949 Metropolitan Avenue
Brooklyn, NY 11211BBL 3-02913-0061Map
Owner of record: Metropolitan Terrace LLC
949 Metropolitan Avenue is a walk-up apartment building built in 1920 in Brooklyn, 11211. It has 8 residential units across 4 floors. The owner of record is Metropolitan Terrace LLC. HPD has recorded 51 housing violations here, most recently on March 1, 2022. City tax records listed 6 rent-stabilized apartments here in 2021.
- HPD violations
- 51
- DOB violations
- 5
- ECB violations
- 1
- HPD complaints
- 65
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 51
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at fire escape, building rear yard.
Jun 13, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Apr 6, 2020
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the radiator at public hall, 1st story
Apr 6, 2020
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Feb 16, 2020 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts of fire escape all stories at rear yard at fire escape
Feb 16, 2020
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing raditor at public hall, 2nd story
Feb 16, 2020
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical light fixture at vistibule ceiling at public hall, 1st story
Feb 16, 2020
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
Feb 16, 2020
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator at public hall, 2nd story
Feb 12, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
Dec 4, 2019
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Dec 4, 2019
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
Dec 4, 2019
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator at public hall, 2nd story
Dec 4, 2019
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Apr 25, 2019 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Apr 25, 2019 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the bathroom , the 3rd room from north, the kitchen located at apt 1l, 1st story, 1st apartment from south at west
Apr 25, 2019 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... 4 sq.ft at north wall in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
Apr 17, 2019 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Apr 17, 2019 · Apt 1L
Closed — Violation closed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Apr 17, 2019 · Apt 1L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Apr 17, 2019 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Apr 17, 2019 · Apt 1L
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 18, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 3rd room from north located at apt 1l, 1st story, 1st apartment from south at west
Sep 22, 2018 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 3rd room from north located at apt 1l, 1st story, 1st apartment from south at west
Sep 22, 2018 · Apt 1L
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 20, 2018
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of bedbugs located at apt 1l, 1st story, 1st apartment from south at west
Sep 20, 2018 · Apt 1L
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice located at apt 1l, 1st story, 1st apartment from south at west
Sep 20, 2018 · Apt 1L
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches located at apt 1l, 1st story, 1st apartment from south at west
Sep 20, 2018 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective lock and assembly at bldg entrance door , 1st story
Sep 20, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 20, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 20, 2018
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 3l, 3rd story, 1st apartment from south at west
Dec 20, 2017 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective bathtub glazing in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Dec 20, 2017 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 3l, 3rd story, 1st apartment from south at west
Dec 20, 2017 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Dec 20, 2017 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 20, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Dec 20, 2017
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Dec 20, 2017
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Dec 20, 2017 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 21, 2017
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 21, 2017
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of no support bracket at air conditioning unit at building front , 4th story
Jul 20, 2017
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of no support bracket at air conditioning unit at building front , 2nd story
Jul 20, 2017
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing on wall at public hall, 1st story
Dec 5, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 16, 2016
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
May 20, 2016 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north and east walls in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
May 20, 2016 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
May 20, 2016 · Apt 3R
Closed — Violation dismissed
DOB building violations · 5
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
Work w/o permit.noted:in front of building at exp #1 erected scaffolding aprox 48 ft in height (8 sections high)no permits on file.bc3314.2 states scaffolds over 40 ft in height require permits.remedy:obtain al
Feb 2, 2023
Resolve
Complaints
- Unsanitary condition
Pests
May 2, 2026 · Apt 102
Close - Unsanitary condition
Pests
Feb 7, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Feb 7, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Feb 7, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Feb 16, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2020 · Apt 3R
Close - Heat/hot water
Entire building
Feb 13, 2020 · Apt 1R
Close - Heat/hot water
Entire building
Dec 3, 2019 · Apt 3L
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Jul 26, 2019 · Apt BLDG
Close - Unsanitary condition
Pests
May 31, 2019 · Apt 3R
Close - Unsanitary condition
Pests
Aug 1, 2018 · Apt 1L
Close - Unsanitary condition
Pests
Aug 1, 2018 · Apt 1L
Close - Unsanitary condition
Pests
Aug 1, 2018 · Apt 1L
Close - Heat/hot water
Entire building
Jan 3, 2018 · Apt 4L
Close - Heat/hot water
Entire building
Dec 18, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2017 · Apt 1L
Close - Heat/hot water
Entire building
Dec 18, 2017 · Apt BLDG
Close - Plumbing
Bathtub/shower
Dec 7, 2017 · Apt 3L
Close - Plumbing
Basin/sink
Dec 7, 2017 · Apt 3L
Close - Heat/hot water
Entire building
Jul 17, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 17, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 17, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 17, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 17, 2017 · Apt 1L
Close - Heat/hot water
Entire building
Mar 5, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2017 · Apt 1L
Close - Heat/hot water
Entire building
Feb 19, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2017 · Apt 4L
Close - Heat/hot water
Entire building
Feb 18, 2017 · Apt 1L
Close - Heat/hot water
Entire building
Feb 18, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 3, 2017 · Apt 1R
Close - Heat/hot water
Entire building
Jan 28, 2017 · Apt 8
Close - Heat/hot water
Entire building
Dec 8, 2016 · Apt 2L
Close - Heat/hot water
Entire building
Dec 8, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2016 · Apt 1R
Close - Heat/hot water
Entire building
Nov 21, 2016 · Apt 2L
Close - Heat/hot water
Entire building
Nov 15, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2016 · Apt 3L
Close - Heat/hot water
Apartment only
Nov 7, 2016 · Apt 1R
Close - Heat/hot water
Apartment only
Nov 5, 2016 · Apt 1R
Close - Heat/hot water
Entire building
Oct 31, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 29, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2016 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 4
- Residential units
- 8
- Building area
- 5,500 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 301
- Council district
- 34
- Block / lot
- 2913 / 61
- Assessed value
- $661,500
- Landmark / historic district
- No
HPD registration #326276, last renewed Aug 24, 2025.
Questions about 949 Metropolitan Avenue
Who owns 949 Metropolitan Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Metropolitan Terrace LLC.
Does 949 Metropolitan Avenue have violations?
Yes. NYC HPD has recorded 51 housing violations at this property.
Is 949 Metropolitan Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2021 (about 75% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 949 Metropolitan Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 949 Metropolitan Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.