684 Ralph Avenue
Brooklyn, NY 11212BBL 3-03508-0050Map
Owner of record: NYC Pact Preservation Partners LLC
684 Ralph Avenue is a walk-up apartment building built in 1920 in Brooklyn, 11212. It has 26 residential units across 4 floors. The owner of record is NYC Pact Preservation Partners LLC. HPD has recorded 201 housing violations here, most recently on September 25, 2026. 7 of the 50 most recent violations are still open.
- HPD violations
- 201
- DOB violations
- 21
- ECB violations
- 6
- HPD complaints
- 153
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 201
- ANon-hazardous
Properly secure the loose light switch's at west wall in the private hallway located at apt 2b, 2nd story, 2nd apartment from east at south , section ''east''
Sep 25, 2026 · Apt 2B
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding more than 6 inces from window still at 1st at east exterior wall at fire escape, 2nd story
Sep 25, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder tack weleded, properly secure by using appropriate nuts and bolts to secure at 2nd fire escape from south at east exterior wall at fire escape
Sep 25, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder tack weleded, properly secure by using appropriate nuts and bolts to secure at 1st fire escape from south at east exterior wall at fire escape
Sep 25, 2026
Open — Nov sent out - ANon-hazardous
Properly secure the loose electrical gfi's cover plate at south wall in the kitchen located at apt 2b, 2nd story, 2nd apartment from east at south , section ''east''
Sep 25, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulk head at public hall, 4th story, section at east
May 2, 2026
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 19, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door at south at public hall, 4th story, section ''west''
Apr 19, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of observed sidewalk shed is installed and blocking drop ladder egrees/ingress of building fire escape. creating very unsafe conditions for tenant incase of an emergency or fire at building front at fire escape
Apr 19, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 3f, 3rd story
Nov 26, 2025 · Apt 3F
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 3f, 3rd story
Nov 26, 2025 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south , section ''west''
Nov 19, 2025 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical stopper at bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from east at south , section at east
Oct 20, 2025 · Apt 4B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... (less than 10 sq ft) at ceiling in the foyer located at apt 4b, 4th story, 1st apartment from east at south , section at east
Oct 20, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 4b, 4th story, 1st apartment from east at south , section at east
Oct 20, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the foyer located at apt 4b, 4th story, 1st apartment from east at south , section at east
Oct 20, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules - missing in the entire apartment located at apt 4b, 4th story, 1st apartment from east at south , section at east
Oct 20, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 4th story, 1st apartment from east at south , section at east
Oct 20, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate located at apt 4a, 4th story, 1st apartment from west at north , section at east
Oct 11, 2025 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance at public hall, 1st story
Oct 7, 2025
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from east at south wall in the foyer located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 2nd closet from south at west wall door frame in the foyer located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Replace with new the missing iron baluster to guardrail at, ramp south wall , east section, at public hall, 1st story
Aug 31, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at, hopper door to chute , west section, south wall , at public hall, 1st story
Aug 31, 2025
Closed — Violation closed - BHazardous
Properly secure the loose detached iron handrail at, south wall , to ramp , public hall , 1st story at public hall, 1st story
Aug 31, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at, hopper door to chute , east wall, east section, at public hall, 2nd story
Aug 31, 2025
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at less than 10 sqft at wall and ceiling to roof bulkhead , east section, at public hall, 4th story
Aug 31, 2025
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at less than 10 sqft at wall and ceiling to roof bulkhead , east section, at public hall, 4th story original violation 18198332 issued 31-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Aug 31, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective buldged wood floor planks in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over the ceiling in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling to roof bulkhead , east section, at public hall, 4th story
Aug 31, 2025
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at east, the kitchen , the 3rd room from north located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the 2nd closet from south at west wall door frame, east wall in the foyer located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Aug 31, 2025
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at east located at apt 4a, 4th story, 1st apartment from west at north , section ''east''
Aug 31, 2025 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to north yard at public hall, 1st story
Aug 20, 2025
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures no volume in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east
Aug 20, 2025 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over the ceiling in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the north wall and west wall in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the north wall and west wall in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from south at west in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from west at north
Aug 8, 2025 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st story
Jun 17, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 2nd story, 2nd apartment from north at east
Feb 21, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 4b, 4th story, 1st apartment from east at south
Feb 19, 2025 · Apt 4B
Closed — Violation closed
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed
Show 11 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 6
- Class - 1
A the time of my inspection of a 4 story building, i observed on roof facade repair in operation and there were no overhead protection at exposure #2,3,4 and court yard. failure to provide and maintain overhead
Dec 8, 2025 · Penalty $12,500
Resolve - Class - 1
A the time of my inspection of a 4 story building, i observed on roof facade repair in operation with material hoist installed on roof, upon review of the approved material hoist drawing it was different from t
Dec 8, 2025 · Penalty $6,250
Resolve - Class - 2
During inspection of a 4 story building with a suspended scaffold at exposure #1; dob records revealed that there was no notification made to dob prior to installation of the suspended scaffold as per code requ
Aug 21, 2024 · Penalty $2,500
Resolve - Class - 1
During inspection of a development under alterations, a suspended scaffold at the 4 story level and a suspended scaffold deck sitting and blocking an occupied apartment fire escape. the sidewalk was open to foo
Aug 21, 2024
Resolve - Non-hazardous
6a 50 50a 50b 50a front plates of madlar #2 and 3 is burnt at paits and does not seal flame 50a threaded end on discharge pipe on sabley valve on module #1 50b missing front jacket covers on all 5 modules
Dec 26, 2003
Resolve - Non-hazardous
Refused access.
Aug 23, 1996
Resolve
Complaints
- Door/window
Door
Sep 23, 2026 · Apt 2B
Close - Electric
Outlet/switch
Sep 23, 2026 · Apt 2B
Close - Plumbing
Toilet
Sep 23, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Apr 25, 2026 · Apt 2D
Close - Safety
Fire escape
Apr 8, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Mar 26, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 2C
Close - Safety
Fire escape
Jan 9, 2026 · Apt BLDG
Close - Outside building
Roof door/hatch
Jan 9, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 9, 2026 · Apt 4E
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Dec 6, 2025 · Apt 2B
Close - Plumbing
Toilet
Dec 5, 2025 · Apt 2B
Close - Unsanitary condition
Sewage
Dec 5, 2025 · Apt 2B
Close - Paint/plaster
Wall
Dec 5, 2025 · Apt 2B
Close - Plumbing
Bathtub/shower
Dec 5, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 25, 2025 · Apt 4C
Close - Flooring/stairs
Floor
Nov 13, 2025 · Apt 2B
Close - Electric
Outlet/switch
Nov 13, 2025 · Apt 2B
Close - Paint/plaster
Wall
Nov 13, 2025 · Apt 2B
Close - Plumbing
Toilet
Nov 13, 2025 · Apt 2B
Close - Door/window
Door
Nov 13, 2025 · Apt 2B
Close - Electric
Lighting
Nov 13, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Oct 16, 2025 · Apt 4B
Close - Unsanitary condition
Mold
Oct 16, 2025 · Apt 4B
Close - Water leak
Slow leak
Oct 16, 2025 · Apt 4B
Close - Flooring/stairs
Floor
Oct 2, 2025 · Apt 4A
Close - Paint/plaster
Wall
Oct 2, 2025 · Apt 4A
Close - Flooring/stairs
Floor
Aug 30, 2025 · Apt 4A
Close - Paint/plaster
Wall
Aug 30, 2025 · Apt 4A
Close - Paint/plaster
Ceiling
Aug 30, 2025 · Apt 4A
Close - Door/window
Door
Aug 30, 2025 · Apt 4A
Close - Paint/plaster
Ceiling
Aug 30, 2025 · Apt 4A
Close - Paint/plaster
Ceiling
Aug 30, 2025 · Apt 4A
Close - Paint/plaster
Wall
Aug 20, 2025 · Apt 4A
Close - Plumbing
Water supply
Aug 20, 2025 · Apt 4A
Close - Water leak
Heavy flow
Aug 20, 2025 · Apt 4A
Close - Paint/plaster
Ceiling
Aug 20, 2025 · Apt 4A
Close - Flooring/stairs
Floor
Aug 20, 2025 · Apt 4A
Close - Unsanitary condition
Mold
Aug 20, 2025 · Apt 4A
Close - Plumbing
Water supply
Aug 20, 2025 · Apt 2D
Close - Plumbing
Toilet
Aug 18, 2025 · Apt 2B
Close - Plumbing
Bathtub/shower
Aug 18, 2025 · Apt 2B
Close - Plumbing
Water supply
Aug 15, 2025 · Apt BLDG
Close - Plumbing
Water supply
Aug 12, 2025 · Apt BLDG
Close - Plumbing
Water supply
Aug 12, 2025 · Apt 4A
Close - Plumbing
Water supply
Aug 12, 2025 · Apt 4D
Close - Plumbing
Water supply
Aug 8, 2025 · Apt 4A
Close - Safety
Window guard broken/missing
Aug 6, 2025 · Apt 4A
Close - Plumbing
Water supply
Aug 6, 2025 · Apt 4A
Close - Plumbing
Water supply
Aug 5, 2025 · Apt 3E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 4
- Residential units
- 26
- Building area
- 25,600 ft²
- Lot area
- 16,152 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 3508 / 50
- Assessed value
- $1,224,000
- Landmark / historic district
- No
HPD registration #300904, last renewed Aug 14, 2025.
Questions about 684 Ralph Avenue
Who owns 684 Ralph Avenue?
The owner of record in NYC Department of City Planning PLUTO data is NYC Pact Preservation Partners LLC.
Does 684 Ralph Avenue have violations?
Yes. NYC HPD has recorded 201 housing violations at this property.
Is 684 Ralph Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 684 Ralph Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 684 Ralph Avenue?
It has 26 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.