1361 Greene Avenue
Brooklyn, NY 11237BBL 3-03289-0039Map
Owner of record: 1361 Greene LLC
1361 Greene Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 1361 Greene LLC. HPD has recorded 65 housing violations here, most recently on January 26, 2021. 3 of the 50 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 65
- DOB violations
- 15
- ECB violations
- 8
- HPD complaints
- 310
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Jan 26, 2021 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Jan 26, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 1st room from north located at apt 2l, 2nd story, apartment at west
Aug 22, 2016 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the celing in the bathroom located at apt 2l, 2nd story, apartment at south
Aug 4, 2016 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and the west wall in the 4th room from east located at apt 2l, 2nd story, apartment at south
Aug 4, 2016 · Apt 2L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the west wall in the 4th room from east located at apt 2l, 2nd story, apartment at south
Aug 4, 2016 · Apt 2L
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at the wash basin in the bathroom located at apt 2l, 2nd story, apartment at south
Aug 4, 2016 · Apt 2L
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 14, 2015
Closed — Violation closed - IInformation / order
The premises have been vacated by an order of this department and cannot be reoccupied except for caretaker until a new certificate of occupancy has been obtained.
May 1, 2014
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective badly sagging and sloping wood floor in kitchen . danger of collapsing -approx -50sq ft. in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Apr 24, 2014 · Apt 2L
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Provide temporary securing of all windows and doors to building.
Apr 24, 2014
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarding ceiling at cellar
Apr 24, 2014
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective sagging wood rafters at roof
Apr 24, 2014
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire retarding walls, ceilings and partitions removed all stories throughout the building.
Apr 24, 2014
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective badly rotted and sagging floor joists at rear , 1st story
Apr 24, 2014
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective badly rotted and sagging floor joists at rear , 2nd story
Apr 24, 2014
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective badly rotted and sagging floor joists at rear , 3rd story
Apr 24, 2014
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective dangerously cracked and sloping cement ceramic tile floor in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Apr 24, 2014 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south
Mar 12, 2014 · Apt 2L
Closed — Violation closed - BHazardous
Replace with new the broken or defective floor ceramic tiles in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Mar 12, 2014 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2l, 2nd story, apartment at west
Feb 21, 2014 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2l, 2nd story, apartment at west
Feb 21, 2014 · Apt 2L
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jun 28, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Jun 28, 2013 · Apt 2L
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Jun 28, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balances at lower window sash in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Jun 28, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 2l, 2nd story, apartment at south
Jan 31, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 2l, 2nd story, apartment at south
Jan 31, 2013 · Apt 2L
Closed — Violation closed - ANon-hazardous
Repair leaky water closet flush pipe connection , in the bathroom located at apt 2l, 2nd story, apartment at south
Jan 31, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2l, 2nd story, apartment at south
Aug 15, 2012 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor in the bathroom located at apt 2l, 2nd story, apartment at south
Aug 15, 2012 · Apt 2L
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2l, 2nd story, apartment at south
Aug 15, 2012 · Apt 2L
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2l, 2nd story, apartment at south
Aug 15, 2012 · Apt 2L
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the kitchen located at apt 1l, 1st story, apartment at west
Jul 15, 2012 · Apt 1L
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2l, 2nd story, apartment at south
Jul 11, 2012 · Apt 2L
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2l, 2nd story, apartment at south
Jul 11, 2012 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. north wall in the kitchen located at apt 1l, 1st story, apartment at south
Mar 25, 2001 · Apt 1L
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling, north wall, south wall in the 1st room from east located at apt 1l, 1st story, apartment at south
Mar 25, 2001 · Apt 1L
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. south wall, east wall in the 2nd room from east located at apt 1l, 1st story, apartment at south
Mar 25, 2001 · Apt 1L
Open — First no access to re- inspect violation - BHazardous
Remove all obstructions and repair all defects in wasteline washbasin bathroom basement duplex apt 1 located at apt 1
Jan 21, 1997 · Apt 1
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing 1 sty apt 1 johnson located at apt 1
Jan 21, 1997 · Apt 1
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles etc 1 sty public hall
Jan 21, 1997
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at radiator front room 1 sty apt 1 located at apt 1
Jan 21, 1997 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective wood frame door between front and center rooms 1 sty apt 1 located at apt 1
Jan 21, 1997 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Refit door at bathroom basment duplex apt 1 located at apt 1
Jan 21, 1997 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling bathroom basement duplex apt 1 located at apt 1
Jan 21, 1997 · Apt 1
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of exposed elctrical wires ceiling front room basement duplex apt 1 located at apt 1
Jan 21, 1997 · Apt 1
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin mice and roaches thru out basment duplex apt 1 located at apt 1
Jan 21, 1997 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling front room basement duplex apt 1 located at apt 1
Jan 21, 1997 · Apt 1
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors entrance 3 sty east apt 3r
Jul 31, 1992
Closed — Violation closed
DOB building violations · 15
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 23, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 23, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 21, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 21, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 21, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
May 3, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
Show 5 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 8
- Class - 2
Failure to comply w/the comm's order to file a cert.of correction w/the dob for nov 35034691l issued on 2/25/14 pursuant to 28-204.4 & 1rcny 102-01.remedy:file a cert.of correction.
Apr 26, 2014
Resolve - Class - 2
Failure to comply w/the comm's order to file a cert.of correction w/the dob for nov 35034688k issued on 02/25/14pursuant to 28-204.4 & 1rcny 102-01.remedy:file a cert.of correction
Apr 26, 2014
Resolve - Class - 1
Failure to maintain building in code-compliant manner.note:floor beams rotten broken & sagging causing floor and roof in danger of collapse @ 2nd nd 3rd story rear apts.structural stability in(qustion)due to st
Apr 24, 2014 · Penalty $1,000
Resolve - Class - 1
Failure to safeguard all persons and prop affected by const operationsnote:permit #320422912 obtain relocate bathroom & kitchen throughout bldg.due to construction operation & removal of interior structural bea
Apr 24, 2014
Resolve - Class - 2
Failure to post permit. alt 2 permit #320422912-01 active and not posted. rmdy: post permit.
Feb 25, 2014
Resolve - Class - 1
28-104.8.4 failure to provide tenant protection plan.submitted pwi does not indicate bldg to be occupied during alteration.during inspc apt 2l is occupied and work has commenced throughout bldg. noted: no work
Feb 25, 2014 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. noted: 1-occupied apt #2l has ceiling sheetrock over sink in kitchen ara missing/falling down; 2-no week at inspection,doors for
Feb 25, 2014 · Penalty $2,400
Resolve - Class - 1
Filed a certificate,form,application ect.containing a false statement.noted: pwi secion 26 indicates a no for owners certification regardingoccupied housing.upon inspection apt 2l is occupied.rmdy:comply w/code
Feb 25, 2014
Resolve
Complaints
- Unsanitary condition
Pests
Aug 21, 2026 · Apt 3R
Close - Unsanitary condition
Sewage
Aug 20, 2026 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Jun 10, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
May 21, 2024 · Apt 1R
Close - Electric
Wiring
Feb 14, 2022 · Apt 2L
Close - General
Ventilation system
Feb 9, 2022 · Apt 2L
Close - Electric
Wiring
Feb 9, 2022 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 9, 2022 · Apt 2L
Close - Heat/hot water
Entire building
Jan 24, 2021 · Apt 2R
Close - Unsanitary condition
Mold
Aug 24, 2016 · Apt 1R
Close
Show 40 more ↓
- Unsanitary condition
Mold
Aug 24, 2016 · Apt 1R
Close - Plumbing
Water supply
Aug 8, 2016 · Apt 2L
Close - Paint/plaster
Ceiling
Aug 8, 2016 · Apt 2L
Close - Water leak
Slow leak
Jul 27, 2016 · Apt 2L
Close - Plumbing
Water supply
Jul 27, 2016 · Apt 2L
Close - Paint/plaster
Ceiling
Jul 27, 2016 · Apt 2L
Close - Plumbing
Water supply
Aug 7, 2015 · Apt 3R
Close - Appliance
Electric/gas range
Aug 7, 2015 · Apt 3R
Close - Paint/plaster
Wall
Aug 7, 2015 · Apt 2L
Close - Plumbing
Water supply
Aug 7, 2015 · Apt 2L
Close - Paint/plaster
Ceiling
Feb 22, 2014 · Apt 2L
Close - Heating
Heat related
Feb 22, 2014 · Apt 2L
Close - Heating
Heat related
Feb 19, 2014 · Apt 2L
Close - Heating
Heat related
Feb 12, 2014 · Apt 2L
Close - General
Fire-escape
Oct 25, 2013 · Apt BLDG
Close - Plumbing
Shower-stall
Oct 22, 2013 · Apt 2L
Close - Nonconst
Vermin
Oct 22, 2013 · Apt 2L
Close - General
Windows
Oct 22, 2013 · Apt 2L
Close - Nonconst
Rubbish
Oct 22, 2013 · Apt 2L
Close - Plumbing
Toilet
Oct 22, 2013 · Apt 2L
Close - General
Ceramic-tile
Oct 22, 2013 · Apt 2L
Close - General
Mold
Oct 22, 2013 · Apt 2L
Close - Plumbing
Basin/sink
Oct 22, 2013 · Apt 2L
Close - General
Floor
Sep 9, 2013 · Apt 1
Close - General
Doors
Sep 9, 2013 · Apt BLDG
Close - Electric
Lighting
Jun 26, 2013 · Apt 1L
Close - Plumbing
Water-leaks
Jun 26, 2013 · Apt 1L
Close - Paint/plaster
Ceiling
Jun 26, 2013 · Apt 1L
Close - General
Mold
Jun 26, 2013 · Apt 1L
Close - Electric
Wiring
Jun 26, 2013 · Apt 1L
Close - General
Windows
Jun 26, 2013 · Apt 2L
Close - Plumbing
Bathtub/shower
Jun 26, 2013 · Apt 2L
Close - Nonconst
Vermin
Jun 26, 2013 · Apt 2L
Close - Heating
Heat related
Jan 23, 2013 · Apt 1L
Close - Heating
Heat related
Jan 23, 2013 · Apt NA
Close - Heating
Heat related
Jan 23, 2013 · Apt 2L
Close - Plumbing
Bathtub/shower
Jan 23, 2013 · Apt 1R
Close - Construction
Pavement
Jan 23, 2013 · Apt 2L
Close - General
Doors
Jan 23, 2013 · Apt 2L
Close - Plumbing
Bathtub/shower
Jan 23, 2013 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,275 ft²
- Lot area
- 1,953 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3289 / 39
- Assessed value
- $544,950
- Landmark / historic district
- No
HPD registration #304096, last renewed Jul 30, 2026.
Questions about 1361 Greene Avenue
Who owns 1361 Greene Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1361 Greene LLC.
Does 1361 Greene Avenue have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 1361 Greene Avenue rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 17% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1361 Greene Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 1361 Greene Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.