161 Meserole Street
Brooklyn, NY 11206BBL 3-03044-0032Map
Owner of record: 161 Meserole LLC
161 Meserole Street is a walk-up apartment building built in 1920 in Brooklyn, 11206. It has 8 residential units across 3 floors. The owner of record is 161 Meserole LLC. HPD has recorded 22 housing violations here, most recently on August 29, 2024. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 22
- DOB violations
- 12
- ECB violations
- 0
- HPD complaints
- 25
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 1b, 1st story, 1st apartment from west at north
Aug 29, 2024 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 1b, 1st story, 1st apartment from west at north
Aug 29, 2024 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Apr 5, 2023 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling (approx. 1 sq. ft.) [at upper level] in the 1st bathroom from east at south located at apt 1b, 1st story, 1st apartment from north at east
Apr 5, 2023 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Apr 5, 2023 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 1b upper level, 1st story, 1st apartment from north at east
Apr 5, 2023 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 1b upper level, 1st story, 1st apartment from north at east
Apr 5, 2023 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tile at east wall in the 1st bathroom from east at south located at apt 1b, 1st story, 1st apartment from north at east
Apr 5, 2023 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum allowable temperature of 130 degrees in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Apr 5, 2023 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective lock assembly at front entrance door to building , 1st story
Jan 28, 2020
Closed — Violation closed
Show 12 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 6, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 6, 2017
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story
Aug 6, 2017
Closed — Violation closed - BHazardous
Properly repair the broken or defective mechanical ventilation in the bathroom located at apt 1b lower level, 1st story, 1st apartment from west at north
Aug 1, 2017 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 1b, 1st story, 1st apartment from west at north
Aug 1, 2017 · Apt 1B
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present.
Nov 29, 2015
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling and south wall in the 4th room from north located at apt 3rb, 3rd story, 1st apartment from north at east
Oct 11, 2015 · Apt 3RB
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 4th room from north located at apt 3rb, 3rd story, 1st apartment from north at east
Oct 11, 2015 · Apt 3RB
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ceiling light fixtures at ceiling in the kitchen located at apt 3rb, 3rd story, 1st apartment from north at east
Oct 11, 2015 · Apt 3RB
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration spiral stair case leading up to roof access door in the kitchen located at apt 3rb, 3rd story, 1st apartment from north at east
Oct 11, 2015 · Apt 3RB
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Oct 3, 2015
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots and house hold items 2nd and 3rd story balcony fire escape front of building
Jun 2, 2012
Closed — Violation closed
DOB building violations · 12
- Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 25, 1991
Dob violation - dismissed
Show 2 more ↓
- Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Slow leak
Aug 20, 2024 · Apt 1B
Close - Flooring/stairs
Floor
Aug 20, 2024 · Apt 1B
Close - Flooring/stairs
Floor
Aug 20, 2024 · Apt 1B
Close - Water leak
Heavy flow
Sep 13, 2022 · Apt 1B
Close - Water leak
Heavy flow
Sep 13, 2022 · Apt 1B
Close - Water leak
Slow leak
Oct 7, 2019 · Apt 1F
Close - Water leak
Heavy flow
Jan 16, 2018 · Apt 3LB
Close - Electric
No lighting
Jan 12, 2018 · Apt 3LB
Close - Electric
Outlet/switch
Jan 12, 2018 · Apt 3LB
Close - Heat/hot water
Apartment only
Jan 4, 2018 · Apt 3LB
Close
Show 15 more ↓
- Water leak
Heavy flow
Jan 4, 2018 · Apt 3LB
Close - Water leak
Heavy flow
Jul 27, 2017 · Apt 1B
Close - Unsanitary condition
Mold
Jul 27, 2017 · Apt 1B
Close - General
Ventilation system
Jul 27, 2017 · Apt 1B
Close - Water leak
Slow leak
Jul 27, 2017 · Apt 1B
Close - Water leak
Heavy flow
Sep 30, 2015 · Apt 3RB
Close - Paint/plaster
Wall
Sep 30, 2015 · Apt 3RB
Close - Paint/plaster
Ceiling
Sep 30, 2015 · Apt 3RB
Close - Paint/plaster
Wall
Sep 30, 2015 · Apt 3RB
Close - Water leak
Slow leak
Sep 10, 2015 · Apt 3RB
Close - Water leak
Heavy flow
Aug 21, 2015 · Apt 3RB
Close - Plumbing
Bathtub/shower
Aug 21, 2015 · Apt 3RB
Close - Plumbing
Basin/sink
Aug 21, 2015 · Apt 3RB
Close - Unsanitary condition
Mold
Aug 21, 2015 · Apt 3RB
Close - General
Fire-escape
May 29, 2012 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 3
- Residential units
- 8
- Building area
- 7,500 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 3044 / 32
- Assessed value
- $1,041,750
- Landmark / historic district
- No
HPD registration #382970, last renewed Jul 30, 2026.
Questions about 161 Meserole Street
Who owns 161 Meserole Street?
The owner of record in NYC Department of City Planning PLUTO data is 161 Meserole LLC.
Does 161 Meserole Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 161 Meserole Street rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 161 Meserole Street built?
City records list 1920 as the year it was built.
How many apartments are in 161 Meserole Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.