917 Broadway is an elevator apartment building built in 1931 in Brooklyn, 11206. It has 8 residential units across 6 floors. The owner of record is B 917 Broadway Realty LLC. HPD has recorded 58 housing violations here, most recently on April 9, 2024.

HPD violations
58
DOB violations
23
ECB violations
31
HPD complaints
151

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 9, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 58

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 23, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 7, 2021

    Closed — Violation dismissed
  • B

    Replace or repair the self-closing doors that is missing or defective rear entrance to building

    Feb 11, 2019

    Closed — Violation closed
  • B

    Properly secure the loose bell system at entrance to building

    Feb 11, 2019

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Feb 11, 2019

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Feb 11, 2019

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Feb 11, 2019

    Closed — Violation closed
  • B

    Properly repair the broken or defective mail box receptacle at public hall, 1st story

    Feb 11, 2019

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors front entrance to building

    Feb 11, 2019

    Closed — Violation closed
Show 40 more ↓
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the kitchen located at apt 3r, 3rd story, 2nd apartment from west at north

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Replace or repair the self-closing the doors that is missing or defective at north entrance located at apt 3r, 3rd story, 2nd apartment from east at south

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 27, 2018

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north, east, and west walls in the kitchen located at apt 3r, 3rd story, 2nd apartment from east at south

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ..all walls in the 3rd room from north located at apt 3r, 3rd story, 2nd apartment from east at south

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 3rd room from north located at apt 3r, 3rd story, 2nd apartment from east at south

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective caulking around wall base at bathtub in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling and all walls in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • A

    Properly repair the broken or defective inoperative bell/buzzer/intercom system from building entrance to panel at north wall in kitchen located at apt 3r, 3rd story, 2nd apartment from west at north

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective ceramic tiles at west and south walls in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in wasteline at washbasin in the bathroom located at apt 3r, 3rd story, 2nd apartment from west at north

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • A

    Properly repair the broken or defective ( unhinged ) doors at base cabinets at sink in the kitchen located at apt 3r, 3rd story, 2nd apartment from east at south

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling and all walls in the 4th room from north located at apt 3r, 3rd story, 2nd apartment from east at south

    Jul 27, 2018 · Apt 3R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story

    Oct 5, 2010

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required

    May 6, 2007

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system at 1st story public hall

    Apr 10, 2007

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroom located at apt 3r, 3rd story, apartment at south

    Nov 20, 2006 · Apt 3R

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of , 2 eyes, capable of being padlocked, at scuttle cover 3rd story public hall

    Nov 20, 2006

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 3r, 3rd story, apartment at south

    Nov 20, 2006 · Apt 3R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system , door locked at cellar entrance

    Nov 20, 2006

    Closed — Violation closed
  • B

    Replace or repair the self-closing the doors that is missing or defective in the entrance located at apt 3r, 3rd story, apartment at south

    Nov 20, 2006 · Apt 3R

    Closed — Violation closed
  • B

    Replace with new the missing door knob in the entrance located at apt 3r, 3rd story, apartment at south

    Nov 20, 2006 · Apt 3R

    Closed — Violation closed
  • B

    Replace with new the missing handle for radiator shut off valve in the kitchen located at apt 3r, 3rd story, apartment at south

    Nov 20, 2006 · Apt 3R

    Closed — Violation closed
  • B

    Replace with new the missing handle for radiator shut off valve in the 4th room from east located at apt 3r, 3rd story, apartment at south

    Nov 20, 2006 · Apt 3R

    Closed — Violation closed
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination .. at public hall, 2nd story

    Nov 20, 2006

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story

    Nov 20, 2006

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at vestibule at public hall, 1st story

    Sep 28, 2006

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 28, 2006

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at vestibule at public hall, 1st story

    Sep 28, 2006

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at vestibule at public hall, 1st story

    Sep 28, 2006

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 28, 2006

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard

    Sep 28, 2006

    Closed — Violation closed
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination .... at public hall, 2nd story

    Sep 28, 2006

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2l, 2nd story, apartment at north

    Sep 28, 2006 · Apt 2L

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 2nd story, apartment at north

    Sep 28, 2006 · Apt 2L

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of concealed water leak ceiling in the bathroom located at apt 2l, 2nd story, apartment at north

    Sep 28, 2006 · Apt 2L

    Closed — Violation closed
  • B

    Properly secure the loose washbasin in the bathroom located at apt 2l, 2nd story, apartment at south

    Sep 28, 2006 · Apt 2L

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of no bells front entrance hindering access to builing at front areaway

    Sep 28, 2006

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .... in the bathroom located at apt 2l, 2nd story, apartment at north

    Sep 28, 2006 · Apt 2L

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2l, 2nd story, apartment at north

    Sep 28, 2006 · Apt 2L

    Closed — Violation closed

DOB building violations · 23

  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
Show 13 more ↓
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 internal high pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 external high pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 9, 2022

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Construction other optional

    Work without a permit. work noted: having erected steel plating at exterior wall at 1st story remedy: remove illegal steel plate aand restore existing wall

    May 29, 2001

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    Hazardous

    Feb 7, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Construction other optional

    Work without a permit. work noted: having erected steel plating at exterior wall at 1st story rear remedy: remove illegal steel plate and restore exesting wall

    Jul 26, 1999

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    Work without a permit. work noted: having erected steel plating at interior walls at 1st story rear remedy: remove illegal steel plate and restore existing wall

    May 7, 1998

    Vw*-violation - work w/o permit dismissed

ECB violations · 31

  • Class - 2

    During my inspection of a 6 story alteration, construction in progress, approx: 10 workers on-site, upon reaching the rear yard i observed that the adjoining property fences @ exp.#2 & 3 were not protected cont

    Nov 13, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Responsibility for maintenance and use (bc 3307.6.5.3), at the time of inspection, observed 3 story building was under alteration, with no active construction, observed sidewalk shed at exp#1, doing further ins

    Jan 14, 2023

    Resolve
  • Class - 2

    At time of inspection of class 1 violation #39505172n issued on 08-17-22 observed job site closed. upon researching bis and dob now no certificate of correction was filed. gc failed to comply with commissioner

    Nov 2, 2022

    Resolve
  • Class - 2

    At time of inspection of class 1 violation #39505169m issued on 08-17-22 observed job site closed. upon researching bis and dob now no certificate of correction was filed. gc failed to comply with commissioner

    Nov 2, 2022 · Penalty $625

    Resolve
  • Class - 2

    At the time of inspection of proposed 6 story alteration, observed closed job site. upon researching on dob system, certificate of correction for violation #39504838x was not filed. g.c failed to comply with c

    Nov 2, 2022 · Penalty $625

    Resolve
  • Class - 1

    An ied, due to structural integrity issues to 3 stories of the building. no one was allowed in the building until overhead hazards and stability concerns have been eliminated. only workers under the supervision

    Aug 17, 2022

    Resolve
  • Class - 1

    An ied, due to structural integrity issues to 3 stories of the building. no one was allowed in the building until overhead hazards and stability concerns have been eliminated. only workers under the supervision

    Aug 17, 2022

    Resolve
  • Class - 1

    Failure to notify the department of an accident. at time of insp (requested by fdny) observed expo #3 exterior wall collapsed. incident took place on 08/08/2022 as per neighboring tenant & where construction si

    Aug 9, 2022 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to comply with fdny code for fire extinguisher. on 6 story alt1 site facade collapsed at rear observe existing 3 story lumber structure and no 2a20bc fire extinguisher to code bc 3303.7.2+fc 906.3 at ev

    Aug 9, 2022 · Penalty $625

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments. at time of inspection premises under alt1 # 321596607 vertical enlargement, observed entire exposure #3 exterior wall has bee

    Aug 9, 2022 · Penalty $2,500

    Resolve
Show 21 more ↓
  • Class - 1

    Failure to safe guard all persons & property. at time of inspection no overhead protection for adjoining property's during demolition where wall has collapsed also no protection at expo#1 construction debris ha

    Aug 9, 2022 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to weatherproof adjoining property bc 3309.9.on 6 story alt1 site facade collapsed at rear i observe site interior and roof demolished exposing exposure#2 property 915 broadway wall and roof open to ele

    Aug 9, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain elements in existing buildings, fire escape bc 3303.9. on 6 story alt1 site facade collapsed at rear observe fire escape not in place for the existing 3 story section of the building not to

    Aug 9, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Construction superintendent failed to perform duties as per. at time of inspection with approximately 10 workers at site actively cleaning up exposure #3 exterior wall collapse where 2nd & 3rd floors left unsup

    Aug 9, 2022 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to secure openings/penetrations. at time of inspection observed multiple openings approximately 3'x3' at all levels left unsecured & unprotected from trips 7 falls. (bc 3301.2); 3301.2, comply with code

    Aug 9, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction-no guard rails. at time of inspection observed at interior openings at stairs no guard rails along with exposure #3 at all level

    Aug 9, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    On 6 story alt1 site demolished interior+roof and facade collapsed at rear observe existing stairs from cellar to 3rd floor level missing stair handrails to code bc3301.2+1009.12 and bc3301.1+osha 1910.29(f)-19

    Aug 9, 2022 · Penalty $1,000

    Resolve
  • Class - 1

    On 6 story alt1 site facade collapsed at rear i observe housekeeping not to codes bc 3303.4.1, 3303.4+exceptions,3303.4.5.1, 3303.4.7 throughout floors+stairs and on sidewalk exposing hazardous conditions to p

    Aug 9, 2022

    Resolve
  • Class - 2

    On 6 story alt1 site collapsed facade at rear observe no project information sign posted at front per code bc 3301.9, 3301.9.1.1 to 3301.9.1.4post project information sign to codes in violation details

    Aug 9, 2022 · Penalty $625

    Resolve
  • Class - 1

    Failure to provide job fence bc 3307.7 to 3307.7.1. on 6 story alt1 site facade collapsed at rear observed collapsed facade debris/structure on exposure#4 adjacent property rear yard (921 broadway) and no job f

    Aug 9, 2022 · Penalty $500

    Resolve
  • Class - 1

    On 6 story (60ft) alt1 site facade collapsed at rear observed 3 story existing structure roof demolished (30ft above ground level) and no sidewalk shed in place to code bc 3307.6.2(2) and 3307.6.2(4)+exceptions

    Aug 9, 2022 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to maintain record of pre-shift safety meeting for each worker. at time of inspection observed ongoing work has been performed with approximately 10 workers removing construction debris, requested pre-s

    Aug 9, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide safety measures for debris container to code bc 3307.4.3. on 6 story alt1 site with facade collapsed at rear observe debris container on public/road way front of site with sites debris within

    Aug 9, 2022

    Resolve
  • Class - 2

    B254,5b,15,24b,32a,38,50. 50-hot water heater safety valve leaking.

    Mar 11, 2015 · Penalty $250

    Resolve
  • Hazardous

    21a,40,32a,38,50a,b. 1988 fulton nb 54186. 50a- reverse the bottom blowdown valves- quick first then slow. 50b- all valves on the boiler nust be rated for 200 psi/ stm

    Oct 17, 2006

    Resolve
  • Non-hazardous

    B4a/ 25a/ 36/ 44d/ 50a/ 50b/ 50c/ 50(a) install safety valve individually (safety valve not installed individually and discharge not pipe down to a safe location 50(b) holes on the boiler room ceiling 50(c)

    Oct 2, 2006 · Penalty $350

    Resolve
  • Non-hazardous

    18b/50d 48b 32a 50a 50b 50c 1988 fulton natl bd 54186 50a) replace themissing valve handle on the top valve glass assembly 50b) pipe the glass drain valve down to a safe point. 50c) in addition to the quick

    Jan 18, 2005

    Resolve
  • Non-hazardous

    Work without a permit.work noted:having erected steel plating at exterior wall at first story.remedy:remove illegal steel plate and restore existing wall.

    May 29, 2001

    Resolve
  • Hazardous

    Failure to maintain building.noted:apt 3l kitchen floor is out of plumb and also sagging in danger of collapsing.remedy:maintain building.

    Feb 7, 2001 · Penalty $800

    Resolve
  • Non-hazardous

    Work w/o a permit. work noted: having erected steel plating at exterior wall at 1st story rear. remedy: remove illegal steel plate &restore existing wall.

    Jul 26, 1999 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work without a permit - work noted: having erected steel plating at interior walls at 1st story rear. remedy: remove illegal steel plate and restore existing walls.

    May 7, 1998 · Penalty $250

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    May 5, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jan 31, 2020 · Apt 3L

    Close
  • General

    Janitor/super

    Jan 30, 2020 · Apt 3L

    Close
  • Water leak

    Heavy flow

    Jan 30, 2020 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 5, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 10, 2019 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Dec 31, 2018 · Apt 3L

    Close
  • Electric

    Power outage

    Dec 31, 2018 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2018 · Apt 3L

    Close
Show 40 more ↓
  • Electric

    Power outage

    Nov 14, 2018 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Nov 14, 2018 · Apt 3R

    Close
  • General

    Bell/buzzer/intercom

    Jul 24, 2018 · Apt 3R

    Close
  • Appliance

    Electric/gas range

    Jul 24, 2018 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Jul 24, 2018 · Apt 3R

    Close
  • Plumbing

    Basin/sink

    Jul 24, 2018 · Apt 3R

    Close
  • Plumbing

    Basin/sink

    Jul 24, 2018 · Apt 3R

    Close
  • Water leak

    Slow leak

    Jul 24, 2018 · Apt 3R

    Close
  • Door/window

    Door

    Jul 24, 2018 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Jul 24, 2018 · Apt 3R

    Close
  • Appliance

    Refrigerator

    Jul 24, 2018 · Apt 3R

    Close
  • Electric

    Power outage

    Feb 3, 2018 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2018 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Jan 2, 2018 · Apt 3L

    Close
  • Electric

    No lighting

    Dec 18, 2017 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Dec 11, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2015 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Oct 8, 2014 · Apt BLDG

    Close
  • Electric

    Electric-supply

    Aug 22, 2012 · Apt 2L

    Close
  • Heating

    Heat related

    Nov 5, 2011 · Apt BLDG

    Close
  • Nonconst

    Vermin

    Oct 2, 2010 · Apt 3L

    Close
  • General

    Mailbox

    Oct 2, 2010 · Apt 3L

    Close
  • Electric

    Wiring

    Oct 2, 2010 · Apt 3L

    Close
  • Electric

    Wiring

    Oct 2, 2010 · Apt 3L

    Close
  • Construction

    Roof

    Oct 2, 2010 · Apt 3L

    Close
  • General

    Stairs

    Oct 2, 2010 · Apt 3L

    Close
  • General

    Floor

    Oct 2, 2010 · Apt 3L

    Close
  • Electric

    Wiring

    Oct 2, 2010 · Apt 3L

    Close
  • Appliance

    Refrigerator

    Oct 2, 2010 · Apt 3L

    Close
  • Nonconst

    Vermin

    Oct 2, 2010 · Apt 3L

    Close
  • Heating

    Heat related

    Jan 6, 2009 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 4, 2009 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 18, 2008 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 18, 2008 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 18, 2008 · Apt 3R

    Close
  • Heating

    Heat related

    Oct 21, 2008 · Apt 2R

    Close
  • Plumbing

    Radiator

    Oct 19, 2008 · Apt 3R

    Close
  • Plumbing

    Radiator

    Oct 19, 2008 · Apt 3R

    Close
  • General

    Doors

    Oct 19, 2008 · Apt 3R

    Close
  • Heating

    Heat related

    Oct 19, 2008 · Apt 3R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
1931
Floors
6
Residential units
8
Building area
9,733 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
34
Block / lot
3150 / 3
Assessed value
$951,300
Landmark / historic district
No

HPD registration #343405, last renewed Oct 1, 2025.

Questions about 917 Broadway

Who owns 917 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is B 917 Broadway Realty LLC.

Does 917 Broadway have violations?

Yes. NYC HPD has recorded 58 housing violations at this property.

Is 917 Broadway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 917 Broadway built?

City records list 1931 as the year it was built.

How many apartments are in 917 Broadway?

It has 8 residential units and 9 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.