roofy

921 Broadway

Brooklyn, NY 11206BBL 3-03150-0002Map

Owner of record: 921 Broadway Realty L

921 Broadway is a mixed residential and retail building built in 1931 in Brooklyn, 11206. It has 6 residential units across 4 floors. The owner of record is 921 Broadway Realty L. HPD has recorded 40 housing violations here, most recently on July 21, 2026. 3 of the 40 most recent violations are still open.

HPD violations
40
DOB violations
18
ECB violations
4
HPD complaints
203

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 21, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 40

  • A

    Paint with light colored paint to the satisfaction of this department the south wall at public hall, 1st story

    Jul 21, 2026

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood base board at south wall at vestibule at public hall, 1st story

    Jul 21, 2026

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material south wall at public hall, 1st story

    Jul 21, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story

    Jul 7, 2026

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west

    Jun 16, 2026 · Apt 2A

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west

    Jun 16, 2026 · Apt 2A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door

    Jun 16, 2026

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    Jun 16, 2026 · Apt 2A

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    Jun 16, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    Jun 16, 2026 · Apt 2A

    Closed — Violation dismissed
Show 30 more ↓
  • C

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at basement

    Jun 16, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at boiler room

    Jun 16, 2026

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west original violation 19009702 issued 16-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jun 16, 2026 · Apt 2A

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at boiler room

    Jun 16, 2026

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at ceiling at basement

    Jun 16, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance door

    Jun 10, 2026

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective mortise lock at building entrance door.

    Jun 10, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door

    Jun 10, 2026

    Closed — Violation closed
  • B

    Replace with new the missing lock at building front entrance door , 1st story

    Jun 1, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance door

    Apr 8, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door

    Apr 8, 2026

    Open — Not complied with
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    May 1, 2024 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the cieling and west wall in the 1st room from east located at apt 3r, 3rd story, 1st apartment from south at west

    May 1, 2024 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west

    May 1, 2024 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    May 1, 2024 · Apt 3R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 5 sq.ft. at cieling in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west

    May 1, 2024 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the cieling in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west

    May 1, 2024 · Apt 3R

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west

    May 1, 2024 · Apt 3R

    Closed — Violation dismissed
  • C

    Properly repair the broken or defective building entrance door lock at public hall, 1st story

    Jan 26, 2022

    Closed — Violation dismissed
  • C

    Properly repair the broken or defective heavy duty lock and latch set at front entrance door to building , 1st story

    May 28, 2021

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 4r, 4th story, 1st apartment from east at south

    Jun 19, 2006 · Apt 4R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 4r, 4th story, 1st apartment from east at south

    Jun 19, 2006 · Apt 4R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall in the 2nd room from east located at apt 4r, 4th story, 1st apartment from east at south

    Jun 19, 2006 · Apt 4R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall in the 3rd room from east located at apt 4r, 4th story, 1st apartment from east at south

    Jun 19, 2006 · Apt 4R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall in the 4th room from east located at apt 4r, 4th story, 1st apartment from east at south

    Jun 19, 2006 · Apt 4R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 2l, 2nd story

    Apr 8, 2006 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, east wall, west wall in the bathroom located at apt 2l, 2nd story

    Apr 8, 2006 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall in the 3rd room from east located at apt 2l, 2nd story

    Apr 8, 2006 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the 2nd room from east located at apt 3l, 3rd story, 1st apartment from west at north

    Oct 8, 2005 · Apt 3L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from east located at apt 3l, 3rd story, 1st apartment from west at north

    Oct 8, 2005 · Apt 3L

    Closed — Violation closed

DOB building violations · 18

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
Show 8 more ↓
  • Construction other optional

    C-construction other optional

    Apr 9, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boiler boiler optional

    B-boiler boiler optional

    Apr 15, 1993

    Dob violation - active
  • Boiler boiler optional

    6d/31a/39c

    Oct 12, 1989

    Vp-violation unserved ecb-active

ECB violations · 4

  • Class - 1

    Failure to maintain building in code-complaint manner. note: at 1st flcommercial space ("beauty bar") of above premises emergency exit lighting & exit sign at front is defective. remedy: repair/replace defectiv

    Aug 19, 2010 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to maintain building in code-complaint manner. no fire stopping per bc 712.3;27-345. note: at cellar level of above premises sheet rock ceiling is missing at various locations. remedy: provide/maintain

    Aug 19, 2010 · Penalty $1,000

    Resolve
  • Non-hazardous

    6d,31a,39c

    Oct 31, 1990 · Penalty $285

    Resolve
  • Non-hazardous

    Safety or relief valve inet reduced. wiring exposed. fire chamber door improper closing.

    Oct 12, 1989 · Penalty $100

    Resolve

Complaints

  • Door/window

    Door

    Jun 22, 2026 · Apt 2R

    Close
  • Plumbing

    Water supply

    Jun 22, 2026 · Apt 2R

    Close
  • Appliance

    Electric/gas range

    Jun 22, 2026 · Apt 2R

    Close
  • General

    Bell/buzzer/intercom

    Jun 10, 2026 · Apt 3A

    Close
  • Door/window

    Door

    Jun 10, 2026 · Apt 3A

    Close
  • Door/window

    Door

    Jun 10, 2026 · Apt 3A

    Close
  • General

    Cooking gas

    Jun 9, 2026 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Jun 9, 2026 · Apt 2R

    Close
  • Door/window

    Door

    Jun 9, 2026 · Apt 2R

    Close
  • Plumbing

    Water supply

    Jun 9, 2026 · Apt 2R

    Close
Show 40 more ↓
  • Appliance

    Electric/gas range

    Jun 9, 2026 · Apt 2R

    Close
  • Door/window

    Door

    Jun 9, 2026 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Jun 9, 2026 · Apt 2R2A

    Close
  • General

    Cooking gas

    Jun 9, 2026 · Apt 2R2A

    Close
  • Door/window

    Door

    Jun 9, 2026 · Apt 2R2A

    Close
  • Heat/hot water

    Apartment only

    Jun 8, 2026 · Apt 2R2A

    Close
  • General

    Cooking gas

    Jun 8, 2026 · Apt 2R2A

    Close
  • Door/window

    Door

    Jun 8, 2026 · Apt 2R2A

    Close
  • General

    Cooking gas

    Jun 7, 2026 · Apt 2R2A

    Close
  • Door/window

    Door

    Jun 7, 2026 · Apt 2R2A

    Close
  • Heat/hot water

    Apartment only

    Jun 7, 2026 · Apt 2R2A

    Close
  • Appliance

    Electric/gas range

    Jun 6, 2026 · Apt 2R2A

    Close
  • Door/window

    Door

    Jun 6, 2026 · Apt 2R2A

    Close
  • Heat/hot water

    Apartment only

    Jun 6, 2026 · Apt 2R2A

    Close
  • Door/window

    Door

    May 16, 2026 · Apt 2L

    Close
  • Plumbing

    Water supply

    Apr 6, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Feb 22, 2026 · Apt 3A

    Close
  • Door/window

    Door

    Feb 21, 2026 · Apt MAINEN

    Close
  • Unsanitary condition

    Mold

    Aug 26, 2025 · Apt 4R

    Close
  • Paint/plaster

    Wall

    Apr 9, 2024 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2022 · Apt 3A

    Close
  • Electric

    Power outage

    Dec 26, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2022 · Apt BLDG

    Close
  • General

    Cooking gas

    Dec 26, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 23, 2022 · Apt 3R

    Close
  • Electric

    Power outage

    Mar 23, 2022 · Apt 3R3A

    Close
  • Door/window

    Door frame

    Jan 26, 2022 · Apt 4A

    Close
  • Door/window

    Door

    Jan 26, 2022 · Apt 4A

    Close
  • Electric

    Power outage

    Jan 22, 2022 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2022 · Apt 4B4L

    Close
  • Door/window

    Door frame

    May 20, 2021 · Apt APT4A

    Close
  • Door/window

    Door

    Oct 30, 2020 · Apt 4A

    Close
  • Door/window

    Door

    Oct 23, 2020 · Apt 4A

    Close
  • Door/window

    Door

    Jul 23, 2020 · Apt 4A

    Close
  • Plumbing

    Basin/sink

    Jul 23, 2020 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Jul 23, 2020 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Oct 29, 2016 · Apt 4LB

    Close
  • Heating

    Heat related

    Oct 1, 2009 · Apt 3L

    Close
  • Heating

    Heat related

    Dec 14, 2007 · Apt 3R

    Close
  • General

    Mold

    Dec 14, 2007 · Apt 3R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1931
Floors
4
Residential units
6
Building area
6,000 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
34
Block / lot
3150 / 2
Assessed value
$682,650
Landmark / historic district
No

HPD registration #365256, last renewed Aug 29, 2025.

Questions about 921 Broadway

Who owns 921 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is 921 Broadway Realty L.

Does 921 Broadway have violations?

Yes. NYC HPD has recorded 40 housing violations at this property.

Is 921 Broadway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 921 Broadway built?

City records list 1931 as the year it was built.

How many apartments are in 921 Broadway?

It has 6 residential units and 7 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.