248 Stockholm Street
Brooklyn, NY 11237BBL 3-03258-0024Map
Owner of record: Zev Gold INC.
248 Stockholm Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 8 residential units across 4 floors. The owner of record is Zev Gold INC.. HPD has recorded 36 housing violations here, most recently on June 11, 2025. 3 of the 36 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 36
- DOB violations
- 5
- ECB violations
- 0
- HPD complaints
- 58
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 36
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Apr 2, 2025 · Apt 3L
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Apr 2, 2025 · Apt 3L
Open — Not complied with - BHazardous
Repair or replace the smoke detector that is missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Apr 2, 2025 · Apt 3L
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation cornice at building front
May 22, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal cornice at building front
May 22, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
May 8, 2023 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
May 8, 2023 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 1r, 1st story, 1st apartment from south at west
May 8, 2023 · Apt 1R
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles at public hall, 1st story
May 8, 2023
Closed — Violation dismissed
Show 26 more ↓
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 8, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 8, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 8, 2023
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
May 8, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
May 8, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
May 8, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall
May 8, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 8, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective tempered glass pane at lower sash at building front entrance door , 1st story
May 8, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 2, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the kitchen located at apt 1r, 1st story, apartment at east
Nov 5, 2003 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. east wall at center in the kitchen located at apt 1r, 1st story, apartment at east
Nov 5, 2003 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. south wall at center in the kitchen located at apt 1r, 1st story, apartment at east
Nov 5, 2003 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface on wood trim, doors, or windows - using exclusive interim controls, which include a surface dust test in accordance with statute. north window casing at top in the kitchen located at apt 1r, 1st story, apartment at east
Nov 5, 2003 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. west wall at center in the private hallway located at apt 1r, 1st story, apartment at east
Nov 5, 2003 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. west wall at center in the 2nd room from north located at apt 1r, 1st story, apartment at east
Nov 5, 2003 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. west wall at center in the bathroom located at apt 1r, 1st story, apartment at east
Nov 5, 2003 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the bathroom located at apt 1r, 1st story, apartment at east
Nov 5, 2003 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface on wood trim, doors, or windows - using exclusive interim controls, which include a surface dust test in accordance with statute. center door in the bathroom located at apt 1r, 1st story, apartment at east
Nov 5, 2003 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface on wood trim, doors, or windows - using exclusive interim controls, which include a surface dust test in accordance with statute. center door frame in the 3rd room from north located at apt 1r, 1st story, apartment at east
Nov 5, 2003 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling, north wall, west wall in the kitchen located at apt 1r, 1st story, apartment at west
Oct 21, 2003 · Apt 1R
Closed — Violation closed - ANon-hazardous
Discontinue use of interior room for living or provide an alcove opening of at least 32# sq ft to room having a window opening directly to street or yard .. in the 2nd room from north located at apt 1r, 1st story, apartment at west
Oct 21, 2003 · Apt 1R
Open — Not complied with - ANon-hazardous
Discontinue use of interior room for living or provide an alcove opening of at least 32# sq ft to room having a window opening directly to street or yard .. in the 3rd room from north located at apt 1r, 1st story, apartment at west
Oct 21, 2003 · Apt 1R
Open — Not complied with - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint south wall kitchen 3 sty west apt 3r gongalez 443 0141 er1 1231424. , section '' ''
May 3, 1991 · Apt 3R
Closed — Violation closed
DOB building violations · 5
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
Jan 7, 2025 · Apt 3L
Close - Unsanitary condition
Mold
May 2, 2023 · Apt 1R
Close - Paint/plaster
Ceiling
May 2, 2023 · Apt 1R
Close - Paint/plaster
Ceiling
May 2, 2023 · Apt 1R
Close - Electric
Lighting
May 2, 2023 · Apt 1R
Close - Heat/hot water
Entire building
Dec 25, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2018 · Apt BLDG
Close - Water leak
Slow leak
Apr 17, 2017 · Apt 1R
Close - Water leak
Slow leak
Apr 17, 2017 · Apt 1R
Close - General
Locks
Nov 14, 2013 · Apt 1R
Close
Show 40 more ↓
- Nonconst
Smoke detector
Jun 26, 2012 · Apt 4R
Close - Nonconst
Carbon monoxide
Jun 26, 2012 · Apt 4R
Close - Electric
Lighting
Jun 22, 2012 · Apt BLDG
Close - Electric
Lighting
Aug 5, 2010 · Apt BLDG
Close - General
Stairs
Aug 5, 2010 · Apt BLDG
Close - Nonconst
Vermin
Feb 25, 2010 · Apt 3L
Close - Nonconst
Vermin
Feb 25, 2010 · Apt 3L
Close - Plumbing
Water-leaks
Feb 25, 2010 · Apt 3L
Close - Nonconst
Carbon monoxide
May 27, 2009 · Apt 1L
Close - Nonconst
Smoke detector
May 27, 2009 · Apt 1L
Close - Heating
Heat related
Mar 9, 2008 · Apt 4R
Close - Nonconst
Vermin
Jan 10, 2007 · Apt 4R
Close - Paint/plaster
Ceiling
May 30, 2006 · Apt 4R
Close - Paint/plaster
Ceiling
May 30, 2006 · Apt 4R
Close - Paint/plaster
Ceiling
Dec 30, 2005 · Apt 1R
Close - Plumbing
Water-leaks
Dec 30, 2005 · Apt 1R
Close - Plumbing
Water-leaks
Dec 30, 2005 · Apt 1R
Close - General
Doors
Nov 6, 2005 · Apt BLDG
Close - General
Floor
Oct 29, 2003 · Apt 1R
Close - Plumbing
Water-leaks
Oct 29, 2003 · Apt 1R
Close - Paint/plaster
Wall
Oct 29, 2003 · Apt 1R
Close - General
Floor
Oct 29, 2003 · Apt 1R
Close - Plumbing
Water-leaks
Oct 29, 2003 · Apt 1R
Close - Paint/plaster
Wall
Oct 29, 2003 · Apt 1R
Close - Paint/plaster
Wall
Oct 29, 2003 · Apt 1R
Close - General
Mold
Oct 29, 2003 · Apt 1R
Close - Paint/plaster
Wall
Oct 20, 2003 · Apt 1R
Close - Paint/plaster
Wall
Oct 20, 2003 · Apt 1R
Close - Paint/plaster
Ceiling
Oct 20, 2003 · Apt 1R
Close - Paint/plaster
Ceiling
Oct 20, 2003 · Apt 1R
Close - Plumbing
Water-leaks
Oct 20, 2003 · Apt 1R
Close - Plumbing
Water-leaks
Oct 20, 2003 · Apt 1R
Close - Nonconst
Vermin
Oct 9, 2003 · Apt 1R
Close - Nonconst
Vermin
Oct 9, 2003 · Apt 1R
Close - Paint/plaster
Wall
Oct 9, 2003 · Apt 1R
Close - General
Floor
Oct 9, 2003 · Apt 1R
Close - Paint/plaster
Wall
Oct 9, 2003 · Apt 1R
Close - Plumbing
Water-leaks
Oct 9, 2003 · Apt 1R
Close - Paint/plaster
Ceiling
Oct 9, 2003 · Apt 1R
Close - Paint/plaster
Ceiling
Oct 9, 2003 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 8
- Building area
- 7,000 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3258 / 24
- Assessed value
- $630,900
- Landmark / historic district
- No
HPD registration #315494, last renewed Jul 23, 2025.
Questions about 248 Stockholm Street
Who owns 248 Stockholm Street?
The owner of record in NYC Department of City Planning PLUTO data is Zev Gold INC..
Does 248 Stockholm Street have violations?
Yes. NYC HPD has recorded 36 housing violations at this property.
Is 248 Stockholm Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 38% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 248 Stockholm Street built?
City records list 1931 as the year it was built.
How many apartments are in 248 Stockholm Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.