329 Broadway
Brooklyn, NY 11211BBL 3-02462-7502Map
Owner of record: The 329 LLC
329 Broadway is a condominium built in 2017 in Brooklyn, 11211. It has 63 residential units across 16 floors. The owner of record is The 329 LLC. HPD has recorded 5 housing violations here, most recently on January 27, 2024. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 5
- DOB violations
- 0
- ECB violations
- 46
- HPD complaints
- 15
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 603, 6th story, 1st apartment from south at west
Jan 27, 2024 · Apt 603
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked. at basement
Jan 27, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 46
- Class - 2
Where needed (2.11.11.7.5.). untagged buffer (1rcny 103-02). untagged governor (1rcny 103-02). maintenance log not up to date (8.6.1.4.).
Aug 10, 2026 · Penalty $625
Active - Class - 2
Replace worn gibs where needed (2.11.11.7.5.). untagged buffer (1rcny 103-02). untagged governor (1rcny 103-02). maintenance log not up to date (8.6.1.4.). key fobs prohibited for machine room entry (8.1.1.). t
Aug 10, 2026 · Penalty $625
Active - Class - 2
Conducted a site safety monitoring inspection for newly erected 16-story mixed use building. observed shattered window on the 2nd floor below commercial awning. referencing 2022 administrative code (section 28-
Oct 7, 2024 · Penalty $3,125
Active - Class - 1
Housekeeping-at time of inspection on an active 16 story nb job site iobserved large pules of combustible debris on site throughout and on many floors.fire extinguishers are all expired and not inspected creati
Jun 3, 2021 · Penalty $2,500
Resolve - Class - 2
Bc33108-site safety manangers and coordinators duties.the site safety manager or coordinator shall monitor compliance with the safety requirements of this chapter by performing the duties required by section 33
Jun 3, 2021 · Penalty $625
Resolve - Class - 1
Permit holder failed to ensure workers attended a pre-shift safety meeting prior to commencement of work.on an active 16 story nb job site observed approx.30-40 workers on site when asking the site safety manag
Jun 3, 2021 · Penalty $625
Resolve - Class - 1
Bc33011-fire code(fdny fc906)at time of inspection on an active 16 story nb job site i observed all fire extinguishers expired,missing tags and not hung.large piles of combustible debris observed throughout job
Jun 3, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to provide sws where required protection shall be provided forthose sidewalks in front of bldg to be const alt-stop all work on glass facade&on exp2-provided sws to protect personnel&public-note:@time o
May 12, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to comply w/manufacturers specs,all equipment shall be used inaccordance w/specs of manufacturer-stop all use of storage areas on exp1&2 comply to manufacturers specs of plastic yodick barricades-note:@
May 12, 2021 · Penalty $625
Resolve - Class - 1
Failure to have a site safety manager presence as required note:at thetime of my inspection of a 16 story bldg at bulkhead level construction work in progress.(electricity,paiinting,povers on roof)upon request
May 11, 2021 · Penalty $10,000
Resolve
Show 36 more ↓
- Class - 1
Unlawfully to continue to work contrary to stop work order.at time of inspection on an active 16 story bldg,observed between expo.#2 & #3 that the facade was fully completed & also the suspended scaffold was re
May 11, 2021 · Penalty $5,000
Resolve - Class - 1
Housekeeping.at time of inspection on an active job site observed inadequate housekeeping consisting of large amounts of debris stored & scattered throughout entire site materials,debris,tools laying on floor
May 11, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to designate and/or have site safety manager or site safety coordinator present at site as required. at the time of my inspection ofa new building 16 story project,upon reviewing in the bis ssm samuel l
Dec 8, 2020 · Penalty $12,500
Resolve - Class - 2
Bc3314.1 non code compliant bc3314.1 supported scaffold.at time of inspection observed of active permitted construction site of new bldg 16 story the supported scaffold in place at expo.#1-3 non code compliant
Dec 3, 2020 · Penalty $625
Resolve - Class - 1
Failed to file evidence of compliance with workers comp. law and/or disability benefits at the time of inspection on an active job site currently at roof level with about 80 workers on site consisting of multip
Dec 1, 2020 · Penalty $625
Resolve - Class - 1
Work contrary to approved/amended plans. at the time of my inspection,16 story nb at roof level,active site. observed outriggers/susp scaffold in placed and in used at expos#3,above adj roof. provided cd-5 and
Jun 18, 2020 · Penalty $6,250
Resolve - Class - 1
Work contrary to drawings. at the time of inspection of a 16 sty new bldg under construction i observed scaffold installed at exp#3 on overhead protect site conditions amendment not show on drawing provided.
May 7, 2020 · Penalty $6,250
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no handrails. at time of inspection at an active jobsite nb 16-story mixed use building,it was observed from the 4th fl to the 9
Oct 2, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements:at time of inspection at an active jobsite nb 16-story mixed use building,it was observed at various floors throughout the building inadequate
Oct 2, 2019 · Penalty $2,500
Resolve - Class - 1
Bc 3303.7.2 fire extinguishers not maintained in accordance w/ nyc fire code. at time of inspection at an active jobsite nb-16 story mixed use building,it was observed at various floors throughout the jobsite.
Oct 2, 2019 · Penalty $2,500
Resolve - Class - 1
Material storage at the leading edge. at time of inspection on an active site of a 16 story nb currently pouring the roof of 16 the 16 storyi observed improper material storage consisting of construction materi
Aug 7, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain/institute safety measure during construction operations-no ohp for ingress&egress into site. at time of inspection on anactive site of a 16 story nb,i observed that ingress/egress leading in
Aug 7, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to maintain housekeeping. at time of inspection on an active site of a 16 story nb,currently pouring the roof the 16 story,i observed that throughout the entire site,at various locations,there were larg
Aug 7, 2019 · Penalty $2,500
Resolve - Class - 1
Bc 3309.1 failure to protect adjoining properties-no roof protection. at time of inspection on an active job site of a 16 story new buildingobserved no roof protection on exp.3,w/ section that is covered w/ whi
Aug 7, 2019 · Penalty $2,500
Resolve - Class - 1
Bc 3308.5.1 inadequate vertical netting-large opening. at time of inspection on an active jobsite of a 16-story new building observed piecesof cement on the edge of the building on the outside of vertical netti
Aug 7, 2019 · Penalty $2,500
Resolve - Class - 1
Bc 3305.3.6 no shoring straps to secure reshores. at time of inspection on an active job site of a 16 story new building observed reshores within 10' of an unclosed perimeter of a building shall be secured to p
Aug 7, 2019 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents and/or amendments-ssp. at time of inspection on an active site of a 16 story nb,observed missing 4' fence on barricades at exposure 2,pedestrian walkway,
Aug 7, 2019 · Penalty $2,500
Resolve - Class - 1
Bc 3308.6.1.1 failure to maintain horizontal nets. at time of inspection on an active site of a 16 story nb currently pouring the roof of the 16 story i observed:horizontal nets at 13 story which is 3 story bel
Aug 7, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard. note:at time of my inspection of a 16 story building at super structure phase w/ no construction activity going on,i observed an unlocked,ajar metal door accessible to the 19380 sq footage
Jun 22, 2019 · Penalty $10,000
Resolve - Class - 1
Sec. 3303.3 watch person note: at the time of my inspection of a 16 sty bldg at super structure phase. i observed an unlocked ajar metal door that allowed easy accessability to the construction site. when i ent
Jun 22, 2019 · Penalty $2,500
Resolve - Class - 1
Work contrary to site safety plan 16 story new buidling 14 story level at the time of my inspection i observed jersey (water) barriers in place around th ejobsite street area that was not contingous not filed w
Jun 18, 2019 · Penalty $1,250
Resolve - Class - 1
Work w/o a permit. a time of inspection on a active jobsite under a alt-2,at 14 sty superstructure phase,upon reviewing the dept records fornb permit. permit no issued & jobsite being constructed in conjuction
Mar 11, 2019
Resolve - Class - 1
Sec. 3303.8 standpipe not in state of readiness. at time of inspectionon a active jobsite of a 16 sty bldg,currently forming 14 sty upon reviewing approved plans standpipe not installed as per approved plans
Mar 11, 2019 · Penalty $625
Resolve - Class - 1
Sec. 3305.3.2.1 design drawings for concrete formwork. at time of inspection on a active jobsite of a 16 sty bldg,currently forming 14 sty,it was observed at multiple locations concrete formwork,build out of
Mar 11, 2019
Resolve - Class - 1
Failure to provide osha training at time of inspection on a active jobsite of a 16 sty bldg,curretly forming 14 sty,upon request for osha training worker manuel j mordcho provided a photocopy of a osha card,not
Mar 11, 2019
Resolve - Class - 1
Sec. 3309.14 failure to provide window protection. at time of inspection on active jobsite of a 16 sty bldg,currently forming 14 sty,it was observed that adjacent property at exp#3 windows were full of debris
Mar 11, 2019
Resolve - Class - 1
Sec. 3303.14.1 standing water 3 inches or more. at time of inspection on a active jobsite of a 16 sty bldg,curretly forming 14 sty,it was observed standing water at sub cellar on a large area approx 24 feet by
Mar 11, 2019
Resolve - Class - 1
Sec.3 3305.6.1.2 reshores on the leading edge. at time of inspection on a active jobsite of a 16 sty bldg,currently forming 14 sty,it was observed that reshores at exp#3&4 on the leading edge were not secured
Mar 11, 2019
Resolve - Class - 1
Sec. 1704.1.2 tr2 special inspection/inadequate record keeping/field logs at time of inspection on a active jobsite under alt2 permit,& jobsite of a 16 sty bldg currently forming 14 floor,upon reviewing the dep
Mar 11, 2019 · Penalty $625
Resolve - Class - 1
Failure to perform successful hydrostatic pressure test of standpipe system. at time of inspection on a active jobsite of a 16 sty nbldg currently forming at 14 sty bldg,upon request to see hydrostatic tested
Mar 11, 2019 · Penalty $625
Resolve - Class - 1
Sec. 3304.3 failure to maintain housekeeping. at time of inspection ona active jobsite of a 16 sty bldg,currently forming 14 fl,it was observed from 8 fl & above that housekeeping was inadequate,large amounts
Mar 11, 2019
Resolve - Class - 1
Work does not conform to approved plans-spider crane. at time of inspection on a active jobsite of a 16 sty bldg,currently forming 14 sty,itwas observed spider crane on deck of 13 fl,loading material. spider cr
Mar 11, 2019
Resolve - Class - 1
Sec. 3301.12 pre-shift safety meetings-spider crane use. at time of inspection on a active jobsite of a 16 sty bldg,currently forming 14 styit was observed spider crane in use & installed contrary to approved
Mar 11, 2019
Resolve - Class - 1
Sec. 3310.8.2.1 notification of conditions to the dept-site safety manager duties. at time of inspection on a active jobsite of a 16 sty bldg,currently forming 14 sty,it was observed that 4 standpipes on jobsit
Mar 11, 2019
Resolve - Class - 1
Sec. 3310.4 site safety monitoring program. at time of inspection on aactive jobsite of a 16 sty bldg,currently forming a 14 sty under a alt2 not an nb permit,site safety monitor program not issued on nb permit
Mar 11, 2019 · Penalty $625
Resolve - Class - 1
Failure to provide osha training. at time of inspection on a active jobsite of a 16 sty bldg,currently forming 14 sty upon request osha training,worker adrian sanchez provided a 10hrs osha card that expiration
Mar 11, 2019
Resolve
Complaints
- Heat/hot water
Entire building
May 25, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2025 · Apt BLDG
Close - General
Ventilation system
Aug 1, 2024 · Apt 707
Close - General
Ventilation system
Jul 22, 2024 · Apt 707
Close - Water leak
Slow leak
Apr 3, 2024 · Apt 601
Close - Heat/hot water
Apartment only
Jan 26, 2024 · Apt 603
Close - Heat/hot water
Apartment only
Jan 18, 2024 · Apt UNIT60
Close - Heat/hot water
Apartment only
Jan 17, 2024 · Apt 603
Close - General
Signage missing
Jan 13, 2024 · Apt BLDG
Close
Show 5 more ↓
- Water leak
Slow leak
Jan 9, 2024 · Apt 601
Close - Water leak
Heavy flow
Jun 5, 2023 · Apt LOBBY
Close - Heat/hot water
Entire building
Sep 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 23, 2021 · Apt BLDG
Close - Heating
Heat related
Feb 19, 2012 · Apt 4D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2017
- Floors
- 16
- Residential units
- 63
- Building area
- 125,995 ft²
- Lot area
- 12,600 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2462 / 7502
- Assessed value
- $13,791,601
- Landmark / historic district
- No
HPD registration #390034, last renewed Aug 25, 2025.
Questions about 329 Broadway
Who owns 329 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is The 329 LLC.
Does 329 Broadway have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 329 Broadway rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 30% of its 63 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 329 Broadway built?
City records list 2017 as the year it was built.
How many apartments are in 329 Broadway?
It has 63 residential units and 68 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.