405 Himrod Street
Brooklyn, NY 11237BBL 3-03272-0045Map
Owner of record: 405 Himrod Street LLC
405 Himrod Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 405 Himrod Street LLC. HPD has recorded 33 housing violations here, most recently on August 18, 2026. 27 of the 33 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2019.
- HPD violations
- 33
- DOB violations
- 4
- ECB violations
- 3
- HPD complaints
- 53
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 33
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 1 sq ft of mold observed at ceailing in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Aug 18, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 18, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 18, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing signage at public hall, 1st story
Aug 18, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing signage
Aug 18, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 18, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Aug 1, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Aug 1, 2026 · Apt 1L
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet observed at ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Aug 1, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet observed at south wall in the 4th room from east located at apt 1l lower level, 1st story, 1st apartment from east at south
Aug 1, 2026 · Apt 1L
Open — Notice of issuance sent to tenant
Show 23 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet observed at south wall in the 1st room from east located at apt 1l lower level, 1st story, 1st apartment from east at south
Aug 1, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 9, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles on floor in the bathroom located at apt 2r, 2nd story, apartment at east
Apr 27, 2015 · Apt 2R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2r, 2nd story, apartment at east
Apr 27, 2015 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2r, 2nd story, apartment at east
May 21, 2014 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cement and ceramic tile floor in the bathroom located at apt 2r, 2nd story, apartment at east
May 21, 2014 · Apt 2R
Open — Not complied with - ANon-hazardous
Refit lower sash south two window in the 5th room from north located at apt 2r, 2nd story, apartment at east
May 21, 2014 · Apt 2R
Open — Nov certified late - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak concealed water leak at ceiling in the bathroom located at apt 2r, 2nd story, apartment at east
May 21, 2014 · Apt 2R
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective electrical outlet east wall in the 3rd room from north located at apt 2r, 2nd story, apartment at east
May 21, 2014 · Apt 2R
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the 5th room from north located at apt 2r, 2nd story, apartment at east
May 21, 2014 · Apt 2R
Open — Nov certified late - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2r, 2nd story
May 21, 2014 · Apt 2R
Open — Not complied with - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2r, 2nd story
May 21, 2014 · Apt 2R
Open — Not complied with - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling 3rd room from front 3 sty west apt 3l irrizary no phone er1. , section '' ''
Aug 22, 1989 · Apt 3L
Open — Nov certified late - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling at front 2 sty west apt 2l front room maton 636 1998. , section '' ''
Feb 26, 1989 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint walls & ceiling 2 sty west apt 2l bathroom matos 636 1998. , section '' ''
Feb 26, 1989 · Apt 2L
Open — Nov sent out
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 17, 1992
Dob violation - active
ECB violations · 3
- Class - 3
Work w/out permit.noted:at front of premises installed construction wood fence.no permit on file for construction equipment/fence.all wrr completed. remedy: obtain
Jul 19, 2021 · Penalty $500
Active - Class - 2
Failure to maintain adequate housekeeping: noted: job done under permit#322068365 ex9 2/19/21. at rear of premises in yard,observed approx 30 yards of construction debris,consisting of flooring,wood scraps,plas
Nov 6, 2020 · Penalty $3,125
Resolve - Class - 2
As per the dob application# 321948522 and approved plans work to be performed including interior demolition at cellar and ground floor only. observed: full interior demolition including interior drywall partiti
Jan 7, 2020 · Penalty $3,125
Resolve
Complaints
- Unsanitary condition
Mold
Jul 31, 2026 · Apt 1L
Close - Unsanitary condition
Mold
Jul 30, 2026 · Apt 1L
Close - Water leak
Heavy flow
Jul 30, 2026 · Apt 1L
Close - Heat/hot water
Apartment only
Jul 30, 2026 · Apt 1L
Close - General
Ventilation system
Jun 28, 2026 · Apt 3R
Close - General
Bell/buzzer/intercom
Feb 22, 2026 · Apt 1L
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 3R
Close - Unsanitary condition
Pests
Dec 16, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Feb 14, 2024 · Apt 3R
Close - General
Signage missing
Oct 27, 2019 · Apt BLDG
Close
Show 40 more ↓
- Electric
No lighting
Oct 27, 2019 · Apt BLDG
Close - Safety
Window guard broken/missing
Oct 27, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 27, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 27, 2019 · Apt BLDG
Close - Plumbing
Bathtub/shower
Oct 27, 2019 · Apt 2L
Close - Unsanitary condition
Pests
Oct 27, 2019 · Apt 2L
Close - Safety
Carbon monoxide detector
Oct 27, 2019 · Apt 2L
Close - Flooring/stairs
Floor
Oct 27, 2019 · Apt 2L
Close - Paint/plaster
Window/frame
Oct 27, 2019 · Apt 2L
Close - Electric
No lighting
Oct 27, 2019 · Apt 2L
Close - Heat/hot water
Entire building
Oct 27, 2019 · Apt 2L
Close - Door/window
Door frame
Oct 26, 2019 · Apt 1
Close - General
Bell/buzzer/intercom
Oct 26, 2019 · Apt 1
Close - Flooring/stairs
Floor
Aug 1, 2016 · Apt 3L
Close - Flooring/stairs
Floor
Aug 1, 2016 · Apt 3L
Close - Flooring/stairs
Floor
Aug 1, 2016 · Apt 3L
Close - Door/window
Door
Aug 1, 2016 · Apt 3L
Close - Heat/hot water
Entire building
Nov 14, 2015 · Apt 1R
Close - Unsanitary condition
Pests
Oct 23, 2014 · Apt 2R
Close - Flooring/stairs
Floor
Oct 23, 2014 · Apt 2R
Close - Paint/plaster
Wall
Oct 23, 2014 · Apt 2R
Close - Unsanitary condition
Pests
Oct 23, 2014 · Apt 2R
Close - Flooring/stairs
Floor
Jun 5, 2014 · Apt 2R
Close - Paint/plaster
Ceiling
Jun 5, 2014 · Apt 2R
Close - Plumbing
Bathtub/shower
May 19, 2014 · Apt 2R
Close - Paint/plaster
Wall
May 19, 2014 · Apt 2R
Close - Electric
Power outage
May 19, 2014 · Apt 2R
Close - Electric
Outlet/switch
May 19, 2014 · Apt 2R
Close - Water leak
Slow leak
May 19, 2014 · Apt 2R
Close - Door/window
Window frame
May 19, 2014 · Apt 2R
Close - Paint/plaster
Ceiling
May 19, 2014 · Apt 2R
Close - Heating
Heat related
Nov 25, 2005 · Apt 3R
Close - Heating
Heat related
Nov 24, 2005 · Apt 3R
Close - Nonconst
Vermin
Mar 22, 2004 · Apt 3L
Close - Heating
Heat related
Mar 22, 2004 · Apt 3L
Close - Heating
Heat related
Mar 13, 2004 · Apt BLDG
Close - Heating
Heat related
Mar 12, 2004 · Apt BLDG
Close - Heating
Heat related
Mar 10, 2004 · Apt 2L
Close - Heating
Heat related
Mar 10, 2004 · Apt 2L
Close - Heating
Heat related
Mar 8, 2004 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,875 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3272 / 45
- Assessed value
- $566,550
- Landmark / historic district
- No
HPD registration #370574, last renewed Aug 1, 2023.
Questions about 405 Himrod Street
Who owns 405 Himrod Street?
The owner of record in NYC Department of City Planning PLUTO data is 405 Himrod Street LLC.
Does 405 Himrod Street have violations?
Yes. NYC HPD has recorded 33 housing violations at this property.
Is 405 Himrod Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2019 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 405 Himrod Street built?
City records list 1931 as the year it was built.
How many apartments are in 405 Himrod Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.