917 Broadway
Brooklyn, NY 11206BBL 3-03150-0003Map
Owner of record: B 917 Broadway Realty LLC
917 Broadway is an elevator apartment building built in 1931 in Brooklyn, 11206. It has 8 residential units across 6 floors. The owner of record is B 917 Broadway Realty LLC. HPD has recorded 58 housing violations here, most recently on April 9, 2024.
- HPD violations
- 58
- DOB violations
- 23
- ECB violations
- 31
- HPD complaints
- 151
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 58
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Closed — Violation dismissed - BHazardous
Replace or repair the self-closing doors that is missing or defective rear entrance to building
Feb 11, 2019
Closed — Violation closed - BHazardous
Properly secure the loose bell system at entrance to building
Feb 11, 2019
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Feb 11, 2019
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Feb 11, 2019
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 11, 2019
Closed — Violation closed - BHazardous
Properly repair the broken or defective mail box receptacle at public hall, 1st story
Feb 11, 2019
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors front entrance to building
Feb 11, 2019
Closed — Violation closed
Show 40 more ↓
- BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the kitchen located at apt 3r, 3rd story, 2nd apartment from west at north
Jul 27, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Replace or repair the self-closing the doors that is missing or defective at north entrance located at apt 3r, 3rd story, 2nd apartment from east at south
Jul 27, 2018 · Apt 3R
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 27, 2018
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north, east, and west walls in the kitchen located at apt 3r, 3rd story, 2nd apartment from east at south
Jul 27, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..all walls in the 3rd room from north located at apt 3r, 3rd story, 2nd apartment from east at south
Jul 27, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 3rd room from north located at apt 3r, 3rd story, 2nd apartment from east at south
Jul 27, 2018 · Apt 3R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around wall base at bathtub in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south
Jul 27, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling and all walls in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south
Jul 27, 2018 · Apt 3R
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective inoperative bell/buzzer/intercom system from building entrance to panel at north wall in kitchen located at apt 3r, 3rd story, 2nd apartment from west at north
Jul 27, 2018 · Apt 3R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at west and south walls in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south
Jul 27, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in wasteline at washbasin in the bathroom located at apt 3r, 3rd story, 2nd apartment from west at north
Jul 27, 2018 · Apt 3R
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective ( unhinged ) doors at base cabinets at sink in the kitchen located at apt 3r, 3rd story, 2nd apartment from east at south
Jul 27, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling and all walls in the 4th room from north located at apt 3r, 3rd story, 2nd apartment from east at south
Jul 27, 2018 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story
Oct 5, 2010
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required
May 6, 2007
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system at 1st story public hall
Apr 10, 2007
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroom located at apt 3r, 3rd story, apartment at south
Nov 20, 2006 · Apt 3R
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of , 2 eyes, capable of being padlocked, at scuttle cover 3rd story public hall
Nov 20, 2006
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 3r, 3rd story, apartment at south
Nov 20, 2006 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system , door locked at cellar entrance
Nov 20, 2006
Closed — Violation closed - BHazardous
Replace or repair the self-closing the doors that is missing or defective in the entrance located at apt 3r, 3rd story, apartment at south
Nov 20, 2006 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the missing door knob in the entrance located at apt 3r, 3rd story, apartment at south
Nov 20, 2006 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the missing handle for radiator shut off valve in the kitchen located at apt 3r, 3rd story, apartment at south
Nov 20, 2006 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the missing handle for radiator shut off valve in the 4th room from east located at apt 3r, 3rd story, apartment at south
Nov 20, 2006 · Apt 3R
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination .. at public hall, 2nd story
Nov 20, 2006
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Nov 20, 2006
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at vestibule at public hall, 1st story
Sep 28, 2006
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 28, 2006
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at vestibule at public hall, 1st story
Sep 28, 2006
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at vestibule at public hall, 1st story
Sep 28, 2006
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 28, 2006
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Sep 28, 2006
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination .... at public hall, 2nd story
Sep 28, 2006
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2l, 2nd story, apartment at north
Sep 28, 2006 · Apt 2L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 2nd story, apartment at north
Sep 28, 2006 · Apt 2L
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of concealed water leak ceiling in the bathroom located at apt 2l, 2nd story, apartment at north
Sep 28, 2006 · Apt 2L
Closed — Violation closed - BHazardous
Properly secure the loose washbasin in the bathroom located at apt 2l, 2nd story, apartment at south
Sep 28, 2006 · Apt 2L
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of no bells front entrance hindering access to builing at front areaway
Sep 28, 2006
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .... in the bathroom located at apt 2l, 2nd story, apartment at north
Sep 28, 2006 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2l, 2nd story, apartment at north
Sep 28, 2006 · Apt 2L
Closed — Violation closed
DOB building violations · 23
- High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed
Show 13 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 9, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
Work without a permit. work noted: having erected steel plating at exterior wall at 1st story remedy: remove illegal steel plate aand restore existing wall
May 29, 2001
Vw*-violation - work w/o permit dismissed - Construction other optional
Hazardous
Feb 7, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Construction other optional
Work without a permit. work noted: having erected steel plating at exterior wall at 1st story rear remedy: remove illegal steel plate and restore exesting wall
Jul 26, 1999
Vw*-violation - work w/o permit dismissed - Construction other optional
Work without a permit. work noted: having erected steel plating at interior walls at 1st story rear remedy: remove illegal steel plate and restore existing wall
May 7, 1998
Vw*-violation - work w/o permit dismissed
ECB violations · 31
- Class - 2
During my inspection of a 6 story alteration, construction in progress, approx: 10 workers on-site, upon reaching the rear yard i observed that the adjoining property fences @ exp.#2 & 3 were not protected cont
Nov 13, 2023 · Penalty $1,250
Resolve - Class - 2
Responsibility for maintenance and use (bc 3307.6.5.3), at the time of inspection, observed 3 story building was under alteration, with no active construction, observed sidewalk shed at exp#1, doing further ins
Jan 14, 2023
Resolve - Class - 2
At time of inspection of class 1 violation #39505172n issued on 08-17-22 observed job site closed. upon researching bis and dob now no certificate of correction was filed. gc failed to comply with commissioner
Nov 2, 2022
Resolve - Class - 2
At time of inspection of class 1 violation #39505169m issued on 08-17-22 observed job site closed. upon researching bis and dob now no certificate of correction was filed. gc failed to comply with commissioner
Nov 2, 2022 · Penalty $625
Resolve - Class - 2
At the time of inspection of proposed 6 story alteration, observed closed job site. upon researching on dob system, certificate of correction for violation #39504838x was not filed. g.c failed to comply with c
Nov 2, 2022 · Penalty $625
Resolve - Class - 1
An ied, due to structural integrity issues to 3 stories of the building. no one was allowed in the building until overhead hazards and stability concerns have been eliminated. only workers under the supervision
Aug 17, 2022
Resolve - Class - 1
An ied, due to structural integrity issues to 3 stories of the building. no one was allowed in the building until overhead hazards and stability concerns have been eliminated. only workers under the supervision
Aug 17, 2022
Resolve - Class - 1
Failure to notify the department of an accident. at time of insp (requested by fdny) observed expo #3 exterior wall collapsed. incident took place on 08/08/2022 as per neighboring tenant & where construction si
Aug 9, 2022 · Penalty $5,000
Resolve - Class - 1
Failure to comply with fdny code for fire extinguisher. on 6 story alt1 site facade collapsed at rear observe existing 3 story lumber structure and no 2a20bc fire extinguisher to code bc 3303.7.2+fc 906.3 at ev
Aug 9, 2022 · Penalty $625
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. at time of inspection premises under alt1 # 321596607 vertical enlargement, observed entire exposure #3 exterior wall has bee
Aug 9, 2022 · Penalty $2,500
Resolve
Show 21 more ↓
- Class - 1
Failure to safe guard all persons & property. at time of inspection no overhead protection for adjoining property's during demolition where wall has collapsed also no protection at expo#1 construction debris ha
Aug 9, 2022 · Penalty $10,000
Resolve - Class - 1
Failure to weatherproof adjoining property bc 3309.9.on 6 story alt1 site facade collapsed at rear i observe site interior and roof demolished exposing exposure#2 property 915 broadway wall and roof open to ele
Aug 9, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to maintain elements in existing buildings, fire escape bc 3303.9. on 6 story alt1 site facade collapsed at rear observe fire escape not in place for the existing 3 story section of the building not to
Aug 9, 2022 · Penalty $2,500
Resolve - Class - 1
Construction superintendent failed to perform duties as per. at time of inspection with approximately 10 workers at site actively cleaning up exposure #3 exterior wall collapse where 2nd & 3rd floors left unsup
Aug 9, 2022 · Penalty $10,000
Resolve - Class - 1
Failure to secure openings/penetrations. at time of inspection observed multiple openings approximately 3'x3' at all levels left unsecured & unprotected from trips 7 falls. (bc 3301.2); 3301.2, comply with code
Aug 9, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guard rails. at time of inspection observed at interior openings at stairs no guard rails along with exposure #3 at all level
Aug 9, 2022 · Penalty $2,500
Resolve - Class - 1
On 6 story alt1 site demolished interior+roof and facade collapsed at rear observe existing stairs from cellar to 3rd floor level missing stair handrails to code bc3301.2+1009.12 and bc3301.1+osha 1910.29(f)-19
Aug 9, 2022 · Penalty $1,000
Resolve - Class - 1
On 6 story alt1 site facade collapsed at rear i observe housekeeping not to codes bc 3303.4.1, 3303.4+exceptions,3303.4.5.1, 3303.4.7 throughout floors+stairs and on sidewalk exposing hazardous conditions to p
Aug 9, 2022
Resolve - Class - 2
On 6 story alt1 site collapsed facade at rear observe no project information sign posted at front per code bc 3301.9, 3301.9.1.1 to 3301.9.1.4post project information sign to codes in violation details
Aug 9, 2022 · Penalty $625
Resolve - Class - 1
Failure to provide job fence bc 3307.7 to 3307.7.1. on 6 story alt1 site facade collapsed at rear observed collapsed facade debris/structure on exposure#4 adjacent property rear yard (921 broadway) and no job f
Aug 9, 2022 · Penalty $500
Resolve - Class - 1
On 6 story (60ft) alt1 site facade collapsed at rear observed 3 story existing structure roof demolished (30ft above ground level) and no sidewalk shed in place to code bc 3307.6.2(2) and 3307.6.2(4)+exceptions
Aug 9, 2022 · Penalty $10,000
Resolve - Class - 1
Failure to maintain record of pre-shift safety meeting for each worker. at time of inspection observed ongoing work has been performed with approximately 10 workers removing construction debris, requested pre-s
Aug 9, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to provide safety measures for debris container to code bc 3307.4.3. on 6 story alt1 site with facade collapsed at rear observe debris container on public/road way front of site with sites debris within
Aug 9, 2022
Resolve - Class - 2
B254,5b,15,24b,32a,38,50. 50-hot water heater safety valve leaking.
Mar 11, 2015 · Penalty $250
Resolve - Hazardous
21a,40,32a,38,50a,b. 1988 fulton nb 54186. 50a- reverse the bottom blowdown valves- quick first then slow. 50b- all valves on the boiler nust be rated for 200 psi/ stm
Oct 17, 2006
Resolve - Non-hazardous
B4a/ 25a/ 36/ 44d/ 50a/ 50b/ 50c/ 50(a) install safety valve individually (safety valve not installed individually and discharge not pipe down to a safe location 50(b) holes on the boiler room ceiling 50(c)
Oct 2, 2006 · Penalty $350
Resolve - Non-hazardous
18b/50d 48b 32a 50a 50b 50c 1988 fulton natl bd 54186 50a) replace themissing valve handle on the top valve glass assembly 50b) pipe the glass drain valve down to a safe point. 50c) in addition to the quick
Jan 18, 2005
Resolve - Non-hazardous
Work without a permit.work noted:having erected steel plating at exterior wall at first story.remedy:remove illegal steel plate and restore existing wall.
May 29, 2001
Resolve - Hazardous
Failure to maintain building.noted:apt 3l kitchen floor is out of plumb and also sagging in danger of collapsing.remedy:maintain building.
Feb 7, 2001 · Penalty $800
Resolve - Non-hazardous
Work w/o a permit. work noted: having erected steel plating at exterior wall at 1st story rear. remedy: remove illegal steel plate &restore existing wall.
Jul 26, 1999 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit - work noted: having erected steel plating at interior walls at 1st story rear. remedy: remove illegal steel plate and restore existing walls.
May 7, 1998 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
May 5, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jan 31, 2020 · Apt 3L
Close - General
Janitor/super
Jan 30, 2020 · Apt 3L
Close - Water leak
Heavy flow
Jan 30, 2020 · Apt 3L
Close - Heat/hot water
Entire building
Nov 15, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2019 · Apt 3
Close - Heat/hot water
Apartment only
Dec 31, 2018 · Apt 3L
Close - Electric
Power outage
Dec 31, 2018 · Apt 3L
Close - Heat/hot water
Apartment only
Nov 14, 2018 · Apt 3L
Close
Show 40 more ↓
- Electric
Power outage
Nov 14, 2018 · Apt 3L
Close - Heat/hot water
Entire building
Nov 14, 2018 · Apt 3R
Close - General
Bell/buzzer/intercom
Jul 24, 2018 · Apt 3R
Close - Appliance
Electric/gas range
Jul 24, 2018 · Apt 3R
Close - Paint/plaster
Wall
Jul 24, 2018 · Apt 3R
Close - Plumbing
Basin/sink
Jul 24, 2018 · Apt 3R
Close - Plumbing
Basin/sink
Jul 24, 2018 · Apt 3R
Close - Water leak
Slow leak
Jul 24, 2018 · Apt 3R
Close - Door/window
Door
Jul 24, 2018 · Apt 3R
Close - Paint/plaster
Wall
Jul 24, 2018 · Apt 3R
Close - Appliance
Refrigerator
Jul 24, 2018 · Apt 3R
Close - Electric
Power outage
Feb 3, 2018 · Apt 2R
Close - Heat/hot water
Apartment only
Feb 3, 2018 · Apt 2R
Close - Heat/hot water
Apartment only
Jan 2, 2018 · Apt 3L
Close - Electric
No lighting
Dec 18, 2017 · Apt 3L
Close - Heat/hot water
Entire building
Dec 11, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2015 · Apt 1
Close - Heat/hot water
Entire building
Oct 8, 2014 · Apt BLDG
Close - Electric
Electric-supply
Aug 22, 2012 · Apt 2L
Close - Heating
Heat related
Nov 5, 2011 · Apt BLDG
Close - Nonconst
Vermin
Oct 2, 2010 · Apt 3L
Close - General
Mailbox
Oct 2, 2010 · Apt 3L
Close - Electric
Wiring
Oct 2, 2010 · Apt 3L
Close - Electric
Wiring
Oct 2, 2010 · Apt 3L
Close - Construction
Roof
Oct 2, 2010 · Apt 3L
Close - General
Stairs
Oct 2, 2010 · Apt 3L
Close - General
Floor
Oct 2, 2010 · Apt 3L
Close - Electric
Wiring
Oct 2, 2010 · Apt 3L
Close - Appliance
Refrigerator
Oct 2, 2010 · Apt 3L
Close - Nonconst
Vermin
Oct 2, 2010 · Apt 3L
Close - Heating
Heat related
Jan 6, 2009 · Apt 2R
Close - Heating
Heat related
Jan 4, 2009 · Apt 3R
Close - Heating
Heat related
Nov 18, 2008 · Apt 3R
Close - Heating
Heat related
Nov 18, 2008 · Apt 3R
Close - Heating
Heat related
Nov 18, 2008 · Apt 3R
Close - Heating
Heat related
Oct 21, 2008 · Apt 2R
Close - Plumbing
Radiator
Oct 19, 2008 · Apt 3R
Close - Plumbing
Radiator
Oct 19, 2008 · Apt 3R
Close - General
Doors
Oct 19, 2008 · Apt 3R
Close - Heating
Heat related
Oct 19, 2008 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1931
- Floors
- 6
- Residential units
- 8
- Building area
- 9,733 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 34
- Block / lot
- 3150 / 3
- Assessed value
- $951,300
- Landmark / historic district
- No
HPD registration #343405, last renewed Oct 1, 2025.
Questions about 917 Broadway
Who owns 917 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is B 917 Broadway Realty LLC.
Does 917 Broadway have violations?
Yes. NYC HPD has recorded 58 housing violations at this property.
Is 917 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 917 Broadway built?
City records list 1931 as the year it was built.
How many apartments are in 917 Broadway?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.