263 Stockholm Street
Brooklyn, NY 11237BBL 3-03247-0039Map
Owner of record: Zilber Stock LLC
263 Stockholm Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is Zilber Stock LLC. HPD has recorded 149 housing violations here, most recently on June 5, 2026. 2 of the 50 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 149
- DOB violations
- 9
- ECB violations
- 3
- HPD complaints
- 328
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 149
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of table and chairs at balcony at building front at fire escape, 2nd story
Jun 5, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130f in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Jun 5, 2026 · Apt 1L
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the 5th room from east located at apt 1l, 1st story, 1st apartment from east at south
Jun 5, 2026 · Apt 1L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at north wall in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Jun 5, 2026 · Apt 1L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Jun 5, 2026 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Jun 5, 2026 · Apt 1L
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in at wasteline at bathtub in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Jun 5, 2026 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Jun 5, 2026 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Jun 5, 2026 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective air valve at the radiator in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Feb 22, 2019 · Apt 2R
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Feb 19, 2019 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 18, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 18, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 18, 2019
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of house hold items at public hall, 1st story
Jan 18, 2019
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, apartment at north
Jan 10, 2019 · Apt 2R
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 2r, 2nd story, 1st apartment from west at north
Dec 31, 2018 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Dec 28, 2018 · Apt 2R
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors entrance boiler room at cellar
Dec 28, 2018
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors in the entrance located at apt 2r, 2nd story, 1st apartment from north at east
Dec 17, 2018 · Apt 2R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum of 130 degrees at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Dec 17, 2018 · Apt 2R
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 17, 2018
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint rear at fire escape
Jan 26, 2018
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors at entrance located at apt 2r, 2nd story, apartment at north
Jan 26, 2018 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Refit south winow west wall in the kitchen located at apt 2r, 2nd story, apartment at north
Jan 26, 2018 · Apt 2R
Closed — Violation dismissed - BHazardous
Replace with new the missing stopper for wash basin in the bathroom located at apt 2r, 2nd story, apartment at north
Jan 26, 2018 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective reglaze bath tub in the bathroom located at apt 2r, 2nd story, apartment at north
Jan 26, 2018 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective cabinet base in the bathroom located at apt 2r, 2nd story, apartment at north
Jan 26, 2018 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter top in the kitchen located at apt 2r, 2nd story, apartment at north
Jan 26, 2018 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the kitchen located at apt 2r, 2nd story, apartment at north
Jan 26, 2018 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Dec 20, 2017
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective air vent at radiator in the 1st room from north located at apt 2r, 2nd story, 1st apartment from north at east
Mar 2, 2017 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2l, 2nd story, 2nd apartment from south at west
Dec 21, 2016 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall at public hall, 2nd story
Oct 19, 2016
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of refridgerator obstructing egress to fire escape in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Oct 19, 2016 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete intermediate landing stoop
Aug 11, 2016
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective door frame in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Aug 11, 2016 · Apt 1R
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Aug 11, 2016 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Mar 22, 2016 · Apt 2L
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 4th room from north located at apt 2l, 2nd story, 1st apartment from south at west
Mar 22, 2016 · Apt 2L
Open — Defect letter issued - CImmediately hazardous
Remove the illegal fastening slide bolt with eye capable of being padlocked at roof scuttle hatch at public hall, 3rd story
Mar 14, 2016
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling at cellar
Mar 14, 2016
Closed — Violation dismissed - BHazardous
Replace with new the missing light fixture at ceiling at cellar at boiler room
Mar 14, 2016
Closed — Violation dismissed - ANon-hazardous
Provide in accordance with the rules and regulations of this department a waterproof floor and base for the water closet .. in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
Mar 14, 2016 · Apt 1L
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling (acoustic tiles) in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
Mar 14, 2016 · Apt 1L
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
Mar 14, 2016 · Apt 1L
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 1l, 1st story, 1st apartment from south at west
Mar 14, 2016 · Apt 1L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color in the kitchen located at apt 2r, 2nd story
Feb 25, 2016 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color in the bathroom located at apt 2r, 2nd story
Feb 25, 2016 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st bathroom from north at west located at apt 2r, 2nd story
Feb 25, 2016 · Apt 2R
Closed — Violation closed
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 3
- Class - 2
Failure to comply w/the comm's order contained in nov #35035335j issued on 3/14/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Apr 20, 2016 · Penalty $2,000
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner. noted: at time ofinspection observed at basement level that the 1st fl,floor joist under bathroom is rotted & deterited,plywood sub floor is also rotted out.
Mar 14, 2016 · Penalty $2,500
Resolve - Class - 3
Failure to maintain bldg in code complaint manner. note : in 2nd fl left side apt. the floors are sloping throughout & a hair line crack exists in bedroom wall. remedy: repair & / or replace defects
Dec 3, 2009 · Penalty $100
Resolve
Complaints
- Water leak
Heavy flow
Jun 4, 2026 · Apt 1L
Close - Paint/plaster
Ceiling
Jun 4, 2026 · Apt 1L
Close - Unsanitary condition
Mold
Jun 4, 2026 · Apt 1L
Close - Unsanitary condition
Sewage
Jun 4, 2026 · Apt 1L
Close - Unsanitary condition
Pests
Jun 4, 2026 · Apt 1L
Close - Plumbing
Radiator
Dec 31, 2019 · Apt 2R
Close - Plumbing
Radiator
Dec 31, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Dec 31, 2019 · Apt 2R
Close - Plumbing
Radiator
Dec 31, 2019 · Apt 2R
Close - Plumbing
Radiator
Dec 31, 2019 · Apt 2R
Close
Show 40 more ↓
- Plumbing
Radiator
Dec 31, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Dec 31, 2019 · Apt 2R
Close - Unsanitary condition
Pests
Jun 25, 2019 · Apt 3R
Close - Water leak
Slow leak
Jun 25, 2019 · Apt 3R
Close - Flooring/stairs
Floor
Jun 25, 2019 · Apt 3R
Close - Unsanitary condition
Pests
Jun 2, 2019 · Apt 3R
Close - Flooring/stairs
Floor
Jun 2, 2019 · Apt 3R
Close - Electric
Lighting
Jun 2, 2019 · Apt 3R
Close - Heat/hot water
Apartment only
Feb 23, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Feb 20, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Feb 20, 2019 · Apt 2R
Close - Plumbing
Radiator
Feb 20, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Feb 16, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Jan 9, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Dec 29, 2018 · Apt 2R
Close - Heat/hot water
Apartment only
Dec 29, 2018 · Apt 2R
Close - Heat/hot water
Apartment only
Dec 28, 2018 · Apt 2R
Close - Heat/hot water
Apartment only
Dec 16, 2018 · Apt 2R
Close - Plumbing
Bathtub/shower
Jan 16, 2018 · Apt 2R
Close - General
Cabinet
Jan 16, 2018 · Apt 2R
Close - Paint/plaster
Wall
Jan 16, 2018 · Apt 2R
Close - Door/window
Window frame
Jan 16, 2018 · Apt 2R
Close - Plumbing
Bathtub/shower
Jan 11, 2018 · Apt 2R
Close - Plumbing
Radiator
Jan 11, 2018 · Apt 2R
Close - Plumbing
Radiator
Jan 11, 2018 · Apt 2R
Close - General
Signage missing
Dec 20, 2017 · Apt 1R
Close - Safety
Smoke detector
Dec 20, 2017 · Apt 1R
Close - Safety
Carbon monoxide detector
Dec 20, 2017 · Apt 1R
Close - Heat/hot water
Entire building
Nov 9, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2017 · Apt 2R
Close - Heat/hot water
Entire building
Feb 28, 2017 · Apt 1R
Close - Heat/hot water
Entire building
Feb 28, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2017 · Apt BLDG
Close - Flooring/stairs
Stairs
Aug 9, 2016 · Apt 1R
Close - Door/window
Door frame
Aug 9, 2016 · Apt 1R
Close - Outside building
Roof door/hatch
Mar 11, 2016 · Apt 1R
Close - Electric
No lighting
Mar 11, 2016 · Apt 1R
Close - Plumbing
Radiator
Mar 11, 2016 · Apt 1R
Close - Door/window
Door frame
Mar 11, 2016 · Apt 1R
Close - Flooring/stairs
Floor
Mar 11, 2016 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,500 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3247 / 39
- Assessed value
- $557,100
- Landmark / historic district
- No
HPD registration #352952, last renewed Jul 30, 2025.
Questions about 263 Stockholm Street
Who owns 263 Stockholm Street?
The owner of record in NYC Department of City Planning PLUTO data is Zilber Stock LLC.
Does 263 Stockholm Street have violations?
Yes. NYC HPD has recorded 149 housing violations at this property.
Is 263 Stockholm Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 50% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 263 Stockholm Street built?
City records list 1931 as the year it was built.
How many apartments are in 263 Stockholm Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.