253 Stanhope Street
Brooklyn, NY 11237BBL 3-03258-0044Map
Owner of record: 253 Stanhope St. LLC
253 Stanhope Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 253 Stanhope St. LLC. HPD has recorded 117 housing violations here, most recently on June 6, 2026. 8 of the 50 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 117
- DOB violations
- 15
- ECB violations
- 10
- HPD complaints
- 276
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 117
- ANon-hazardous
Refit door in the 4th room from east located at apt 3l, 3rd story, 1st apartment from east at south
Jun 6, 2026 · Apt 3L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 3l, 3rd story, 1st apartment from east at south
Jun 6, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south
Jun 6, 2026 · Apt 3L
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south
Jun 6, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south
Jun 6, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
May 27, 2024 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
May 27, 2024 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
May 27, 2024 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
May 27, 2024 · Apt 3R
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile approx 6 sq feet in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
May 27, 2024 · Apt 3R
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at north and east walls in the 1st room from north at west located at apt 1r lower level, 1st story, 1st apartment from north at east
Sep 1, 2021 · Apt 1R
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north and east walls and ceiling in the 1st room from north at west located at apt 1r lower level, 1st story, 1st apartment from north at east
Sep 1, 2021 · Apt 1R
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective rain leader at north exterior wall of building at north yard
Sep 1, 2021
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from north at east
Sep 25, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from north at east
Sep 25, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Sep 25, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Sep 25, 2019 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to repair = 4; wg to replace = 0; in the entire apartment located at apt 3r, 3rd story, apartment at east
Mar 29, 2019 · Apt 3R
Closed — Violation closed - BHazardous
Replace or repair the self-closing the doors that is missing or defective at north entrance located at apt 3r, 3rd story, apartment at east
Mar 29, 2019 · Apt 3R
Closed — Violation closed - BHazardous
Replace or repair the self-closing the doors that is missing or defective at south entrance located at apt 3r, 3rd story, apartment at east
Mar 29, 2019 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Mar 8, 2019 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Mar 8, 2019 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the missing electrical light switch cover plate at south in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Mar 8, 2019 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Feb 22, 2019 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 22, 2019 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door frame from north at east wall, north wall, south wall in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 22, 2019 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, north wall, east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 22, 2019 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 22, 2019 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 3; in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Feb 22, 2019 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the missing electric outlet cover at south wall in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 22, 2019 · Apt 3R
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3r, 3rd story, 1st apartment from west at north
Feb 22, 2019 · Apt 3R
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 19, 2018
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from south at west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north
Sep 11, 2018 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, south wall, 1st wall cabinet from east at south wall, 5th wall cabinet from east at south wall in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Sep 11, 2018 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall, 1st window frame from south at west wall in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Sep 11, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective ,, in the entrance located at apt 3r, 3rd story, 1st apartment from west at north
Sep 11, 2018 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, south wall in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Sep 11, 2018 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Sep 11, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Sep 11, 2018 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, west wall, 1st window frame from south at west wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Sep 11, 2018 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Aug 1, 2018 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Aug 1, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 3r, 3rd story, 1st apartment from east at south
Dec 5, 2017 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 3r, 3rd story, 1st apartment from east at south
Dec 5, 2017 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperture of 130 degrees at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Dec 5, 2017 · Apt 3R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of an uncaped gas line at east wall in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
Dec 5, 2017 · Apt 3R
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
Dec 5, 2017 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Nov 8, 2017 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the missing radiator in the 1st room from east located at apt 3r, 3rd story, 1st apartment from north at east
Nov 8, 2017 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell / buzzer intercom system in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Nov 8, 2017 · Apt 3R
Closed — Violation closed
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed
Show 5 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 10
- Class - 2
Failure to have new or alterated plumbing system (). installed new gasboiler b-gas hot water heaters. gas line in cellar and all floors for dryers risers. rmdy: perform tests.
Feb 11, 2016 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: use of prohibited door &/or hardware per bc 1008.1.8;27-371(j). noted: at bulkhead door slide bolt locking device installed. remedy: provide legal hardware.
Feb 11, 2016 · Penalty $500
Resolve - Class - 2
Electrical work w/o a permit. observed at 10:45am branch circuit wiring installed for outlets,fixtures,switches panels,boilers 413 feeders in all apts & basement. no appl is on file for new electrical work thro
Feb 11, 2016 · Penalty $400
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment devices apparatus materials appliances or wiring in use. defective electrical fixture in use in apt 3r & hallways. remedy: comply w/ec code.
Feb 11, 2016 · Penalty $400
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: no fire stopping per bc 712.3;27-345. noted: apt #2r ceiling no fire stopping. apt #3r directly above is occupied. hpd notified for fire guard. remedy: provide
Feb 11, 2016
Resolve - Class - 1
Failure to ground electrical system. no ground conductor provided to service switch in basement 200amp ser/sw. remedy: provide grounding.
Feb 11, 2016 · Penalty $12,000
Resolve - Class - 1
Work no permit observed on feb 11,2016 at 11am installed new gas linesin bst and all flrs for gas; dryers,hot water heaters 6 new gas boilernot part o fappl#321137382. stop all plumbing work entire posted.rmdy:
Feb 11, 2016 · Penalty $1,600
Resolve - Class - 2
Gas being supplied to building w/o inspection/certification by dob. observed on 2/11/16 at 11:15am gas boiler,hot water heater for apt 3r in use. no certification by dob for use. rmdy: file for necessary test
Feb 11, 2016 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances. noted: at exp#3 defective fire escape ladder/shoe. missing staricase at exp#3 to retainig wall. excessive debris at exp#3. remedy: maintain exterior bldg wall,
Feb 11, 2016 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in code comp manner failure to comply w/ law for drainage system per pc 702.1 27-911 observed defective clogged and improper drainage at rear yard exp 3 w/ retained pool of water backin
Jun 20, 2011 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Sep 30, 2026 · Apt BLDG
Open - Water leak
Heavy flow
Aug 23, 2026 · Apt 1R
Close - Water leak
Damp spot
Aug 21, 2026 · Apt 3L
Close - Unsanitary condition
Mold
Aug 21, 2026 · Apt 3L
Close - Unsanitary condition
Sewage
Aug 20, 2026 · Apt 1R
Close - Water leak
Damp spot
Jun 2, 2026 · Apt 3L
Close - Unsanitary condition
Mold
Jun 2, 2026 · Apt 3L
Close - Unsanitary condition
Mold
May 3, 2026 · Apt 3L
Close - Plumbing
Bathtub/shower
May 3, 2026 · Apt 3L
Close - Water leak
Damp spot
May 3, 2026 · Apt 3L
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
May 14, 2024 · Apt 3R
Close - Electric
Outlet/switch
May 14, 2024 · Apt 3R
Close - Unsanitary condition
Sewage
Sep 2, 2021 · Apt 1R
Close - Unsanitary condition
Mold
Aug 27, 2021 · Apt 1R
Close - Water leak
Heavy flow
Aug 27, 2021 · Apt 1R
Close - Water leak
Slow leak
Sep 24, 2019 · Apt 2R
Close - Water leak
Slow leak
Mar 15, 2019 · Apt 3L
Close - Unsanitary condition
Mold
Mar 15, 2019 · Apt 3L
Close - Paint/plaster
Wall
Mar 15, 2019 · Apt 3L
Close - Electric
Outlet/switch
Mar 6, 2019 · Apt 3R
Close - Safety
Window guard broken/missing
Mar 6, 2019 · Apt 3R
Close - Safety
Window guard broken/missing
Mar 6, 2019 · Apt 3R
Close - Flooring/stairs
Floor
Mar 6, 2019 · Apt 3R
Close - Paint/plaster
Ceiling
Mar 6, 2019 · Apt 3R
Close - Appliance
Electric/gas range
Feb 27, 2019 · Apt 3R
Close - Heat/hot water
Apartment only
Feb 27, 2019 · Apt 3R
Close - Water leak
Heavy flow
Feb 16, 2019 · Apt 2R
Close - Paint/plaster
Wall
Feb 15, 2019 · Apt 3R
Close - Water leak
Slow leak
Dec 2, 2018 · Apt 2R
Close - Paint/plaster
Ceiling
Sep 5, 2018 · Apt 3R
Close - Paint/plaster
Wall
Sep 5, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Mar 2, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 9, 2018 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 23, 2017 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 15, 2017 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 4, 2017 · Apt 3R
Close - Heat/hot water
Apartment only
Dec 4, 2017 · Apt 3R
Close - Appliance
Electric/gas range
Dec 4, 2017 · Apt 3R
Close - Heat/hot water
Entire building
Nov 11, 2017 · Apt BLDG
Close - Paint/plaster
Wall
Nov 2, 2017 · Apt 3R
Close - Electric
Lighting
Nov 2, 2017 · Apt 3R
Close - Flooring/stairs
Floor
Nov 2, 2017 · Apt 3R
Close - Flooring/stairs
Floor
Nov 2, 2017 · Apt 3R
Close - General
Bell/buzzer/intercom
Nov 2, 2017 · Apt 3R
Close - Plumbing
Water supply
Nov 2, 2017 · Apt 3R
Close - Plumbing
Water supply
Nov 2, 2017 · Apt 3R
Close - Appliance
Electric/gas range
Nov 2, 2017 · Apt 3R
Close - Plumbing
Radiator
Nov 2, 2017 · Apt 3R
Close - Plumbing
Water supply
Sep 25, 2017 · Apt 3L
Close - General
Cooking gas
Sep 25, 2017 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,875 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3258 / 44
- Assessed value
- $603,450
- Landmark / historic district
- No
HPD registration #324417, last renewed Sep 24, 2025.
Questions about 253 Stanhope Street
Who owns 253 Stanhope Street?
The owner of record in NYC Department of City Planning PLUTO data is 253 Stanhope St. LLC.
Does 253 Stanhope Street have violations?
Yes. NYC HPD has recorded 117 housing violations at this property.
Is 253 Stanhope Street rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 17% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 253 Stanhope Street built?
City records list 1931 as the year it was built.
How many apartments are in 253 Stanhope Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.