312 Knickerbocker Avenue
Brooklyn, NY 11237BBL 3-03219-0034Map
Owner of record: Pierdipino, Antonino
312 Knickerbocker Avenue is a walk-up apartment building built in 1932 in Brooklyn, 11237. It has 9 residential units across 4 floors. The owner of record is Pierdipino, Antonino. HPD has recorded 19 housing violations here, most recently on May 5, 2026. 4 of the 19 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 19
- DOB violations
- 13
- ECB violations
- 1
- HPD complaints
- 32
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 19
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 4th story
Feb 25, 2019
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department west wall at public hall, 4th story
Feb 25, 2019
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 2nd story balcony at 2nd fire escape from left at south exterior wall
Sep 11, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 11, 2018
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 11, 2018
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 11, 2018
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees, found hot water to be 160 degrees at fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Feb 2, 2018 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood flooring in the 1st room from east at north located at apt 1, 2nd story, apartment at east
Nov 5, 2017 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 5, 2017
Closed — Violation dismissed
Show 9 more ↓
- BHazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1, 2nd story, 1st apartment from north at east
Nov 5, 2017 · Apt 1
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 1, 2nd story, 1st apartment from north at east
Nov 5, 2017 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance of lower sash at south wall window in the 1st room from east at south located at apt 1, 2nd story, 1st apartment from north at east
Nov 5, 2017 · Apt 1
Closed — Violation dismissed - BHazardous
Replace the broken or defective pop-up assembly at bath tub waste pipe in the bathroom located at apt 1, 2nd story, 1st apartment from north at east
Nov 5, 2017 · Apt 1
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 9, 2015
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
Jul 30, 2011
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jul 30, 2011
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 30, 2011
Open — Not complied with - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint north wall 3 sty west apt 6 southwest room pierdilino 318 7199 er1. , section '' ''
Feb 23, 1990 · Apt 6
Open — Nov certified late
DOB building violations · 13
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Construction other optional
Structure rendered non-compliant. at time of inspection damage observed to have been sustained to masonry wall at cellar level exposure 2 where worker jack hammering penetrated through to building wall due to on going sidewalk repair work at 312 knickerbocker avenue.
Jul 16, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Oct 1, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
Show 3 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 1
- Hazardous
3b
Aug 3, 1990
Resolve
Complaints
- Heat/hot water
Entire building
Mar 21, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2019 · Apt 9
Close - Heat/hot water
Entire building
Feb 23, 2019 · Apt 9
Close - Heat/hot water
Entire building
Feb 17, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2019 · Apt 1
Close - Heat/hot water
Entire building
Sep 15, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 11, 2018 · Apt BLDG
Close
Show 22 more ↓
- Heat/hot water
Entire building
Sep 10, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 29, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 22, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 21, 2018 · Apt 3
Close - Heat/hot water
Entire building
Apr 20, 2018 · Apt 1
Close - Heat/hot water
Entire building
Mar 18, 2018 · Apt 6
Close - Heat/hot water
Entire building
Feb 24, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2018 · Apt 1
Close - Heat/hot water
Entire building
Jan 7, 2018 · Apt 9
Close - General
Cabinet
Oct 25, 2017 · Apt 1FLR
Close - General
Cabinet
Oct 25, 2017 · Apt 1FLR
Close - Door/window
Window pane
Oct 25, 2017 · Apt 1FLR
Close - Flooring/stairs
Floor
Oct 25, 2017 · Apt 1FLR
Close - Heating
Heat related
Jan 8, 2014 · Apt 1
Close - Heating
Heat related
Dec 27, 2013 · Apt 3
Close - General
Doors
May 22, 2012 · Apt 4
Close - Nonconst
Vermin
Dec 17, 2011 · Apt 2
Close - General
Window guards
Jul 22, 2011 · Apt 2
Close - Heating
Heat related
Mar 2, 2009 · Apt BLDG
Close - Nonconst
Vermin
Jan 4, 2006 · Apt 2
Close - Heating
Heat related
Mar 19, 2005 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1932
- Floors
- 4
- Residential units
- 9
- Building area
- 9,250 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 34
- Block / lot
- 3219 / 34
- Assessed value
- $621,900
- Landmark / historic district
- No
HPD registration #358595, last renewed Jul 20, 2026.
Questions about 312 Knickerbocker Avenue
Who owns 312 Knickerbocker Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Pierdipino, Antonino.
Does 312 Knickerbocker Avenue have violations?
Yes. NYC HPD has recorded 19 housing violations at this property.
Is 312 Knickerbocker Avenue rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 78% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 312 Knickerbocker Avenue built?
City records list 1932 as the year it was built.
How many apartments are in 312 Knickerbocker Avenue?
It has 9 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.