40 Debevoise Street
Brooklyn, NY 11206BBL 3-03127-7501Map
Owner of record: Unavailable Owner
40 Debevoise Street is a condominium built in 2018 in Brooklyn, 11206. It has 65 residential units across 8 floors. The owner of record is Unavailable Owner. HPD has recorded 87 housing violations here, most recently on October 19, 2026. 8 of the 50 most recent violations are still open. City tax records listed 65 rent-stabilized apartments here in 2024.
- HPD violations
- 87
- DOB violations
- 32
- ECB violations
- 50
- HPD complaints
- 55
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 87
- BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor
Oct 19, 2026
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective mirror at elevator
Sep 30, 2026
Open — Nov certified on time - CImmediately hazardous
M/d law abate the nuisance consisting of unopenable fire egress door 1st from south at west at public hall, 3rd story
Apr 5, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective door latch at stairway a at public hall, 6th story
Mar 10, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective door latch at stairway a at public hall, 3rd story
Mar 10, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door at compactor closet, 5th story
Mar 7, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6g, 6th story
Feb 9, 2026 · Apt 6G
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door. at boiler room
Feb 9, 2026
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at compactor closets
Jan 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet at compactor closet
Jan 27, 2026
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the food and raw sewage at compactor closets
Jan 27, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door at electricall metter room at basement
Dec 9, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective locking mechanism at the 1st window from east at north in the 1st room from north located at apt 3j, 3rd story, 4th apartment from west at north
Nov 27, 2025 · Apt 3J
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the the floor tiles at compactor closet, 6th story
Sep 19, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 6th story
Aug 26, 2025
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the entire apartment located at apt 6a, 6th story, 1st apartment from east at south
Jul 14, 2025 · Apt 6A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective handle at casement window at north in the 1st room from north located at apt 6h, 6th story, 3rd apartment from west at north
Jul 2, 2025 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6a, 6th story, 1st apartment from west at north
May 28, 2025 · Apt 6A
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6a, 6th story, 1st apartment from west at north
May 28, 2025 · Apt 6A
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6a, 6th story, 1st apartment from west at north
May 28, 2025 · Apt 6A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5g, 5th story, 2nd apartment from west at north
May 20, 2025 · Apt 5G
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5g, 5th story, 2nd apartment from west at north
May 20, 2025 · Apt 5G
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4j, 4th story, 4th apartment from west at north
May 7, 2025 · Apt 4J
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 7b, 7th story, 1st apartment from east at south
Apr 28, 2025 · Apt 7B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 6a, 6th story, 1st apartment from west at north
Apr 28, 2025 · Apt 6A
Open — Not complied with - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 6a, 6th story, 1st apartment from west at north
Apr 28, 2025 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 7f, 7th story, 1st apartment from west at north
Apr 28, 2025 · Apt 7F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 7f, 7th story, 1st apartment from west at north
Apr 28, 2025 · Apt 7F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 7c, 7th story, 2nd apartment from east at south
Apr 28, 2025 · Apt 7C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7c, 7th story, 2nd apartment from east at south
Apr 28, 2025 · Apt 7C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 7b, 7th story, 1st apartment from east at south
Apr 28, 2025 · Apt 7B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 7a, 7th story, 1st apartment from south at west
Apr 28, 2025 · Apt 7A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 7a, 7th story, 1st apartment from south at west
Apr 28, 2025 · Apt 7A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7a, 7th story, 1st apartment from south at west
Apr 28, 2025 · Apt 7A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 6d, 6th story, 3rd apartment from east at south
Apr 28, 2025 · Apt 6D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5g, 5th story, 2nd apartment from west at north
Apr 28, 2025 · Apt 5G
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5g, 5th story, 2nd apartment from west at north
Apr 28, 2025 · Apt 5G
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6a, 6th story, 1st apartment from west at north
Apr 28, 2025 · Apt 6A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 6d, 6th story, 3rd apartment from east at south
Apr 28, 2025 · Apt 6D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 6a, 6th story, 1st apartment from west at north
Apr 28, 2025 · Apt 6A
Open — Not complied with - BHazardous
Remove all obstructions and repair all defects in watercloset in the bathroom located at apt 6a, 6th story, 1st apartment from west at north
Apr 28, 2025 · Apt 6A
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector defective located at apt 7c, 7th story, 2nd apartment from east at south
Apr 28, 2025 · Apt 7C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2j, 2nd story, 2nd apartment from west at north
Apr 25, 2025 · Apt 2J
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3c, 3rd story, 2nd apartment from east at south
Apr 25, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood at floor in the kitchen located at apt 8c, 8th story, 3rd apartment from east at south
Apr 25, 2025 · Apt 8C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3c, 3rd story, 2nd apartment from east at south
Apr 25, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2j, 2nd story, 2nd apartment from west at north
Apr 25, 2025 · Apt 2J
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door (stairway a) at public hall, 6th story
Apr 22, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet cover (broken) at west wall in the foyer located at apt 8d, 8th story, 3rd apartment from east at south
Apr 4, 2025 · Apt 8D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt 8d, 8th story, 3rd apartment from east at south
Apr 4, 2025 · Apt 8D
Closed — Violation dismissed
DOB building violations · 32
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 1, 2020
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed
Show 22 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations · 50
- Class - 1
Sec. 3314.4.8 failure to maintain scaffold as per code subsection. at time of inspection on an active jobsite,observed scaffold erected approx 90 feet in height at exp#1&2. scaffold is missing guardrails,toeboa
Jun 1, 2020 · Penalty $2,500
Resolve - Class - 2
Sec. 3301.13.1 inadequate site safety plan. at time of inspection on an active jobsite observed 2 suspended scaffolds in use w/4 outriggers installed at exp#3. site safety plan does not indicate suspended scaff
Jun 1, 2020 · Penalty $620
Resolve - Class - 1
Built contrary to approved plan. all equipement must be installed as per approved plans. at time of inspection on an active jobsite,observed suspended scaffolding in use at exp#3 that is contrary to design. non
Jun 1, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chapter 33.noted at time of my inspection of a new 8 story building construction in rporgress i asked if i would inspect the supported scaffold log b
Apr 28, 2020 · Penalty $1,250
Resolve - Class - 2
Temporary construction equipment onsite expired permit noted at time of my inspection of a new 8 story building, building topped of construction in progress i observed in teh d.o.b. rfecords during my inspectio
Apr 28, 2020
Resolve - Class - 1
Bc3303.7.2=fire extinguisher not adeqautely maintained noted at time of my inspection of a new 8 stroy building ,building topped off cosntruction in progress i observed the fire extinguishers and not received m
Apr 28, 2020 · Penalty $2,500
Resolve - Class - 2
Vertical safety netting.at the time of inspection on an active job site currently at roof level essential job for affordable housing i observed that netting around pipe scaffold at exposure 1 not properly enclo
Apr 15, 2020 · Penalty $620
Resolve - Class - 1
3303.4.2=dumpster comntainer:at the time of my inspection of a 8 story building i observed in the street a dumpster container at exposure #1 full of construction debris building materials above the limit i also
Feb 18, 2020 · Penalty $625
Resolve - Class - 1
3307.4-materials storage on the street at the time of inspection of an active jobsite of a 8 story new buidling i observed container stored in the street close to teh pedestrian walkway on the street i also obs
Feb 18, 2020 · Penalty $625
Resolve - Class - 1
3303.12.2 failed to have hoist in state of rediness as per code @timeof inspection on an active 8 sty nb construction notice that the building was @the 8th floor slab & contractor failed to provide building
Oct 29, 2019 · Penalty $2,500
Resolve
Show 40 more ↓
- Class - 1
Failure to safeguard all person & property affected by const operations- inadequate fence @time of inspection on active 8 sty nb construction site notice @exp#3 of the site that the construction fence was missi
Oct 29, 2019 · Penalty $10,000
Resolve - Class - 1
Failed to have stand pipe in state of readiness as per code. @time of inspection on an active 8 sty nb construction site, notice that the bldg was 2the 8th floor slab cmu wall & contractor fail to provide stand
Oct 29, 2019 · Penalty $5,000
Resolve - Class - 1
Failed to have stand pipe in state of readiness as per code. @time of inspection on an active 8 sty nb construction site, notice that the building was @the 8th floor slab working on 8th floor cmu wall 2nd
Oct 29, 2019 · Penalty $2,500
Resolve - Class - 1
Work w/o a permit @time of inspection on an active 8 sty nb construction site, notice a supported scaffold in the elevator shaft when request was made for permit for the more than 40' scaffold, superintendent
Oct 29, 2019 · Penalty $2,500
Resolve - Class - 1
Bc 3309.10 failure to maintain roof protection @time of inspection on an active 8 sty nb const site, notice work going on @exp#2&3 in which workers were stroing material on adjcent roof w/o protection also
Oct 29, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to provide approved const documents @job site @time of inspection-shed @time of inspection on an active 8sty nb const site when request was made for drawings, for side work shed i was inform by super
Oct 29, 2019 · Penalty $312
Resolve - Class - 2
Failure to provide approved const documents @jobsite @time inspection-fence @time of inspection on an active 8 sty nb construction site, when request was made for drawings for const fence, i was inform by super
Oct 29, 2019 · Penalty $312
Resolve - Class - 1
Const superintendent dailed to perform duties as per rule @time of inspection on an 8 sty nb bonst site, notice hazardous conditions throughout the site that the super (which have been on this site for more
Oct 29, 2019
Resolve - Class - 1
Failure to communicate required information to workers during pre-shift safety meeting @time of inspection on an active 8 sty nb const site,when super was ask if pre-shift safety eeting @time of inspection on
Oct 29, 2019 · Penalty $5,000
Resolve - Class - 2
Failure to maintain housekeeping @time of inspection on an active 8 sty nb const site, notice a great deal of debris/garage on site throughout the const site, debris in which can be a true hazard workers inspec
Oct 29, 2019 · Penalty $625
Resolve - Class - 1
Bc 3301.2 failure to maintain a control access zone on site @time of inspec on an active 8sty nb const site notice @exp#3, of building a setback the 2nd floor where workers were laying cmu block this set back
Oct 29, 2019
Resolve - Class - 1
Work does not conform to approved const documents and/or approved amendments.-ssp @time of inspection on an active 8 sty nb construction site, notice on the site safety plan on site that was given to inspector
Oct 29, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment-no guard rails. @time of inspection on an active 8 sty nb const site, notice throughout the site inadequatelty/missing guard rails on the 8th & 7th floor contract
Oct 29, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide handrails in stairways. at time of inspection on anactive construction jobsite of 8 story nb,i observed no handrails in any of the stairways. handrails should've been installed as constructio
Sep 27, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard uncapped rebar. at time of inspection of active construction jobsite of 8 story nb,i observed uncapped rebar on top floor of building where men were working. remedy:comply w/ code ensure re
Sep 27, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to safeguard all workers/persons. at time of inspection of active construction jobsite,of 8 story nb,i observed on floor no guardrail protection around the perimeter of the top of the building,where wor
Sep 27, 2019 · Penalty $2,500
Resolve - Class - 1
Missing guard rails @time of inspection on an active const site 8 sty new building, notice on the 2nd floor inside the building @exp#1&2 that there where missing/inadeqaute guard rails @these exposure's
Jul 11, 2019 · Penalty $2,500
Resolve - Class - 1
3314.1 failure to build/maintain supported scaffold as per code @time of inspection on an active 8 sty new building notice supported scaffold on the 1st floor expo#2 inside & 2nd floor throughout the site, that
Jul 11, 2019 · Penalty $2,500
Resolve - Class - 1
Unlawfully converted to work while on notice of a stop work order. @the time of my inspection of a 8 sty nb building on/2f the 2nd floor lvl, i observed that the whole 2nd floor was completed with work being
Jul 11, 2019 · Penalty $5,000
Resolve - Class - 2
Failure to safegaurd all persons and property affected by const operations @time of inspection on an active 8 sty new building notice concrete operation in progress @exp#1 of const sit where there were no flag
Jul 11, 2019 · Penalty $5,000
Resolve - Class - 1
Superintendent failed to perform duties as per rule.at time of inspection on an active 8 storied nb,noticed hazardous/dangerous conditions throughout the site(1)working against a stop work order(2)failure to sa
Jul 11, 2019 · Penalty $10,000
Resolve - Class - 1
No aprove shed plan on site @time of inspection on an active 8 sty, new building, notice sidewalk shed @exp#1 was inadequate an not build according to plans on site was not approve as is require by the commis
Jul 11, 2019 · Penalty $1,250
Resolve - Class - 1
Missing rebar cap/covers @time of inspection on an active 8 sty new building, notice on the 2nd floor of the const site a great deal of rebar unprotected w/o rebar caps throuhout the const site on the 2nd floor
Jul 11, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to maintain adequate house keeping on site. @time of inspection on an active 8 sty new building notice throughout the 2nd floor of the const site garbage and debris that is required to be maintained &
Jul 11, 2019
Resolve - Class - 1
Failure to designate and/or have a construction superintendent/or competent person present on site as required. at the time of my inspectionon an active job site i requested to seespeak to the superintendent of
May 7, 2019 · Penalty $10,030
Resolve - Class - 2
Failure to comply with dot regulations. at the time of my inspection on an active job site. i observed at exp1 on the street permit holder, as work was in progress failed to comply with dot regulatios by provid
May 7, 2019 · Penalty $1,280
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations (failed to provide secondary means of egress. at the time of my inspection on an active jobsite i observed that the permit holde
May 7, 2019 · Penalty $10,030
Resolve - Class - 1
Temporary platform (no design drawings). at the time of my inspection on an active jobsite, i observed at ex4 a temporary platform was builtfor worker to use for installing cmu's and accessing work area back an
May 7, 2019 · Penalty $2,530
Resolve - Class - 1
Superintendent log book (inadequate) at time of my inspection on an active jobsite, i requested to see the site's logbook from an individual on site who stated he was the competent person on the site, after
May 7, 2019 · Penalty $10,000
Resolve - Class - 2
Work w/o a permit (fdny permit expired) as noted: at time of inspect ion site observed 2 acetylene storage cages placed with 2 acetylene cylinder and fdny permit has expried on 10/01/18 permit f0012511.rmdy:
Dec 5, 2018 · Penalty $625
Resolve - Class - 1
Bc3307.7.5 design of fence. note: at the time of my inspection of a 8 story building at excavation phase construction work in progress. i observed approx 150 ft of construction fence made of metal pole, lumberj
Aug 2, 2018 · Penalty $625
Resolve - Class - 1
Sec. 3309.9 weatherproofing integrity of adjoining bldgs. note: at thetime of my inspection of a 8 sty bldg at excavation phase constructionwork in progress. i observed approx 3 to 16 feet of soil remove at exp
Aug 2, 2018 · Penalty $2,500
Resolve - Class - 2
Bc3301.13.13 log. note: at the time of my inspection of a 8 story building at excavation phase construction work in progress. upon request for construction superintendent logs to verify compliance with code and
Aug 2, 2018
Resolve - Class - 1
Sec. 3309.16 monitoring plan. note: at the time of my inspection of a 8 sty bldg at excavation & s.o.e. phase construction work in progress.i observed excavation in progress at exp#2 & 4 on property line of adj
Aug 2, 2018 · Penalty $625
Resolve - Class - 1
Sec. 3304.7 adequate means of egress. note: at the time of my inspection of a 8 sty bldg at excavaton construction work in progress. i observed that there were no means of egress from cellar level of excavation
Aug 2, 2018 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents & or approvedamendments. note: at the time of my inspection of a 8 sty bldg at excation phase construction work in progress. i observed after review of
Aug 2, 2018 · Penalty $625
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments. note: at the time of my inspection of a 8 sty bldg at excavation phase construction work in progress. i observed piles installed
Aug 2, 2018 · Penalty $2,500
Resolve - Class - 1
Construction superintendent failed to perform duties per rule. the following hazardous conditions were observed and stop work order was issued to this construction site on this date (1) no monitoring plan for e
Aug 2, 2018 · Penalty $10,000
Resolve - Class - 1
Failure to provide protection at sides of excavation. note: at the time of my inspection of a 8 sty bldg at excavation phase construction work in progress. i observed that there were inadequate guardrail system
Aug 2, 2018 · Penalty $5,000
Resolve - Class - 1
Failure to notify the dept prior to the commencement of earthwork. note: at the time of inpspection of a 8 sty bldg at excavation phase construction work in progress.soil removal on going & welding for preparat
Aug 2, 2018 · Penalty $2,500
Resolve
Complaints
- Elevator
Maintenance
Oct 12, 2026 · Apt 6G
Close - Flooring/stairs
Floor
Oct 12, 2026 · Apt 6G
Close - Elevator
Maintenance
Sep 25, 2026 · Apt 6G
Close - Door/window
Door
Aug 22, 2026 · Apt ENTRAN
Close - Unsanitary condition
Garbage/recycling storage
Jul 17, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Jul 17, 2026 · Apt BLDG
Close - Door/window
Window pane
Jun 6, 2026 · Apt 6H
Close - Door/window
Window frame
Jun 6, 2026 · Apt 6H
Close - Unsanitary condition
Garbage/recycling storage
May 25, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 12, 2026 · Apt BLDG
Close
Show 40 more ↓
- Electric
No lighting
Apr 9, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 9, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 1, 2026 · Apt BLDG
Close - Electric
No lighting
Apr 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 18, 2026 · Apt 4J
Close - Plumbing
Basin/sink
Mar 12, 2026 · Apt 6A
Close - Plumbing
Bathtub/shower
Mar 12, 2026 · Apt 6A
Close - Unsanitary condition
Garbage/recycling storage
Mar 9, 2026 · Apt BLDG
Close - General
Cooking gas
Feb 18, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 6G
Close - Unsanitary condition
Garbage/recycling storage
Feb 7, 2026 · Apt 6G
Close - Unsanitary condition
Garbage/recycling storage
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt 6G
Close - Unsanitary condition
Garbage/recycling storage
Dec 15, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 15, 2025 · Apt BLDG
Close - Unsanitary condition
Sewage
Dec 6, 2025 · Apt 4J
Close - Door/window
Window frame
Nov 24, 2025 · Apt 6H
Close - Door/window
Window frame
Nov 24, 2025 · Apt 6H
Close - Door/window
Window frame
Nov 11, 2025 · Apt 3J
Close - Water leak
Slow leak
Nov 4, 2025 · Apt 5J
Close - Unsanitary condition
Garbage/recycling storage
Oct 2, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 11, 2025 · Apt BLDG
Close - Safety
Smoke detector
Aug 12, 2025 · Apt 6
Close - General
Ventilation system
Aug 12, 2025 · Apt 6
Close - Unsanitary condition
Garbage/recycling storage
Aug 11, 2025 · Apt 6G
Close - Unsanitary condition
Pests
Aug 11, 2025 · Apt 6G
Close - Unsanitary condition
Garbage/recycling storage
Aug 4, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 5, 2025 · Apt BLDG
Close - Door/window
Window frame
Jun 23, 2025 · Apt 6H
Close - Heat/hot water
Apartment only
Jan 14, 2025 · Apt 6G
Close - Heat/hot water
Apartment only
Nov 20, 2024 · Apt 6G
Close - Heat/hot water
Apartment only
Nov 18, 2024 · Apt 6G
Close - Unsanitary condition
Garbage/recycling storage
Jul 10, 2024 · Apt 6G
Close - Flooring/stairs
Floor
Jul 10, 2024 · Apt 6G
Close - Unsanitary condition
Sewage
Jun 18, 2024 · Apt 5G
Close - Plumbing
Toilet
Jun 7, 2024 · Apt 5J
Close - Unsanitary condition
Pests
Dec 1, 2023 · Apt 6G
Close - Unsanitary condition
Garbage/recycling storage
Dec 1, 2023 · Apt 6G
Close - Unsanitary condition
Garbage/recycling storage
Dec 1, 2023 · Apt 6G
Close - Plumbing
Bathtub/shower
Aug 13, 2023 · Apt 6G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2018
- Floors
- 8
- Residential units
- 65
- Building area
- 56,205 ft²
- Lot area
- 10,000 ft²
- Zoning
- C4-3
- Community board
- 301
- Council district
- 34
- Block / lot
- 3127 / 7501
- Assessed value
- $8,201,675
- Landmark / historic district
- No
HPD registration #389658, last renewed Jul 24, 2025.
Questions about 40 Debevoise Street
Who owns 40 Debevoise Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 40 Debevoise Street have violations?
Yes. NYC HPD has recorded 87 housing violations at this property.
Is 40 Debevoise Street rent stabilized?
NYC Department of Finance tax bills listed 65 rent-stabilized units here in 2024 (about 100% of its 65 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 40 Debevoise Street built?
City records list 2018 as the year it was built.
How many apartments are in 40 Debevoise Street?
It has 65 residential units and 67 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.