112 Palmetto Street
Brooklyn, NY 11221BBL 3-03350-0011Map
Owner of record: 112-114 Palmetto LLC
112 Palmetto Street is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 6 residential units across 3 floors. The owner of record is 112-114 Palmetto LLC. HPD has recorded 26 housing violations here, most recently on November 19, 2025. 18 of the 26 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 26
- DOB violations
- 17
- ECB violations
- 4
- HPD complaints
- 182
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum acceptable temperature of 130 degrees f at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 2nd apartment from east at south
Nov 19, 2025 · Apt 3R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3r, 3rd story, 2nd apartment from east at south
Nov 19, 2025 · Apt 3R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3r, 3rd story, 2nd apartment from east at south
Nov 19, 2025 · Apt 3R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east original violation 17871256 issued 05-may-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 5, 2025 · Apt 2L
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
May 5, 2025 · Apt 2L
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
May 5, 2025 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
May 5, 2025 · Apt 2L
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 2l, 2nd story, 1st apartment from north at east
May 5, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 3rd room from east located at apt 2l, 2nd story, 1st apartment from north at east
May 5, 2025 · Apt 2L
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tile flooring in the 5th room from east located at apt 2l, 2nd story, 1st apartment from north at east
May 5, 2025 · Apt 2L
Open — Nov sent out
Show 16 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective vinyl tile flooring in the 6th room from east located at apt 2l, 2nd story, 1st apartment from north at east
May 5, 2025 · Apt 2L
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tile flooring in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
May 5, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Properly secure the loose handrail leading to bulkhead at public hall, 3rd story
Aug 11, 2023
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling around skylight at public hall, 3rd story
Aug 11, 2023
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycles at public hall, 2nd story
Aug 11, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective bulkhead door at public hall, 3rd story
Aug 11, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 1, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective (cracked) riser leaking at south wall in the 2nd room from east located at apt 2r, 2nd story, 2nd apartment from north at east
Mar 11, 2021 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Apr 2, 2018 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked at 1st story
Apr 2, 2018
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 28, 2018
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 28, 2018
Open — Nov sent out
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Construction other optional
C-construction other optional
May 17, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
Show 7 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 3
Occupancy contrary to that allowed by the bldg dept records noted cellar arranged as sleeping quarters and bathing quarters (with shower) remedy: discontinue illegal use forthwith
Sep 17, 2008 · Penalty $600
Active - Class - 3
Work w/o a permit work noted full height partitions erected dividing cellar into room w/ bed and plumbing line installed creating 3pc bathroom (w/ vanity water closet shower) remedy: obtain permit or restore
Sep 17, 2008 · Penalty $200
Active - Non-hazardous
B4a, 50a,b,c. 50a- remove wood doors from oil tank rm. 50b- label oil tank. 50c- remove all wood construction in oil tanks rm.
Aug 2, 2006 · Penalty $2,500
Resolve - Hazardous
Failure to maintain building.noted:rear yard of building concrete platform collapsed area of approx 6ftx9ft leaning and opening hazardous.remedy:maintain building.
May 17, 2001 · Penalty $2,500
Resolve
Complaints
- Appliance
Electric/gas range
Jan 27, 2026 · Apt 1L
Open - Heat/hot water
Apartment only
Nov 17, 2025 · Apt 3R
Close - Heat/hot water
Entire building
May 3, 2025 · Apt 2L
Close - Unsanitary condition
Mold
May 3, 2025 · Apt 2L
Close - Paint/plaster
Ceiling
May 3, 2025 · Apt 2L
Close - Flooring/stairs
Floor
May 3, 2025 · Apt 2L
Close - Door/window
Window frame
May 3, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Apr 30, 2025 · Apt BLDG
Close - Door/window
Window frame
Dec 24, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 18, 2022 · Apt 3R
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 18, 2021 · Apt 3R
Close - Unsanitary condition
Mold
Nov 18, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Nov 5, 2021 · Apt BLDG
Close - Plumbing
Radiator
Mar 6, 2021 · Apt 2R
Close - Heat/hot water
Entire building
Jan 30, 2021 · Apt 2L
Close - Heat/hot water
Entire building
Jan 5, 2020 · Apt 1L
Close - Heat/hot water
Entire building
Dec 31, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 18, 2018 · Apt 2R
Close - Heat/hot water
Entire building
Apr 1, 2018 · Apt 1R
Close - Heat/hot water
Entire building
Mar 27, 2018 · Apt 2L
Close - Heat/hot water
Entire building
Jan 8, 2018 · Apt 2R
Close - Heat/hot water
Entire building
Dec 29, 2017 · Apt 2L
Close - Heat/hot water
Entire building
Sep 18, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 16, 2017 · Apt 1R
Close - Paint/plaster
Ceiling
Dec 6, 2016 · Apt 1L
Close - Paint/plaster
Ceiling
Dec 6, 2016 · Apt 1L
Close - Unsanitary condition
Pests
Dec 5, 2016 · Apt 1L
Close - Heating
Heat related
Jan 18, 2011 · Apt 3R
Close - Heating
Heat related
Jan 13, 2011 · Apt BLDG
Close - Heating
Heat related
Jan 13, 2011 · Apt 1R
Close - Heating
Heat related
Jan 13, 2011 · Apt 2N
Close - Heating
Heat related
Jan 13, 2011 · Apt BLDG
Close - Heating
Heat related
Jan 12, 2011 · Apt 3R
Close - Heating
Heat related
Dec 16, 2008 · Apt 1A
Close - General
Windows
Oct 2, 2008 · Apt 2L
Close - Nonconst
Vermin
Oct 2, 2008 · Apt 2L
Close - Electric
Electric-supply
Sep 16, 2008 · Apt 1R
Close - Electric
Electric-supply
Sep 16, 2008 · Apt 1R
Close - Electric
Electric-supply
Sep 16, 2008 · Apt 1R
Close - Electric
Electric-supply
Sep 16, 2008 · Apt 1R
Close - Electric
Lighting
Sep 6, 2008 · Apt 1R
Close - Electric
Lighting
Sep 6, 2008 · Apt 1R
Close - Electric
Lighting
Sep 6, 2008 · Apt 1R
Close - Electric
Lighting
Sep 6, 2008 · Apt 1R
Close - Electric
Wiring
Sep 2, 2008 · Apt 1R
Close - Electric
Wiring
Sep 2, 2008 · Apt 1R
Close - Electric
Electric-supply
Sep 2, 2008 · Apt 1R
Close - Electric
Electric-supply
Sep 2, 2008 · Apt 1R
Close - Electric
Electric-supply
Sep 2, 2008 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 6,480 ft²
- Lot area
- 2,700 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3350 / 11
- Assessed value
- $824,400
- Landmark / historic district
- No
HPD registration #333644, last renewed Oct 6, 2025.
Questions about 112 Palmetto Street
Who owns 112 Palmetto Street?
The owner of record in NYC Department of City Planning PLUTO data is 112-114 Palmetto LLC.
Does 112 Palmetto Street have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 112 Palmetto Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 112 Palmetto Street built?
City records list 1931 as the year it was built.
How many apartments are in 112 Palmetto Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.