roofy

84 George Street

Brooklyn, NY 11206BBL 3-03157-0019Map

Owner of record: 84 Residence LLC

84 George Street is a walk-up apartment building built in 1931 in Brooklyn, 11206. It has 6 residential units across 3 floors. The owner of record is 84 Residence LLC. HPD has recorded 46 housing violations here, most recently on January 31, 2024. 3 of the 46 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2018.

HPD violations
46
DOB violations
34
ECB violations
11
HPD complaints
229

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jan 31, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2018
1
About 17% of the building's 6 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 46

  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 31, 2024 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 31, 2024 · Apt 3L

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 31, 2024

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 31, 2024 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Jan 19, 2024 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Jan 19, 2024 · Apt 2L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of 175 degrees hot water exceeding maximum allowable 130 degrees at all fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Jan 19, 2024 · Apt 2L

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Jan 19, 2024 · Apt 2L

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 3, 2021

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall at public hall, 1st story

    Dec 3, 2021

    Closed — Violation dismissed
Show 36 more ↓
  • B

    Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 1st story

    Dec 3, 2021

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at east wall at public hall, 3rd story

    Dec 3, 2021

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 3rd story

    Dec 3, 2021

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 17, 2018

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Oct 12, 2017

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Oct 12, 2017

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 12, 2017

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Oct 12, 2017

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 12, 2017

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 12, 2017

    Closed — Violation dismissed
  • C

    Repair the roof so that it will not leak ceiling at public hall, 3rd story

    Aug 10, 2013

    Closed — Violation closed
  • C

    Repair the roof so that it will not leak at the scuttle hatch at public hall, 3rd story

    Jul 1, 2013

    Open — Not complied with
  • B

    Remove all encumbrances consisting of furniture, a.c. unit, and other household articles at public hall, 3rd story

    Jul 1, 2013

    Closed — Violation closed
  • C

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the , at basement

    Aug 29, 2012

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked at boiler room

    Dec 25, 2009

    Closed — Violation closed
  • B

    Replace with new the missing bell buzzer at entrance door located at apt 3r, 3rd story

    Sep 22, 2009 · Apt 3R

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3r, 3rd story

    Feb 14, 2009 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor throughout in the entire apartment located at apt 3r, 3rd story

    Feb 14, 2009 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceiling with fire retarted sheetrock at public hall, 3rd story

    Jan 14, 2009

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ... in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east

    Jan 14, 2009 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 3r, 3rd story, 2nd apartment from north at east

    Jan 14, 2009 · Apt 3R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east

    Jan 14, 2009 · Apt 3R

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story

    Oct 29, 2008

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system .. at public hall, 1st story

    Oct 29, 2008

    Closed — Violation closed
  • B

    Replace or repair the self-closing the doors that is missing or defective .. in the entrance located at apt 3r, 3rd story, 2nd apartment from north at east

    Oct 29, 2008 · Apt 3R

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east

    Oct 29, 2008 · Apt 3R

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east

    Oct 29, 2008 · Apt 3R

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3r, 3rd story, 2nd apartment from north at east

    Oct 29, 2008 · Apt 3R

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of evidence of leak ceiling and walls in the entire apartment located at apt 3r, 3rd story

    Aug 6, 2007 · Apt 3R

    Closed — Violation closed
  • B

    Replace with new the broken or defective gasket sealed refrigerator in the kitchen located at apt 3r, 3rd story

    Aug 6, 2007 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair the broken or defective cooking gas range pilot in the kitchen located at apt 3r, 3rd story

    Aug 6, 2007 · Apt 3R

    Closed — Violation closed
  • A

    Replace with new the broken or defective closet door lock in the entire apartment located at apt 3r, 3rd story

    Aug 6, 2007 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floors in the entire apartment located at apt 3r, 3rd story

    Aug 6, 2007 · Apt 3R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the entire apartment located at apt 3r, 3rd story

    Aug 6, 2007 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Aug 31, 2005 · Apt 1R

    Closed — Violation closed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint ceiling east and west walls north room 1 sty east apt 1l santiago 628 1642 er1 3311548 located at apt 1l

    Nov 27, 1991 · Apt 1L

    Closed — Violation closed

DOB building violations · 34

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
Show 24 more ↓
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 11

  • Non-hazardous

    (50a)holes in boiler room wall and ceiling. (50b)exposed wood beams in boiler room. (50c)pipe safety or relief valve discharge down no threaded end. (50d)boiler room fire door defective. (50e) valve on expansio

    May 13, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    B4b, 4a, 19b, 36, 32a, 50a - 50e. (50a) holes in boiler room ceiling(50b) exposed wood beams in boiler room. (50c) pipe safety or relief valve discharge down no threaded end. (50d) boiler room fire door defe

    May 10, 2008 · Penalty $500

    Resolve
  • Non-hazardous

    B4b, 36, 4a, 19b, 32a, 50a - 50e. (50a) holes in boiler room ceiling(50b) exposed wood beams in boiler room. (50c) pipe safety or relief valve discharge down no threaded end. (50d) boiler room fire door defe

    May 10, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    B4b, 36, 19b, 4a, 32a, 50a - 50e. (50a) holes in boiler room ceiling(50b) exposed wood beams in boiler room. (50c) pipe safety or relief valve discharge down no threaded end. (50d) boiler room fire door defe

    May 10, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    B4b, 36, 19b, 4a, 32a, 50a - 50e. (50a) holes in boiler room ceiling(50b) exposed wood beams in boiler room. (50c) pipe safety or relief valve discharge down no threaded end. (50d) boiler room fire door defe

    May 10, 2008

    Resolve
  • Non-hazardous

    B4b, 4a, 19b, 36, 32a, 50a - 50b. (50a) holes in boiler room ceiling(50b) exposed wood beams in boiler room. (50c) pipe safety or relief valve discharge down no threaded end. (50d) boiler room fire door defe

    May 10, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    Work w/o a permit - hazardous work noted : interior demo. of partitions at 3, 2, 1, fls of bldg with removed plaster wood lathe from walls/ ceilings, exposing wood joists beams observed conditions from st. leve

    Sep 9, 2006

    Resolve
  • Hazardous

    Failure to maintain bldg defect is steel hatch aprox 2' x 5' @ front of bldg fell down the cellar creating hole danger to the people.remedy:make safe immediately maintain bldg

    Jul 5, 2006 · Penalty $2,500

    Resolve
  • Non-hazardous

    16/50c 24b/50d 32a 50 50a 50b 50) opening in boiler room wall without fuseable link. 50a) boiler flue pipe not supported. 50b) harford loop missing from steam boiler. 50c) dabris in boiler room. 50d) boiler

    Aug 24, 2004 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain bldg.hazardous defects noted:at cellar level rotted floor joists in danger of collapse at various locations.remedy:make safe obtain approval and permit if necessary to do repairs.submit eng

    Mar 30, 2004 · Penalty $2,500

    Active
Show 1 more ↓
  • Non-hazardous

    Failure to provide maintain fire stopping where required:note at cellar level fire stopping inadeqaute or missing from ceiling exposing floor wood joists at various locations.remedy:provide/maintain fire stopp

    Mar 30, 2004 · Penalty $2,500

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Sep 13, 2026 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Jun 23, 2025 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2024 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2024 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2024 · Apt 2L

    Close
  • Unsanitary condition

    Mold

    Oct 18, 2023 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Oct 18, 2023 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Dec 1, 2022 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Nov 27, 2022 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Nov 25, 2022 · Apt 3R

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Nov 20, 2022 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 13, 2021 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2019 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2018 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Feb 8, 2018 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Nov 4, 2017 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Oct 23, 2017 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Oct 23, 2017 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Oct 20, 2017 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Oct 10, 2017 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Nov 21, 2016 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 21, 2016 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Oct 29, 2016 · Apt 1R

    Close
  • Heating

    Heat related

    Aug 24, 2012 · Apt 2R

    Close
  • Heating

    Heat related

    Nov 21, 2010 · Apt 1L

    Close
  • Electric

    Wiring

    Dec 31, 2009 · Apt 3R

    Close
  • Nonconst

    Rubbish

    Dec 31, 2009 · Apt 3R

    Close
  • General

    Doors

    Dec 31, 2009 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Dec 31, 2009 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 17, 2009 · Apt 3R

    Close
  • Plumbing

    Water-leaks

    Dec 13, 2009 · Apt 2L

    Close
  • Plumbing

    Basin/sink

    Dec 13, 2009 · Apt 2L

    Close
  • Heating

    Heat related

    Dec 6, 2009 · Apt 1R

    Close
  • Heating

    Heat related

    Oct 19, 2009 · Apt 1R

    Close
  • Electric

    Bell-buzzer/intercom

    Sep 18, 2009 · Apt 3R

    Close
  • General

    Floor

    Sep 18, 2009 · Apt 3R

    Close
  • General

    Floor

    Sep 18, 2009 · Apt 3R

    Close
  • General

    Floor

    Sep 18, 2009 · Apt 3R

    Close
  • General

    Floor

    Aug 18, 2009 · Apt 3R

    Close
  • General

    Floor

    Aug 18, 2009 · Apt 3R

    Close
  • Electric

    Bell-buzzer/intercom

    Aug 18, 2009 · Apt 3R

    Close
  • Plumbing

    Shower-stall

    Jun 9, 2009 · Apt 3R

    Close
  • Plumbing

    Shower-stall

    Jun 9, 2009 · Apt 3R

    Close
  • Plumbing

    Sewer

    Jun 9, 2009 · Apt 3R

    Close
  • General

    Floor

    Jun 9, 2009 · Apt 3R

    Close
  • General

    Floor

    Jun 9, 2009 · Apt 3R

    Close
  • General

    Floor

    Jun 9, 2009 · Apt 3R

    Close
  • General

    Ventilation system

    Jun 9, 2009 · Apt 3R

    Close
  • Electric

    Bell-buzzer/intercom

    Jun 9, 2009 · Apt 3R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
3
Residential units
6
Building area
4,800 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
34
Block / lot
3157 / 19
Assessed value
$594,450
Landmark / historic district
No

HPD registration #364669, last renewed Aug 23, 2025.

Questions about 84 George Street

Who owns 84 George Street?

The owner of record in NYC Department of City Planning PLUTO data is 84 Residence LLC.

Does 84 George Street have violations?

Yes. NYC HPD has recorded 46 housing violations at this property.

Is 84 George Street rent stabilized?

NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2018 (about 17% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 84 George Street built?

City records list 1931 as the year it was built.

How many apartments are in 84 George Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.