173 Himrod Street
Brooklyn, NY 11221BBL 3-03266-0038Map
Owner of record: Galeano, Maria B
173 Himrod Street is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 6 residential units across 3 floors. The owner of record is Galeano, Maria B. HPD has recorded 9 housing violations here, most recently on December 5, 2007. 9 of the 9 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 9
- DOB violations
- 5
- ECB violations
- 0
- HPD complaints
- 5
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the 4th room from north at west located at apt 3l, 3rd story, 1st apartment from south at west
Dec 5, 2007 · Apt 3L
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Dec 5, 2007 · Apt 3L
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from south at west wall in the kitchen located at apt 3l, 3rd story, 1st apartment from south at west
Dec 5, 2007 · Apt 3L
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st closet from west at north wall door frame, 1st door frame from west at north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from north at east located at apt 3l, 3rd story, 1st apartment from south at west
Dec 5, 2007 · Apt 3L
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective plasterboard ceiling center west cellar.
Aug 10, 1987
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance to 1 sty east apt 1r. located at apt 1r
Aug 10, 1987 · Apt 1R
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance to 1 sty west apt 1l. located at apt 1l
Aug 10, 1987 · Apt 1L
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance to 2 sty east apt 2r. located at apt 2r
Aug 10, 1987 · Apt 2R
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance to 3 sty east apt 3r. located at apt 3r
Aug 10, 1987 · Apt 3R
Open — Nov sent out
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Jan 21, 2016 · Apt 2R
Close - Heating
Heat related
May 18, 2008 · Apt BLDG
Close - Heating
Heat related
Nov 29, 2007 · Apt 3L
Close - General
Mold
Nov 29, 2007 · Apt 3L
Close - Nonconst
Janitor/super
Nov 29, 2007 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 6,240 ft²
- Lot area
- 2,450 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3266 / 38
- Assessed value
- $687,600
- Landmark / historic district
- No
HPD registration #337588, last renewed Jul 29, 2026.
Questions about 173 Himrod Street
Who owns 173 Himrod Street?
The owner of record in NYC Department of City Planning PLUTO data is Galeano, Maria B.
Does 173 Himrod Street have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 173 Himrod Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 173 Himrod Street built?
City records list 1931 as the year it was built.
How many apartments are in 173 Himrod Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.