319 Menahan Street
Brooklyn, NY 11237BBL 3-03310-0055Map
Owner of record: 319 Menahan Street LLC
319 Menahan Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 319 Menahan Street LLC. HPD has recorded 22 housing violations here, most recently on October 17, 2025. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 22
- DOB violations
- 5
- ECB violations
- 0
- HPD complaints
- 87
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- BHazardous
M/d law abate the nuisance consisting of hook and eye at building entrance , 1st story
Oct 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Oct 17, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Oct 17, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of hook and eye installed at vestibule door , 1st story
Oct 17, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum temperature of 130 degrees. in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Nov 4, 2023 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors at vestibule at public hall, 1st story
Mar 9, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood stool and trim at west window in the kitchen located at apt 3l, 3rd story, 1st apartment from south at west
Jun 3, 2018 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly secure the loose light fixture at ceiling in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from south at west
Jun 3, 2018 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Jun 3, 2018 · Apt 3L
Closed — Violation dismissed
Show 12 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls throughout in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west
Jun 3, 2018 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Jun 3, 2018 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wiring at ceiling in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from south at west
Jun 3, 2018 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly secure the loose tile board at east wall in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Jun 3, 2018 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance of lower sash at west window in the 4th room from north located at apt 3l, 3rd story, 1st apartment from south at west
Jun 3, 2018 · Apt 3L
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 13, 2015
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Mar 17, 2015
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door to cellar locked at public hall, 1st story
Mar 4, 2015
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Mar 4, 2015 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Mar 4, 2015 · Apt 3R
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Mar 4, 2015
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective valve at radiator at south wall in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from north at east
Mar 4, 2015 · Apt 3R
Closed — Violation closed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Nov 11, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Oct 15, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 2, 2023 · Apt 3R
Close - Heat/hot water
Entire building
Dec 4, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 14, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Nov 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 6, 2021 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 3, 2021 · Apt 3R
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Apr 2, 2021 · Apt 3R
Close - Heat/hot water
Apartment only
Mar 24, 2021 · Apt 3R
Close - Heat/hot water
Apartment only
Mar 13, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Mar 7, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 7, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Mar 6, 2021 · Apt 1R
Close - Heat/hot water
Apartment only
Oct 29, 2020 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 15, 2019 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 5, 2019 · Apt 3R
Close - Heat/hot water
Apartment only
May 13, 2019 · Apt 3R
Close - Heat/hot water
Apartment only
Apr 30, 2019 · Apt 3R
Close - Heat/hot water
Apartment only
Mar 29, 2019 · Apt 3R
Close - Heat/hot water
Apartment only
Oct 31, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Oct 26, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Oct 22, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Oct 20, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Oct 18, 2018 · Apt 3R
Close - Paint/plaster
Ceiling
May 15, 2018 · Apt 3L
Close - Paint/plaster
Wall
May 15, 2018 · Apt 3L
Close - Paint/plaster
Wall
May 15, 2018 · Apt 3L
Close - Electric
Lighting
May 15, 2018 · Apt 3L
Close - Door/window
Window frame
May 15, 2018 · Apt 3L
Close - Plumbing
Toilet
May 15, 2018 · Apt 3L
Close - Heat/hot water
Apartment only
Mar 14, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 2, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 1, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 9, 2017 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 8, 2017 · Apt 3R
Close - Heat/hot water
Entire building
Apr 8, 2017 · Apt 1
Close - Heat/hot water
Apartment only
Feb 2, 2017 · Apt 3L
Close - Heat/hot water
Entire building
Jan 16, 2017 · Apt 1R
Close - Heat/hot water
Apartment only
Jan 4, 2017 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 30, 2016 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 17, 2016 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 13, 2016 · Apt 3R
Close - Heat/hot water
Entire building
Nov 18, 2015 · Apt 3R
Close - Heat/hot water
Entire building
Oct 18, 2015 · Apt 1R
Close - Heat/hot water
Entire building
Jul 30, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 29, 2015 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,778 ft²
- Lot area
- 2,450 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3310 / 55
- Assessed value
- $591,750
- Landmark / historic district
- No
HPD registration #366421, last renewed Jun 26, 2026.
Questions about 319 Menahan Street
Who owns 319 Menahan Street?
The owner of record in NYC Department of City Planning PLUTO data is 319 Menahan Street LLC.
Does 319 Menahan Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 319 Menahan Street rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 67% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 319 Menahan Street built?
City records list 1931 as the year it was built.
How many apartments are in 319 Menahan Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.