110 Calyer Street
Brooklyn, NY 11222BBL 3-02593-0019Map
Owner of record: 110 Calyer Street LLC
110 Calyer Street is a walk-up apartment building built in 1928 in Brooklyn, 11222. It has 8 residential units across 4 floors. The owner of record is 110 Calyer Street LLC. HPD has recorded 134 housing violations here, most recently on May 4, 2026. 10 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 134
- DOB violations
- 10
- ECB violations
- 0
- HPD complaints
- 117
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 134
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Aug 13, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 13, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 13, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Aug 13, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall
Aug 13, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Aug 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook with eye installed at vestibule door at public hall, 1st story
Dec 14, 2022
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 5th room from north located at apt 2l, 2nd story, 1st apartment from east at south
Sep 4, 2021 · Apt 2L
Open — Not complied with - ANon-hazardous
Properly repair the broken or defective intercom from building entrance to west wall in the private hallway located at apt 2l, 2nd story, 1st apartment from east at south
Sep 4, 2021 · Apt 2L
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Replace with new the broken or defective ceramic wash basin in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Sep 4, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north walll in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Sep 4, 2021 · Apt 2L
Open — Not complied with - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at light fixtures at ceiling in the 4th room from north located at apt 2l, 2nd story, 1st apartment from east at south
Sep 4, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jun 2, 2021 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all wall in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jun 2, 2021 · Apt 2L
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor throughout in the foyer located at apt 2l, 2nd story, 1st apartment from north at east
Jun 2, 2021 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor throughout in the 1st room from east located at apt 2l, 2nd story, 1st apartment from east at south
Jun 2, 2021 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor throughout in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from east at south
Jun 2, 2021 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor throughout in the 3rd room from east located at apt 2l, 2nd story, 1st apartment from east at south
Jun 2, 2021 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor throughout in the private hallway located at apt 2l, 2nd story
Jun 2, 2021 · Apt 2L
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective cabinet at wash basin in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jun 2, 2021 · Apt 2L
Closed — Violation dismissed - BHazardous
Remove the illegal fastening padlock at door leading to cellar at public hall, 1st story
Jun 2, 2021
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance at lower sash window in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
Jun 2, 2021 · Apt 2L
Open — Not complied with - BHazardous
Replace with new the broken or defective glass pane at lower sash window in the 1st room from east located at apt 2l, 2nd story, 1st apartment from north at east
Jun 2, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical light fixture at ceiling in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from north at east
Jun 2, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Replace with new the missing escutcheon plate at heat riser in the kitchen located at apt 2l, 2nd story
Jun 2, 2021 · Apt 2L
Open — Not complied with - BHazardous
Properly repair the broken or defective counter balance at uper sash window in the 4th room from east located at apt 2l, 2nd story, 1st apartment from east at south
Jun 2, 2021 · Apt 2L
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 4th private hallway from east located at apt 2l, 2nd story, 1st apartment from east at south
Jun 2, 2021 · Apt 2L
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 4th room from north located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Properly secure the loose light fixture at ceiling in the 4th room from north located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at washbasin in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors in the entrance located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective the subfloor in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Replace the broken or defective washbasin in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Open — Not complied with - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling in the 1st room from north located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass pane at north wall window lower sash in the 1st room from north located at apt 2l, 2nd story, 1st apartment from north at east
May 25, 2021 · Apt 2L
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system .. at cellar
Apr 30, 2018
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Apr 30, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective at entrance to apartment located at apt 3r, 3rd story, 1st apartment from south at west
Apr 30, 2018 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system .. at cellar
Apr 22, 2018
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Apr 22, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective at entrance to apartment located at apt 3r, 3rd story, 1st apartment from south at west
Apr 22, 2018 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the broken or defective corroded metal flap doors leading to cellar at building front
Mar 14, 2018
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors at building entrance , 1st story
Mar 14, 2018
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the ceiling in the bathroom located at apt 2l, 2nd story, apartment at east
Feb 27, 2018 · Apt 2L
Closed — Violation closed
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Feb 2, 2025 · Apt 2L
Close - Heat/hot water
Apartment only
Dec 10, 2022 · Apt 2L
Close - Paint/plaster
Wall
Nov 18, 2021 · Apt 2L
Close - General
Cabinet
Nov 18, 2021 · Apt 2L
Close - Paint/plaster
Window/frame
Nov 18, 2021 · Apt 2L
Close - Plumbing
Bathtub/shower
Nov 18, 2021 · Apt 2L
Close - Plumbing
Basin/sink
Nov 18, 2021 · Apt 2L
Close - General
Ventilation system
Nov 18, 2021 · Apt 2L
Close - Paint/plaster
Radiator
Nov 18, 2021 · Apt 2L
Close - Flooring/stairs
Floor
Nov 18, 2021 · Apt 2L
Close
Show 40 more ↓
- Door/window
Window frame
Nov 18, 2021 · Apt 2L
Close - Paint/plaster
Ceiling
Sep 2, 2021 · Apt 2L
Close - Door/window
Window pane
Sep 2, 2021 · Apt 2L
Close - Flooring/stairs
Floor
Sep 2, 2021 · Apt 2L
Close - Appliance
Electric/gas range
Sep 2, 2021 · Apt 2L
Close - Water leak
Slow leak
Sep 2, 2021 · Apt 2L
Close - Electric
Outlet/switch
Sep 2, 2021 · Apt 2L
Close - Plumbing
Basin/sink
Sep 2, 2021 · Apt 2L
Close - Electric
No lighting
Sep 2, 2021 · Apt 2L
Close - General
Bell/buzzer/intercom
Sep 2, 2021 · Apt 2L
Close - Paint/plaster
Wall
Sep 2, 2021 · Apt 2L
Close - Paint/plaster
Ceiling
May 20, 2021 · Apt 2L
Close - Paint/plaster
Wall
May 20, 2021 · Apt 2L
Close - Electric
Wiring
May 20, 2021 · Apt 2L
Close - Flooring/stairs
Floor
May 20, 2021 · Apt 2L
Close - Electric
No lighting
May 20, 2021 · Apt 2L
Close - Paint/plaster
Wall
May 20, 2021 · Apt 2L
Close - Door/window
Window pane
May 20, 2021 · Apt 2L
Close - General
Bell/buzzer/intercom
May 20, 2021 · Apt 2L
Close - Plumbing
Basin/sink
May 20, 2021 · Apt 2L
Close - Door/window
Window frame
May 20, 2021 · Apt 2L
Close - Door/window
Window frame
May 20, 2021 · Apt 2L
Close - Flooring/stairs
Floor
May 20, 2021 · Apt 2L
Close - Flooring/stairs
Floor
May 20, 2021 · Apt 2L
Close - Heat/hot water
Entire building
Dec 18, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2020 · Apt 1L
Close - Heat/hot water
Apartment only
Dec 18, 2020 · Apt 2L
Close - Heat/hot water
Entire building
Dec 18, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2020 · Apt 1L
Close - General
Signage missing
Jul 16, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 16, 2018 · Apt BLDG
Close - Electric
Power outage
Jul 16, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 12, 2018 · Apt BLDG
Close - General
Signage missing
May 3, 2018 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
May 3, 2018 · Apt 1R
Close - Heat/hot water
Entire building
May 3, 2018 · Apt 1R
Close - Heat/hot water
Entire building
Apr 30, 2018 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Apr 20, 2018 · Apt BLDG
Close - Door/window
Window frame
Apr 20, 2018 · Apt APT2L
Close - Heat/hot water
Entire building
Apr 20, 2018 · Apt APT2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1928
- Floors
- 4
- Residential units
- 8
- Building area
- 7,258 ft²
- Lot area
- 2,800 ft²
- Zoning
- M1-1
- Community board
- 301
- Council district
- 33
- Block / lot
- 2593 / 19
- Assessed value
- $2,389,950
- Landmark / historic district
- No
HPD registration #335844, last renewed Jul 29, 2026.
Questions about 110 Calyer Street
Who owns 110 Calyer Street?
The owner of record in NYC Department of City Planning PLUTO data is 110 Calyer Street LLC.
Does 110 Calyer Street have violations?
Yes. NYC HPD has recorded 134 housing violations at this property.
Is 110 Calyer Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 25% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 110 Calyer Street built?
City records list 1928 as the year it was built.
How many apartments are in 110 Calyer Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.