roofy

110 Calyer Street

Brooklyn, NY 11222BBL 3-02593-0019Map

Owner of record: 110 Calyer Street LLC

110 Calyer Street is a walk-up apartment building built in 1928 in Brooklyn, 11222. It has 8 residential units across 4 floors. The owner of record is 110 Calyer Street LLC. HPD has recorded 134 housing violations here, most recently on May 4, 2026. 10 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.

HPD violations
134
DOB violations
10
ECB violations
0
HPD complaints
117

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
2
About 25% of the building's 8 apartments
Down from 8 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 134

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Aug 13, 2025

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 13, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 13, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Aug 13, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall

    Aug 13, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Aug 13, 2025

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing hook with eye installed at vestibule door at public hall, 1st story

    Dec 14, 2022

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 5th room from north located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 4, 2021 · Apt 2L

    Open — Not complied with
  • A

    Properly repair the broken or defective intercom from building entrance to west wall in the private hallway located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 4, 2021 · Apt 2L

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Replace with new the broken or defective ceramic wash basin in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 4, 2021 · Apt 2L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north walll in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 4, 2021 · Apt 2L

    Open — Not complied with
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at light fixtures at ceiling in the 4th room from north located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 4, 2021 · Apt 2L

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Jun 2, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all wall in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Jun 2, 2021 · Apt 2L

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective wood floor throughout in the foyer located at apt 2l, 2nd story, 1st apartment from north at east

    Jun 2, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor throughout in the 1st room from east located at apt 2l, 2nd story, 1st apartment from east at south

    Jun 2, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor throughout in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from east at south

    Jun 2, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor throughout in the 3rd room from east located at apt 2l, 2nd story, 1st apartment from east at south

    Jun 2, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor throughout in the private hallway located at apt 2l, 2nd story

    Jun 2, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective cabinet at wash basin in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Jun 2, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Remove the illegal fastening padlock at door leading to cellar at public hall, 1st story

    Jun 2, 2021

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective counter balance at lower sash window in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east

    Jun 2, 2021 · Apt 2L

    Open — Not complied with
  • B

    Replace with new the broken or defective glass pane at lower sash window in the 1st room from east located at apt 2l, 2nd story, 1st apartment from north at east

    Jun 2, 2021 · Apt 2L

    Closed — Violation closed
  • B

    Properly repair the broken or defective electrical light fixture at ceiling in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from north at east

    Jun 2, 2021 · Apt 2L

    Closed — Violation closed
  • B

    Replace with new the missing escutcheon plate at heat riser in the kitchen located at apt 2l, 2nd story

    Jun 2, 2021 · Apt 2L

    Open — Not complied with
  • B

    Properly repair the broken or defective counter balance at uper sash window in the 4th room from east located at apt 2l, 2nd story, 1st apartment from east at south

    Jun 2, 2021 · Apt 2L

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 4th private hallway from east located at apt 2l, 2nd story, 1st apartment from east at south

    Jun 2, 2021 · Apt 2L

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 4th room from north located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Closed — Violation closed
  • B

    Properly secure the loose light fixture at ceiling in the 4th room from north located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Closed — Violation closed
  • C

    Provide adequate supply of hot water for the fixtures at washbasin in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Closed — Violation closed
  • C

    Code: arrange and make self-closing the doors in the entrance located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective the subfloor in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Closed — Violation closed
  • B

    Replace the broken or defective washbasin in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Open — Not complied with
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling in the 1st room from north located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Closed — Violation closed
  • B

    Replace with new the broken or defective glass pane at north wall window lower sash in the 1st room from north located at apt 2l, 2nd story, 1st apartment from north at east

    May 25, 2021 · Apt 2L

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 7, 2021

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system .. at cellar

    Apr 30, 2018

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Apr 30, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Replace or repair the self-closing doors that is missing or defective at entrance to apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Apr 30, 2018 · Apt 3R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system .. at cellar

    Apr 22, 2018

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Apr 22, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Replace or repair the self-closing doors that is missing or defective at entrance to apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Apr 22, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair the broken or defective corroded metal flap doors leading to cellar at building front

    Mar 14, 2018

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors at building entrance , 1st story

    Mar 14, 2018

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the ceiling in the bathroom located at apt 2l, 2nd story, apartment at east

    Feb 27, 2018 · Apt 2L

    Closed — Violation closed

DOB building violations · 10

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Feb 2, 2025 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2022 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Nov 18, 2021 · Apt 2L

    Close
  • General

    Cabinet

    Nov 18, 2021 · Apt 2L

    Close
  • Paint/plaster

    Window/frame

    Nov 18, 2021 · Apt 2L

    Close
  • Plumbing

    Bathtub/shower

    Nov 18, 2021 · Apt 2L

    Close
  • Plumbing

    Basin/sink

    Nov 18, 2021 · Apt 2L

    Close
  • General

    Ventilation system

    Nov 18, 2021 · Apt 2L

    Close
  • Paint/plaster

    Radiator

    Nov 18, 2021 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    Nov 18, 2021 · Apt 2L

    Close
Show 40 more ↓
  • Door/window

    Window frame

    Nov 18, 2021 · Apt 2L

    Close
  • Paint/plaster

    Ceiling

    Sep 2, 2021 · Apt 2L

    Close
  • Door/window

    Window pane

    Sep 2, 2021 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    Sep 2, 2021 · Apt 2L

    Close
  • Appliance

    Electric/gas range

    Sep 2, 2021 · Apt 2L

    Close
  • Water leak

    Slow leak

    Sep 2, 2021 · Apt 2L

    Close
  • Electric

    Outlet/switch

    Sep 2, 2021 · Apt 2L

    Close
  • Plumbing

    Basin/sink

    Sep 2, 2021 · Apt 2L

    Close
  • Electric

    No lighting

    Sep 2, 2021 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Sep 2, 2021 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Sep 2, 2021 · Apt 2L

    Close
  • Paint/plaster

    Ceiling

    May 20, 2021 · Apt 2L

    Close
  • Paint/plaster

    Wall

    May 20, 2021 · Apt 2L

    Close
  • Electric

    Wiring

    May 20, 2021 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    May 20, 2021 · Apt 2L

    Close
  • Electric

    No lighting

    May 20, 2021 · Apt 2L

    Close
  • Paint/plaster

    Wall

    May 20, 2021 · Apt 2L

    Close
  • Door/window

    Window pane

    May 20, 2021 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    May 20, 2021 · Apt 2L

    Close
  • Plumbing

    Basin/sink

    May 20, 2021 · Apt 2L

    Close
  • Door/window

    Window frame

    May 20, 2021 · Apt 2L

    Close
  • Door/window

    Window frame

    May 20, 2021 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    May 20, 2021 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    May 20, 2021 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2020 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    Dec 18, 2020 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2020 · Apt 1L

    Close
  • General

    Signage missing

    Jul 16, 2018 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 16, 2018 · Apt BLDG

    Close
  • Electric

    Power outage

    Jul 16, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 12, 2018 · Apt BLDG

    Close
  • General

    Signage missing

    May 3, 2018 · Apt 1R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 3, 2018 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    May 3, 2018 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Apr 30, 2018 · Apt 3R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 20, 2018 · Apt BLDG

    Close
  • Door/window

    Window frame

    Apr 20, 2018 · Apt APT2L

    Close
  • Heat/hot water

    Entire building

    Apr 20, 2018 · Apt APT2L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1928
Floors
4
Residential units
8
Building area
7,258 ft²
Lot area
2,800 ft²
Zoning
M1-1
Community board
301
Council district
33
Block / lot
2593 / 19
Assessed value
$2,389,950
Landmark / historic district
No

HPD registration #335844, last renewed Jul 29, 2026.

Questions about 110 Calyer Street

Who owns 110 Calyer Street?

The owner of record in NYC Department of City Planning PLUTO data is 110 Calyer Street LLC.

Does 110 Calyer Street have violations?

Yes. NYC HPD has recorded 134 housing violations at this property.

Is 110 Calyer Street rent stabilized?

NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 25% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 110 Calyer Street built?

City records list 1928 as the year it was built.

How many apartments are in 110 Calyer Street?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.