259 Himrod Street
Brooklyn, NY 11237BBL 3-03269-0039Map
Owner of record: Bongiovi, Luz Stella
259 Himrod Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is Bongiovi, Luz Stella. HPD has recorded 19 housing violations here, most recently on April 9, 2021. 4 of the 19 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 19
- DOB violations
- 14
- ECB violations
- 1
- HPD complaints
- 9
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 19
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation .. 1st radiator from south at west wall, ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color .. west wall, east wall, south wall in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color .. east wall, ceiling in the private hallway located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. 1st door frame from east at south wall in the private hallway located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... 15 sq feet at south wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall in the private hallway located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, north wall, 1st wall cabinet from west at north wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Open — Invalid certification
Show 9 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) south wall in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Open — Invalid certification - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north
Aug 24, 2012 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from west at north
Aug 16, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Aug 16, 2012 · Apt 3R
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Aug 16, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Aug 16, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Aug 16, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Aug 16, 2012 · Apt 3R
Closed — Violation closed - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door .. in the entrance located at apt 3r, 3rd story, 1st apartment from west at north
Aug 16, 2012 · Apt 3R
Closed — Violation closed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 4 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
ECB violations · 1
- Class - 2
Weilmclain eg-75 boiler=water leak at gas meters+incorrect discharge pipe@hwh safety valve;correct violation+submit certificate of correction
Oct 10, 2024 · Penalty $3,125
Active
Complaints
- Plumbing
Basin/sink
Aug 10, 2012 · Apt 3R
Close - General
Floor
Aug 10, 2012 · Apt 3R
Close - General
Floor
Aug 10, 2012 · Apt 3R
Close - General
Mold
Aug 10, 2012 · Apt 3R
Close - Plumbing
Water-leaks
Aug 10, 2012 · Apt 3R
Close - Paint/plaster
Wall
Aug 10, 2012 · Apt 3R
Close - Plumbing
Water-leaks
Aug 10, 2012 · Apt 3R
Close - Plumbing
Toilet
Aug 10, 2012 · Apt 3R
Close - Paint/plaster
Ceiling
Aug 10, 2012 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,500 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3269 / 39
- Assessed value
- $557,100
- Landmark / historic district
- No
HPD registration #324320, last renewed Aug 24, 2025.
Questions about 259 Himrod Street
Who owns 259 Himrod Street?
The owner of record in NYC Department of City Planning PLUTO data is Bongiovi, Luz Stella.
Does 259 Himrod Street have violations?
Yes. NYC HPD has recorded 19 housing violations at this property.
Is 259 Himrod Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 83% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 259 Himrod Street built?
City records list 1931 as the year it was built.
How many apartments are in 259 Himrod Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.