roofy

179 Stanhope Street

Brooklyn, NY 11237BBL 3-03257-0044Map

Owner of record: 179 Stanhope Street LLC

179 Stanhope Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 179 Stanhope Street LLC. HPD has recorded 136 housing violations here, most recently on September 27, 2026. 13 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.

HPD violations
136
DOB violations
22
ECB violations
1
HPD complaints
93

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 27, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
2
About 33% of the building's 6 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 136

  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 1st bathroom from north located at apt apt1r, 1st story, 1st apartment from north at east

    Sep 27, 2026 · Apt APT1R

    Open — Civ14 mailed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and south wall in the 1st bathroom from north located at apt apt1r, 1st story, 1st apartment from north at east

    Sep 27, 2026 · Apt APT1R

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls at closet in the 1st room from north located at apt apt1r, 1st story, 1st apartment from north at east

    Sep 27, 2026 · Apt APT1R

    Open — Civ14 mailed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq feet of mold at ceiling and all walls at closet. in the 1st room from north located at apt apt1r, 1st story, 1st apartment from north at east

    Sep 27, 2026 · Apt APT1R

    Open — Notice of issuance sent to tenant
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Sep 27, 2026

    Open — Nov certified on time
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 6, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 11, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2024

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard yard

    Aug 10, 2022

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of rodents rats at east yard

    Aug 10, 2022

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    Jul 21, 2022 · Apt 1L

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at north wall in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    Jul 21, 2022 · Apt 1L

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Open — Certification postponment denied
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from north at east wall, south wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from west at north wall, 1st door frame from north at east wall, north wall, south wall, east wall, west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from north located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 3rd room from north located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Open — Violation will be reinspected
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the 2nd room from north located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from north at east wall wall, 1st door frame from west at north wall, north wall, east wall, west wall in the 2nd room from north located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Open — Defect letter issued
  • B

    Trace and repair the source and abate the visible mold condition... approximately 10 sq ft at the ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from north at east wall ceiling in the 2nd room from north located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from north located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Open — Violation will be reinspected
  • B

    Properly repair the broken or defective upper and lower sash counterbalance at the north window in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective , second entrance door at east in the 4th room from north located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector , missing located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). , missing located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Closed — Violation dismissed
  • C

    Replace with new the broken or defective air valve at east radiator at public hall, 1st story

    Jan 19, 2022

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall wall, 2nd closet from north at east wall door frame in the 2nd room from north located at apt 1l, 1st story, 1st apartment from south at west

    Jan 19, 2022 · Apt 1L

    Open — Violation will be reinspected
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 13, 2021

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2l, 2nd story

    Feb 13, 2020 · Apt 2L

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west

    Jan 13, 2020 · Apt 2L

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at public hall, 1st story

    Aug 1, 2015

    Closed — Violation closed
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at .. at public hall, 1st story

    Aug 1, 2015

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 3r, 3rd story, apartment at east

    Jul 30, 2013 · Apt 3R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 3r, 3rd story, apartment at east

    Jul 30, 2013 · Apt 3R

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3r, 3rd story, apartment at east

    Jul 30, 2013 · Apt 3R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector that is missing in the entire apartment located at apt 3r, 3rd story, apartment at east

    Jul 30, 2013 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 3rd room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate , located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed
  • C

    Remove the illegal fastening key operated double cylinder lock installed at apt entrance door located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ,, west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ,, 2nd window frame from west at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 25, 2013 · Apt 2R

    Closed — Violation closed

DOB building violations · 22

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
Show 12 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 1

  • Hazardous

    Residence altered for occupancy as a dwelling for more than the legal-ly approved number of families. bldg. dept. records which indicate re-sidence legally approved for six (6) families. residence now altered

    Dec 28, 1999 · Penalty $2,600

    Resolve

Complaints

  • Water leak

    Slow leak

    Sep 21, 2026 · Apt APT1R

    Close
  • Unsanitary condition

    Mold

    Sep 21, 2026 · Apt APT1R

    Close
  • Water leak

    Slow leak

    May 24, 2026 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Apr 19, 2024 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Apr 9, 2024 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Apr 9, 2024 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Apr 9, 2024 · Apt 3L

    Close
  • Safety

    Smoke detector

    Apr 9, 2024 · Apt 3L

    Close
  • Safety

    Carbon monoxide detector

    Apr 9, 2024 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Apr 9, 2024 · Apt 3L

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Mar 19, 2024 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Mar 1, 2023 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2022 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Jul 30, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jul 30, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Mar 26, 2022 · Apt 1L

    Close
  • Paint/plaster

    Wall

    Mar 26, 2022 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Feb 2, 2022 · Apt 3L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 2, 2022 · Apt 3L

    Close
  • Water leak

    Slow leak

    Feb 2, 2022 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2022 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    Jan 4, 2022 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2022 · Apt BLDG

    Close
  • Paint/plaster

    Cabinet

    Jan 4, 2022 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Jan 4, 2022 · Apt 1L

    Close
  • Paint/plaster

    Wall

    Jan 4, 2022 · Apt 1L

    Close
  • Plumbing

    Basin/sink

    Jan 4, 2022 · Apt 1L

    Close
  • General

    Cabinet

    Jan 4, 2022 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Jan 4, 2022 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    Jan 4, 2022 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Apr 16, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Feb 11, 2020 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Jan 9, 2020 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Aug 15, 2016 · Apt 1L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 17, 2015 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 17, 2015 · Apt BLDG

    Close
  • Door/window

    Door

    Jul 17, 2015 · Apt BLDG

    Close
  • Electric

    No lighting

    Aug 28, 2014 · Apt BLDG

    Close
  • Nonconst

    Vermin

    Jul 29, 2013 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Jul 29, 2013 · Apt 3R

    Close
  • Nonconst

    Carbon monoxide

    Jul 29, 2013 · Apt 3R

    Close
  • Nonconst

    Smoke detector

    Jul 29, 2013 · Apt 3R

    Close
  • Electric

    Lighting

    Apr 18, 2013 · Apt 2L

    Close
  • General

    Windows

    Apr 18, 2013 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Apr 18, 2013 · Apt 2R

    Close
  • Nonconst

    Vermin

    Apr 18, 2013 · Apt 2R

    Close
  • Plumbing

    Water-leaks

    Apr 18, 2013 · Apt 2R

    Close
  • Nonconst

    Smoke detector

    Apr 18, 2013 · Apt 2R

    Close
  • Nonconst

    Carbon monoxide

    Apr 18, 2013 · Apt 2R

    Close
  • General

    Mailbox

    Apr 18, 2013 · Apt 2L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
3
Residential units
6
Building area
4,125 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3257 / 44
Assessed value
$510,750
Landmark / historic district
No

HPD registration #364291, last renewed Aug 29, 2025.

Questions about 179 Stanhope Street

Who owns 179 Stanhope Street?

The owner of record in NYC Department of City Planning PLUTO data is 179 Stanhope Street LLC.

Does 179 Stanhope Street have violations?

Yes. NYC HPD has recorded 136 housing violations at this property.

Is 179 Stanhope Street rent stabilized?

NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 33% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 179 Stanhope Street built?

City records list 1931 as the year it was built.

How many apartments are in 179 Stanhope Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.