38 Starr Street
Brooklyn, NY 11221BBL 3-03196-0025Map
Owner of record: Seneca Starr LLC
38 Starr Street is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 6 residential units across 3 floors. The owner of record is Seneca Starr LLC. HPD has recorded 65 housing violations here, most recently on August 8, 2026. 36 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 65
- DOB violations
- 3
- ECB violations
- 0
- HPD complaints
- 91
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 8, 2026 · Apt 2NDFLO
Open — Certification postponment denied - BHazardous
Remove all obstructions and repair all defects in wasteline at washbasin in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 8, 2026 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 8, 2026 · Apt 2NDFLO
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 8, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 8, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Jul 29, 2026 · Apt 1L
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east, south, west, and north walls in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east, north, and west walls in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from east located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective br0ken upper sash glass pane at first window from south at west in the 5th room from east located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jun 18, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of stove, bike, walker, fish tank & household items at public hall, 2nd story
Apr 24, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 6, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 27, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 2, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 23, 2021
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 23, 2021
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches at cellar
Aug 23, 2021
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice at cellar
Aug 23, 2021
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective base cabinet at sink in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Aug 13, 2021 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors at front entrance located at apt 1l, 1st story, 1st apartment from west at north
Aug 13, 2021 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood cabinet south wall in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Aug 13, 2021 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at wash basin in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Aug 13, 2021 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors at rear entrance located at apt 1l, 1st story, 1st apartment from west at north
Aug 13, 2021 · Apt 1L
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 13, 2021
Open — Nov sent out - BHazardous
Replace with new the missing baluster at balustrade at public hall, 3rd story
Aug 11, 2021
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
Aug 11, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 11, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 13, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.
May 20, 2019
Open — Nov sent out - ANon-hazardous
Refit all window sashes upper and lower in the entire apartment located at apt 1l, 1st story, apartment at east
Apr 5, 2018 · Apt 1L
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors to secondary exit in the 1st room from north located at apt 1l, 1st story, apartment at east
Apr 5, 2018 · Apt 1L
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 1l, 1st story, apartment at east
Apr 5, 2018 · Apt 1L
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 14, 2015
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1l, 1st story, apartment at north
Jan 20, 2015 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at public hall, 1st story
Jan 20, 2015
Closed — Violation closed
DOB building violations · 3
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Jan 24, 1989
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Slow leak
Oct 6, 2026 · Apt 2NDFLT
Open - Paint/plaster
Wall
Oct 6, 2026 · Apt 2NDFLT
Open - Flooring/stairs
Floor
Oct 6, 2026 · Apt 2NDFLT
Open - Door/window
Door frame
Oct 6, 2026 · Apt 2NDFLT
Open - Water leak
Heavy flow
Aug 5, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Aug 5, 2026 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Aug 5, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Aug 5, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Aug 5, 2026 · Apt 2NDFLO
Close - Plumbing
Bathtub/shower
Jul 25, 2026 · Apt 1L
Close
Show 40 more ↓
- Paint/plaster
Wall
Jul 16, 2026 · Apt 2R
Close - Flooring/stairs
Floor
Jul 16, 2026 · Apt 2R
Close - Paint/plaster
Ceiling
Jun 9, 2026 · Apt 2R
Close - Paint/plaster
Wall
Jun 9, 2026 · Apt 2R
Close - Flooring/stairs
Floor
Feb 1, 2026 · Apt 2L
Close - Paint/plaster
Wall
Feb 1, 2026 · Apt 2L
Close - Paint/plaster
Wall
Dec 21, 2025 · Apt 2L
Close - Door/window
Window frame
Dec 21, 2025 · Apt 2L
Close - Plumbing
Toilet
Dec 21, 2025 · Apt 2L
Close - Water leak
Slow leak
Feb 12, 2025 · Apt 1R
Close - Unsanitary condition
Mold
Jun 25, 2024 · Apt APT2L
Close - Heat/hot water
Apartment only
Apr 22, 2024 · Apt 3R
Close - Heat/hot water
Apartment only
Apr 22, 2024 · Apt 3R
Close - Paint/plaster
Wall
Feb 22, 2024 · Apt APT2L
Close - Heat/hot water
Apartment only
Dec 14, 2023 · Apt 1L
Close - Unsanitary condition
Garbage/recycling storage
Aug 2, 2023 · Apt 1L
Close - Plumbing
Radiator
Dec 12, 2022 · Apt 1L
Close - Door/window
Door
Oct 21, 2022 · Apt 1L
Close - Safety
Smoke detector
Oct 21, 2022 · Apt 1L
Close - Safety
Carbon monoxide detector
Oct 21, 2022 · Apt 1L
Close - Heat/hot water
Apartment only
Oct 21, 2022 · Apt 1L
Close - Safety
Smoke detector
Sep 23, 2022 · Apt 1L
Close - Safety
Carbon monoxide detector
Sep 23, 2022 · Apt 1L
Close - Door/window
Window frame
Sep 23, 2022 · Apt 1L
Close - Door/window
Door frame
Sep 23, 2022 · Apt 1L
Close - Safety
Smoke detector
Sep 15, 2022 · Apt 1L
Close - Plumbing
Bathtub/shower
Sep 15, 2022 · Apt 1L
Close - Safety
Carbon monoxide detector
Sep 15, 2022 · Apt 1L
Close - General
Cabinet
Aug 11, 2021 · Apt 1L
Close - Unsanitary condition
Pests
Aug 7, 2021 · Apt BLDG
Close - Door/window
Door
Jun 21, 2018 · Apt 2R
Close - Door/window
Door
May 22, 2018 · Apt 2R
Close - Door/window
Window frame
Apr 4, 2018 · Apt 1L
Close - Door/window
Window frame
Apr 4, 2018 · Apt 2L
Close - Heat/hot water
Apartment only
Jan 17, 2015 · Apt 1L
Close - Electric
Outlet/switch
Jan 17, 2015 · Apt 1L
Close - Paint/plaster
Wall
Jan 17, 2015 · Apt 1L
Close - Door/window
Window frame
Jan 17, 2015 · Apt 1L
Close - Door/window
Window frame
Jan 17, 2015 · Apt 1L
Close - Safety
Smoke detector
Jan 17, 2015 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,464 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 34
- Block / lot
- 3196 / 25
- Assessed value
- $491,850
- Landmark / historic district
- No
HPD registration #313624, last renewed Sep 8, 2025.
Questions about 38 Starr Street
Who owns 38 Starr Street?
The owner of record in NYC Department of City Planning PLUTO data is Seneca Starr LLC.
Does 38 Starr Street have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 38 Starr Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 38 Starr Street built?
City records list 1931 as the year it was built.
How many apartments are in 38 Starr Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.