854 Hart Street
Brooklyn, NY 11237BBL 3-03236-0020Map
Owner of record: West Bushwick 203k Housing Development F Und Compan
854 Hart Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is West Bushwick 203k Housing Development F Und Compan. HPD has recorded 75 housing violations here, most recently on May 4, 2026. 4 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 75
- DOB violations
- 17
- ECB violations
- 2
- HPD complaints
- 20
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 75
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective air exhaust mechanical vent at ceiling in the 1st bathroom from north at west located at apt 1a, 1st story, 1st apartment from north at east
Mar 5, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Mar 5, 2024 · Apt 1A
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the caulking around ceramic tiles at bathtub in the 1st bathroom from north at west located at apt 1a, 1st story, 1st apartment from north at east
Mar 5, 2024 · Apt 1A
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Mar 5, 2024 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door bell buzzer intercom system from building entrance to box at north wall in the private hallway located at apt 1a, 1st story, 1st apartment from north at east
Mar 5, 2024 · Apt 1A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening a hasp and eye capable of being locked at the gate at the building front yard
Feb 10, 2020
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... the mold at ceiling approx 8 sq ft ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Jun 11, 2019 · Apt 1A
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling by the 2nd window from west at north in the 1st room from north at west located at apt 1a, 1st story, 1st apartment from south at west
Jun 11, 2019 · Apt 1A
Open — Not complied with
Show 40 more ↓
- BHazardous
Trace and repair the source and abate the visible mold condition... the mold at ceiling approx 8 sq ft ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west original violation 13117447 issued 11-jun-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 11, 2019 · Apt 1A
Open — Not complied with - BHazardous
Replace with new the missing mixture handle at bathtub in the 1st bathroom from north located at apt 1a, 1st story, 1st apartment from north at east
Jun 7, 2018 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 2nd room from north at east located at apt 1a, 1st story, 1st apartment from south at west
Feb 16, 2018 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall near window in the 1st room from north at east located at apt 1a, 1st story, 1st apartment from north at east
Jun 6, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall near window in the 1st room from north at east located at apt 1a, 1st story, 1st apartment from north at east
Jun 6, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall near window in the 1st room from north at west located at apt 1a, 1st story, 1st apartment from north at east
Jun 6, 2017 · Apt 1A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at west located at apt 1a, 1st story, 1st apartment from north at east
Jun 6, 2017 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective lock at entrance door to building
Jun 17, 2016
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective door lock assembly on building entrance door, at public hall, 1st story
May 14, 2016
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective locking and asssembly at entrance door to building , 1st story
Feb 18, 2016
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Feb 18, 2016
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 3rd story
Feb 18, 2016
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and east wall at public hall, 3rd story
Feb 18, 2016
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 9, 2015
Closed — Violation dismissed - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Apr 27, 2015
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening eye and hook capable of being padlocked at scuttle cover at public hall, 3rd story
Jul 2, 2014
Closed — Violation closed - BHazardous
Replace with new the missing ceramic tiles on floor at entrance to building front
Apr 28, 2014
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. west wall in the kitchen located at apt 1l, 1st story, apartment at east
Jun 29, 2000 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the kitchen located at apt 1l, 1st story, apartment at east
Jun 29, 2000 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. east wall at east in the kitchen located at apt 3l, 3rd story, apartment at west
Feb 20, 2000 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface on wood trim, doors, or windows - using exclusive interim controls, which include a surface dust test in accordance with statute. east door molding at east in the bathroom from east located at apt 3l, 3rd story, apartment at west
Feb 20, 2000 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. west wall at center in the 2nd bedroom 2 from north located at apt 1l, 1st story, apartment at east
Dec 30, 1999 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface on wood trim, doors, or windows - using exclusive interim controls, which include a surface dust test in accordance with statute. west closet door casing at top in the 3rd bedroom 3 from north located at apt 1l, 1st story, apartment at east
Dec 30, 1999 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint at door frame on north wall kitchen 3 sty apt 3l er1 47954 located at apt 3l, 3rd story, section '' ''
Oct 13, 1999 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint west wall kitchen 3 sty apt 3l quionnes 381 7591 er1 47954 located at apt 3l, 3rd story, section '' ''
Oct 13, 1999 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling 2nd room from north room 3 sty apt 3l located at apt 3l, 3rd story, section '' ''
Oct 13, 1999 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling front rooms 3rd sty east apt 3l er1 31206 located at apt 3l
Apr 3, 1999 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint at ceiling 2nd room from front 3rd sty east apt 3l er1 31206 located at apt 3l
Apr 3, 1999 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling east and west wall kitchen 3rd sty east apt 3l er131206 located at apt 3l
Apr 3, 1999 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling east room 3 sty north apt 3l er1 29526 , section '' ''
Mar 14, 1999 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling center room 3 sty north apt 3l er1 29526 , section '' ''
Mar 14, 1999 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint north wall and ceiling kitchen 3 sty north apt 3l quinones 381 3168 er1 29526 , section '' ''
Mar 14, 1999 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint and or plaster east and west wall front room 2nd sty west apt 2r er1 29211 , section '' ''
Mar 4, 1999 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint and or plaster west wall 2nd room from front 2nd sty west apt 2r er1 29211 , section '' ''
Mar 4, 1999 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint and or plaster ceiling 2nd room from kitchen 2nd sty west apt 2r er1 29211 , section '' ''
Mar 4, 1999 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint and or plaster walls bathroom 2nd sty west apt 2r ms betan court 366 0143 er1 292113 , section '' ''
Mar 4, 1999 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint walls bathroom 2nd sty west apt 3r er1 28418g , section '' ''
Feb 25, 1999 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint walls kitchen 2nd sty west apt 2r er1 28418 located at apt 2r
Feb 25, 1999 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint walls and ceiling 2nd room from rear 2nd sty west apt 2r er1 28418 located at apt 2r
Feb 25, 1999 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint walls front room 2nd sty west apt 2r ms betancourt 366 0143 er1 28418 located at apt 2r
Feb 25, 1999 · Apt 2R
Closed — Violation closed
DOB building violations · 17
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
Show 7 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Dec 26, 1991
Vp*-violation unserved ecb- dismissed
ECB violations · 2
- Non-hazardous
Sec 27-194. failure to post work permit. noted: on going construction work in progress w/ jobsite fence erected under appl# 301906695 exp 03/16/07 w/ no valid, current permit posted for work or fence any where
Apr 17, 2007
Resolve - Non-hazardous
Coil box correded and leaking.
Dec 26, 1991 · Penalty $250
Resolve
Complaints
- Heat/hot water
Entire building
Sep 11, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 2, 2024 · Apt 1A
Close - Door/window
Door frame
Dec 26, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Dec 26, 2023 · Apt 1A
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2021 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 1, 2021 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 8, 2017 · Apt 1R
Close
Show 10 more ↓
- Unsanitary condition
Mold
Nov 29, 2016 · Apt 1A
Close - Door/window
Window frame
Nov 29, 2016 · Apt 1A
Close - Appliance
Electric/gas range
Nov 29, 2016 · Apt 1A
Close - Water leak
Slow leak
Nov 29, 2016 · Apt 1A
Close - Unsanitary condition
Pests
Nov 29, 2016 · Apt 1A
Close - Electric
Lighting
Nov 29, 2016 · Apt 1A
Close - Paint/plaster
Window/frame
Nov 29, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Feb 14, 2016 · Apt APT2B
Close - Heat/hot water
Entire building
Feb 14, 2016 · Apt BLDG
Close - Nonconst
Rubbish
Aug 18, 2005 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,500 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3236 / 20
- Assessed value
- $557,100
- Landmark / historic district
- No
HPD registration #313626, last renewed Sep 22, 2025.
Questions about 854 Hart Street
Who owns 854 Hart Street?
The owner of record in NYC Department of City Planning PLUTO data is West Bushwick 203k Housing Development F Und Compan.
Does 854 Hart Street have violations?
Yes. NYC HPD has recorded 75 housing violations at this property.
Is 854 Hart Street rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 67% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 854 Hart Street built?
City records list 1931 as the year it was built.
How many apartments are in 854 Hart Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.