1573 Bushwick Avenue
Brooklyn, NY 11207BBL 3-03471-0001Map
Owner of record: Chowdhury, Shameem
1573 Bushwick Avenue is a walk-up apartment building built in 1915 in Brooklyn, 11207. It has 10 residential units across 3 floors. The owner of record is Chowdhury, Shameem. HPD has recorded 449 housing violations here, most recently on September 12, 2026. 49 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2023.
- HPD violations
- 449
- DOB violations
- 35
- ECB violations
- 18
- HPD complaints
- 338
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 449
- BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Sep 12, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 12, 2026 · Apt 1
Open — Nov sent out - BHazardous
Replace the broken or defective missing sink in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 12, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 12, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 12, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at east wall in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Sep 12, 2026 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 12, 2026 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective concrete tread at 1st, 3rd, 4th and 5th steps from bottom yard
Sep 8, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Sep 8, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 8, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 8, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Sep 8, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Sep 8, 2026
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall, 1st story
Sep 8, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Sep 8, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Sep 8, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Sep 8, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations .. in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Sep 8, 2026 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling and south wall, greater than 10 square feet in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Sep 8, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective metal cornice at building front at cornice
Sep 8, 2026
Open — Nov sent out - CImmediately hazardous
Replace with new the missing lower base cabinets in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Sep 8, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace with new the missing sink in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Sep 8, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock at entrance door to the building , 1st story
Jan 27, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinges at vestibule door , 1st story
Jan 27, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Jan 7, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Jan 7, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jan 7, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Jan 7, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 7, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 7, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Jan 7, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 7, 2026 · Apt 1
Open — Notice of issuance sent to tenant - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 7, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft at ceiling, east and north wall in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Jan 7, 2026 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 23, 2025 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Open — Info nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1, 1st story, 1st apartment from east at south
Nov 13, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Nov 13, 2025 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixture at the east wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Nov 13, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the wash basin in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Nov 13, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets in the bathtub in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Nov 13, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats yard
Nov 13, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Nov 13, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Nov 13, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Nov 13, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door lock in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Nov 13, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door lock at the boiler at boiler room
Nov 13, 2025
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixture at the south wall in the bathroom located at apt 1, 2nd story, 1st apartment from south at west
Nov 9, 2025 · Apt 1
Open — Nov sent out
DOB building violations · 35
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Immediate emergency anythingoptional
At exp 1(bushwick avenue), install approx, 25 linear feet of sidewalk shed along the entire front of building. at exposure 4(right side of building, along vanderveer street) install approx. 70 linear feet of sidewalk shed, thereby providing protection for the public walkway at the front and right side of the property
Mar 31, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 25 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Construction other optional
C-construction other optional
Mar 5, 1998
Dob violation - active
ECB violations · 18
- Class - 2
Failure to comply with the commissioners orders to file a certificate of correction with the dept of buildings for vio# 35681068k, file a certificate of correction
Aug 17, 2026 · Penalty $1,250
Active - Class - 2
Failure to comply with the commissioners orders to file a certificate of correction with the dept of buildings for vio# 39143218y, file a certificate of correction
Aug 17, 2026 · Penalty $1,250
Active - Class - 2
Atoi observed at ground flr commercial space altered electrical wiring performed which consist of two new wired junction boxes with running bx cable to exposed breaker box. further inspection of electrical exte
Aug 6, 2026 · Penalty $1,250
Active - Class - 1
Atoi observed in commercial space at ground level of occupied bldg exposed ceiling joist showing removed fire stopping. bldg current has living tenants above. further inspection of exposed wiring, spliced conne
Aug 6, 2026 · Penalty $2,500
Active - Class - 2
At time of inspection observed: sidewalk shed installed at expo# 1 & 4 missing project information panel contrary to bc 3301.9.2. creating unsafe conditions for public and occupied adjoining properties, safety
May 22, 2026 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg in code-compliant manner. noted: cornice at exp. 1 and exp 4. in state of disrepair with holes, missing pieces and loose pieces in danger of displacement to lower level and potential to
Apr 3, 2026 · Penalty $25,000
Active - Class - 1
At (exposure 1) front 3rd floor cornice with various holes, (exposure 3) parapet mortar missing and loose bricks, (exposure 4) top northeast corner of building cornice has large hole loose metal. potential for
Mar 29, 2025 · Penalty $12,500
Active - Class - 2
Observed boiler being replaced without a permit. old boiler partially removed. correct all violating conditions
Mar 21, 2025 · Penalty $6,250
Active - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000074874y0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Sep 27, 2024 · Penalty $3,125
Active - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000113304y0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Sep 27, 2024 · Penalty $3,125
Active
Show 8 more ↓
- Class - 2
Occupancy contrary to that allowed by the certificate of occupancy or building department record : at time of inspection of a 4 story bldg. observed at 2nd fl. was occupied with 2 bedrooms , kitchen and full ba
Apr 5, 2023 · Penalty $6,250
Active - Class - 2
Work with out permit : at time of inspection of a 4 story bldg. observed 2nd fl. converted from office to residential with full bathroom, 2 bedrooms and kitchen ( gas and waste line connected). dob records indi
Apr 5, 2023 · Penalty $6,250
Active - Class - 2
Failure to maintain building in code complaint manner : at time of inspection of a 4 story building observed at expo. # 4 at 3rd and 4th fl. window air conditions missing a/c supporting brackets. at vacate 1st
Apr 5, 2023 · Penalty $3,125
Active - Class - 2
Work without permit: noted at 2nd sty apt 4 observed partition walls erected subdividing apt creating additional bedroom., obtain all permits
Mar 8, 2022 · Penalty $6,250
Active - Class - 2
At time of inspection observed excessive debris stored in rear yard behind the car repair shop roger's auto shop along venderveer street side. debris includes burnt wood. auto parts and household stuff., mainta
May 15, 2020 · Penalty $3,125
Resolve - Non-hazardous
Occupancy contrary to that allowed by the building department records:note dob records indicate buildings to be occupied as a multiple dwelling : new 3rd floor illegally occupied as a family day care with appox
Mar 15, 2004 · Penalty $800
Resolve - Hazardous
Failure to maintain. defect is leaks in various areas of first floor celing from second floor. missing fire rating on ceiling of first floor commerical space in many various. make site safe. obtain all nec
Jan 12, 2000 · Penalty $2,500
Active - Hazardous
Failure to maintain. support beam to garage roof area has been damaged causing section of roof area to collapse into garage area creating a hazardous condition south and east brick wall damaged. remedy: make al
Mar 5, 1998
Resolve
Complaints
- Appliance
Electric/gas range
Sep 10, 2026 · Apt 1
Close - Plumbing
Bathtub/shower
Sep 10, 2026 · Apt 1
Close - Unsanitary condition
Pests
Sep 10, 2026 · Apt 1
Close - Unsanitary condition
Mold
Aug 16, 2026 · Apt 1
Close - Appliance
Electric/gas range
Aug 16, 2026 · Apt 1
Close - Flooring/stairs
Floor
Aug 16, 2026 · Apt 1
Close - Plumbing
Basin/sink
Aug 16, 2026 · Apt 1
Close - Unsanitary condition
Pests
Aug 16, 2026 · Apt 1
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt APT1
Close - Paint/plaster
Ceiling
Aug 10, 2026 · Apt APT1
Close
Show 40 more ↓
- Water leak
Heavy flow
Aug 10, 2026 · Apt APT1
Close - Flooring/stairs
Floor
Aug 10, 2026 · Apt APT1
Close - Paint/plaster
Wall
Aug 10, 2026 · Apt APT1
Close - Unsanitary condition
Mold
Aug 10, 2026 · Apt APT1
Close - Plumbing
Basin/sink
Aug 10, 2026 · Apt APT1
Close - Appliance
Electric/gas range
Aug 7, 2026 · Apt 1
Open - Paint/plaster
Ceiling
Aug 7, 2026 · Apt 1
Open - Paint/plaster
Wall
Aug 7, 2026 · Apt 1
Open - Flooring/stairs
Floor
Aug 7, 2026 · Apt 1
Open - Unsanitary condition
Mold
Aug 7, 2026 · Apt 1
Open - Unsanitary condition
Pests
Aug 7, 2026 · Apt 1
Open - Unsanitary condition
Pests
Aug 2, 2026 · Apt 1
Close - Paint/plaster
Wall
Aug 2, 2026 · Apt 1
Close - Flooring/stairs
Floor
Aug 2, 2026 · Apt 1
Close - Flooring/stairs
Floor
May 21, 2026 · Apt 1
Close - Unsanitary condition
Mold
May 21, 2026 · Apt 1
Close - Plumbing
Bathtub/shower
May 21, 2026 · Apt 1
Close - Unsanitary condition
Pests
May 21, 2026 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
May 21, 2026 · Apt 1
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 5, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Jan 5, 2026 · Apt 1
Close - Paint/plaster
Wall
Jan 5, 2026 · Apt 1
Close - Unsanitary condition
Pests
Jan 5, 2026 · Apt 1
Close - Heat/hot water
Entire building
Nov 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 15, 2025 · Apt BLDG
Close - Electric
Lighting
Nov 11, 2025 · Apt 6
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 1STFLO
Close - Electric
Wiring
Nov 11, 2025 · Apt 6
Close - Plumbing
Basin/sink
Nov 11, 2025 · Apt 6
Close - Flooring/stairs
Floor
Nov 11, 2025 · Apt 6
Close - Safety
Smoke detector
Nov 10, 2025 · Apt 1
Close - Safety
Carbon monoxide detector
Nov 10, 2025 · Apt 1
Close - Flooring/stairs
Floor
Nov 10, 2025 · Apt 1
Close - Unsanitary condition
Pests
Nov 10, 2025 · Apt 1
Close - Unsanitary condition
Mold
Nov 10, 2025 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1915
- Floors
- 3
- Residential units
- 10
- Building area
- 14,563 ft²
- Lot area
- 5,100 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3471 / 1
- Assessed value
- $685,800
- Landmark / historic district
- No
HPD registration #310235, last renewed Apr 21, 2021.
Questions about 1573 Bushwick Avenue
Who owns 1573 Bushwick Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Chowdhury, Shameem.
Does 1573 Bushwick Avenue have violations?
Yes. NYC HPD has recorded 449 housing violations at this property.
Is 1573 Bushwick Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2023 (about 60% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1573 Bushwick Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 1573 Bushwick Avenue?
It has 10 residential units and 12 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.