · Apt 10D
Close - Unsanitary condition
Mold
Jul 7, 2026 · Apt 10D
Close - Electric
Lighting
Jul 7, 2026 · Apt 10D
Close - Door/window
Door
Jul 7, 2026 · Apt 10D
Close - Safety
Smoke detector
Jul 7, 2026 · Apt 10D
Close - Paint/plaster
Wall
Jul 7, 2026 · Apt 10D
Close - Plumbing
Water supply
Jul 7, 2026 · Apt 10D
Close - Paint/plaster
Wall
Jun 29, 2026 · Apt 7C
Close - Water leak
Heavy flow
Jun 29, 2026 · Apt 7C
Close - Door/window
Door
Jun 10, 2026 · Apt 3D
Close - Door/window
Window frame
Jun 10, 2026 · Apt 3D
Close - General
Bell/buzzer/intercom
Jun 10, 2026 · Apt 3D
Close - Door/window
Window frame
Jun 10, 2026 · Apt 3D
Close - General
Bell/buzzer/intercom
Jun 7, 2026 · Apt 3D
Close - Door/window
Window frame
Jun 7, 2026 · Apt 3D
Close - Unsanitary condition
Garbage/recycling storage
May 30, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
May 21, 2026 · Apt 5B
Close - Unsanitary condition
Mold
May 19, 2026 · Apt 5B
Close - Door/window
Door frame
May 19, 2026 · Apt 5B
Close - Paint/plaster
Wall
May 14, 2026 · Apt 10C
Open - Unsanitary condition
Mold
May 14, 2026 · Apt 10C
Open - Flooring/stairs
Floor
May 14, 2026 · Apt 10C
Open - Plumbing
Bathtub/shower
May 14, 2026 · Apt 10C
Open - Unsanitary condition
Pests
May 14, 2026 · Apt 10C
Open - Plumbing
Toilet
Apr 14, 2026 · Apt 5B
Close - General
Cabinet
Apr 1, 2026 · Apt 5D
Close - Unsanitary condition
Mold
Apr 1, 2026 · Apt 5D
Close - Unsanitary condition
Pests
Apr 1, 2026 · Apt 5D
Close - Unsanitary condition
Pests
Apr 1, 2026 · Apt 5D
Close - General
Mailbox
Mar 24, 2026 · Apt 10D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1930
- Floors
- 4
- Residential units
- 35
- Building area
- 37,584 ft²
- Lot area
- 12,000 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 3607 / 8
- Assessed value
- $1,938,600
- Landmark / historic district
- No
HPD registration #324928, last renewed Aug 25, 2025.
Questions about 912 East 98 Street
Who owns 912 East 98 Street?
The owner of record in NYC Department of City Planning PLUTO data is Rh 912 Saratoga Ave LLC.
Does 912 East 98 Street have violations?
Yes. NYC HPD has recorded 1,567 housing violations at this property.
Is 912 East 98 Street rent stabilized?
NYC Department of Finance tax bills listed 34 rent-stabilized units here in 2024 (about 97% of its 35 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 912 East 98 Street built?
City records list 1930 as the year it was built.
How many apartments are in 912 East 98 Street?
It has 35 residential units and 36 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.