319 Hooper Street
Brooklyn, NY 11211BBL 3-02450-0022Map
Owner of record: 319 Hooper LLC
319 Hooper Street is a walk-up apartment building built in 1925 in Brooklyn, 11211. It has 32 residential units across 6 floors. The owner of record is 319 Hooper LLC. HPD has recorded 268 housing violations here, most recently on October 7, 2026. 18 of the 50 most recent violations are still open. City tax records listed 32 rent-stabilized apartments here in 2024.
- HPD violations
- 268
- DOB violations
- 20
- ECB violations
- 27
- HPD complaints
- 373
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 268
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch
Oct 7, 2026
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2a, 1st story, 1st apartment from east at south
Oct 2, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 1st story, 1st apartment from east at south
Oct 2, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at south in the 3rd room from east at south located at apt 2a, 1st story, 1st apartment from east at south
Oct 2, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste pipe line at sink in the kitchen located at apt 2a, 1st story, 1st apartment from east at south
Oct 2, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2a, 1st story, 1st apartment from east at south
Oct 2, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at north wall in the bathroom located at apt 2a, 1st story, 1st apartment from east at south
Oct 2, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2a, 1st story, 1st apartment from east at south
Oct 2, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2a, 1st story, 1st apartment from east at south
Oct 2, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...hinge at fire door at bulkhead to the roof
Sep 29, 2026
Open — Violation will be reinspected
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 6th story, 1st apartment from north at east
Sep 29, 2026 · Apt 3F
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide an adequate supply of gas to the fixtures ...at range in the kitchen located at apt 3f, 6th story, 1st apartment from north at east
Sep 29, 2026 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...hinge at fire door at bulkhead to the roof
Sep 24, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures ...at range in the kitchen located at apt 3d, 4th story, 1st apartment from north at east
Sep 24, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures ...at range in the kitchen located at apt 3f, 6th story, 1st apartment from north at east
Sep 24, 2026 · Apt 3F
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate . in the kitchen located at apt 6c, 3rd story, 1st apartment from south at west
Apr 25, 2026 · Apt 6C
Closed — Violation closed - ANon-hazardous
Repair leaky water closet flush pipe connection . in the bathroom located at apt 6c, 3rd story, 1st apartment from south at west
Apr 25, 2026 · Apt 6C
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of openable dumbwaiter at the east wall at public hall, 2nd story
Mar 21, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with doors attached at public hall, 1st story
Mar 21, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of oven at public hall, 5th story
Mar 21, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of openable dumbwaiter door at the east wall at public hall, 3rd story
Mar 21, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6c, 3rd story, 1st apartment from south at west
Mar 21, 2026 · Apt 6C
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective water supply pipe at water closet in the bathroom located at apt 6c, 3rd story, 1st apartment from south at west
Mar 21, 2026 · Apt 6C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1c, 3rd story, 1st apartment from west at north
Sep 19, 2025 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom system at building front to return buzzer at west wall in the entrance located at apt 1c, 3rd story, 1st apartment from west at north
Sep 19, 2025 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule at public hall, 1st story
Jul 27, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flowerpots at east stack at fire escape, 6th story
Jul 27, 2025
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south and north walls in the bathroom located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south and west walls in the 3rd room from north located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet flush handle in the bathroom located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective counter balance at upper and lower sash window at west wall in the 3rd room from north located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from north located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Remove the illegal fastening hasp and eye capable of being padlocked at door in the 3rd room from north located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of door with key operated lock preventing entrance to fire escape in the 3rd room from north located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4c, 3rd story, 1st apartment from east at south
Jul 21, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of furniture and household items at public hall, 1st story
Jun 20, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Jun 20, 2025
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies and members at north fire escape
Jun 2, 2025
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies and members at west fire escape
Jun 2, 2025
Closed — Violation dismissed - BHazardous
Properly secure the loose light fixture at ceiling at public hall, 1st story
May 30, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 6c, 3rd story, 1st apartment from south at west
May 22, 2025 · Apt 6C
Closed — Violation closed - ANon-hazardous
Replace the broken or defective at wash basin in the bathroom located at apt 3d, 4th story, 1st apartment from north at east
May 21, 2025 · Apt 3D
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 3d, 4th story, 1st apartment from north at east
May 21, 2025 · Apt 3D
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at closet at east wall in the private hallway located at apt 3d, 4th story, 1st apartment from north at east
May 21, 2025 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3d, 4th story, 1st apartment from north at east
May 21, 2025 · Apt 3D
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair or replace the broken or defective locking assembly in the entrance located at apt 6c, 3rd story, 1st apartment from west at north
May 21, 2025 · Apt 6C
Closed — Violation dismissed
DOB building violations · 20
- Construction other optional
Failure to comply w/commissioner's order: dob violation #062921cllfa01 jm required the immediate 100% hands on inspection of all facades by a pe/ra & submit report inspection report submitted to facade unit via email by 6/29/21. as of today 6/27/26 no hands on inspection report submitted. remedy:comply with dob violation #062921cllfa immediately
Jun 17, 2026
Dob violation - active - Construction other optional
Failure to comply w/commissioner's order:dob violation102821cllfa021lj required the immediate 100% hands on inspection of all facades by nys lic pe/ra & submit report to facades via email by 10/28/21. as of 6/17/26 no inspection report submitted to facades unit. remedy: comply with dob violation# 102821cclfa02lj immediately
Jun 17, 2026
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Immediate emergency anythingoptional
Provide approximately 23 linear feet of sidewalk shed protection.for exp#1 including building entrance at 362 south 4th street, brooklyn
Dec 13, 2021
Dob violation - dismissed - Construction other optional
Emergency work order due to leaning parapet wall located at exp 4, northeast corder. remedy: take and provide safety measures to secure main entrance of neighboring building 362 s 4th st under nys lic prof engineer's directions
Oct 28, 2021
Dob violation - active - Construction other optional
Ftm exterior building facade and appurtenances. observed defective masonry work at all exposures and leaning parapet wall at exp 4, north elevation. remedy: owner immed retain a nys lic prof to perform 100% hands on inspection at all exposures to determine safety of same cause of failure. provide proposal to dept of blgs by 11/29/2021
Oct 28, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 29, 2021
Dob violation - dismissed
Show 10 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 4, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 4, 2021
Dob violation - dismissed - Construction other optional
Observed unsafe conditions at exp 4 north el: severely cracked brick masonry on parapet wall at north east facing. leaning parapet wall with vertical crack. exp 1 east el: step cracks at multiple locations damaged windows lintell/sill. exp 2, s el:vertical cracks/damaged masonry. remedy: owner to immed retain nys prof to peform hands on ins
Jun 29, 2021
Dob violation - active - Construction other optional
Emergency work order due to unsafe conditions at exp 4 north el: severely cracked brick masonry on parapet wall at n-e facing. leaning/ vertical crack paraper wall. exp 1 east el: step cracks at multiple locations. damaged windows lintel/sill, exp 2 s el: vertical cracks/ damage masonry. remedy: take and provide safety measures to secure pub
Jun 29, 2021
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 27
- Class - 1
Failure to provide unobstructed exit passageway through the fire escape as per mdl sec #53.8(c) and bc 1029.5.1. noted: at exp #1(hooper st)and exp #4(south 4 street) having windows ac units ad flower pot protr
Sep 14, 2026 · Penalty $6,250
Active - Class - 1
Failure to maintain building wall(s) or appurtenances. noted at time of inspection at exposures one and four on multiple floors window ac units have been installed without the required support creating a fail h
Mar 16, 2026 · Penalty $5,000
Resolve - Class - 1
Bc 1029.5.1. failure to provide unobstructed fire escape access as permdl sec #53.8(c). noted at exposures one on hooper street and four on south fourth street at multiple points window ac units protruding into
Mar 16, 2026 · Penalty $2,500
Resolve - Class - 1
Unlawful acts. failure to comply with commissioner's order. note: dob102821llfa02lj requires the owner to immediately retain a nys licensed professional to perform 100% hands on inspection at all exposures to d
May 21, 2024
Resolve - Class - 2
Failure to maintain building ib code-compliant manner. at time of inspection observed exp. 1 hooper ave. damaged stucco, panel spalling, at multiple locations. remedy: repair and/or replace.
May 21, 2024 · Penalty $625
Resolve - Class - 2
Time of inspection observed an erected sidewalk shed at the buildings exposure 1, 4. upon review of departmental records which revealed the temporary construction equipment the sidewalk shed permit expired on 7
May 5, 2023
Resolve - Class - 2
Time of inspection observed an erected sidewalk shed at the buildings exposure 1, 4. failure to maintain the height of horizontal bracing, installed less than 8 feet at the crosswalk. at the north west corner o
May 5, 2023 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner note:atoi observed@exp1e elevation:damaged masonry work@multiple locations.exp2s elevation&exp3w elevation:damaged stucco@multiple locations.exp4n elevation:step
Feb 8, 2022 · Penalty $625
Resolve - Class - 1
Unlawful acts,failure to comply with commissioner's order.note:on 09/16/2021 violations#35588954z and 35588953r were issued to repair damaged facade and provide adequate safety measures to protect tenants and n
Dec 10, 2021
Resolve - Class - 1
Unlawful acts,failure to comply with commissioner's order note:on 09/16/2021 violation#35588954z and 35588953r were issued to repair damagedfacade and provide adequate safety measures to protect the public and
Oct 28, 2021
Resolve
Show 17 more ↓
- Class - 1
Failure to provide adequate safety measures/sidewalk shed where required.note:at the time of inspection observed that no sidewalk shed in place as safety measures to protect tenants/public from unsafe condition
Sep 16, 2021
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #35582271m issued 7/2/21 and to file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain building in co
Sep 16, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior bldg facade & appurtenances.note:at the time of inspection observed defective brick/masonry work at all exposures,such as:cracks/step cracks,spalling,bulged bricks,at various locat
Sep 16, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to provide adequate safety measures.sidewalk shed where required note at the time of my inspection observed defects at the exterior facade wall consisting of cracksat stucco and partial seperation
Aug 4, 2021 · Penalty $6,250
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances note at the time of my inspection observed exp #1 east elevation step cracked brick maonsry on multiple floors cracked window sills @ exposure #4 n
Jul 23, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior bldg wall note:@exit1 front of bldg parapet wall apprix4-6'tall leaning into roof.(illegible) installed approx5" out of plumb (illegible) @exp4 on s11st side@exp3 sign of deteriorat
Jul 2, 2021 · Penalty $625
Resolve - Class - 1
Failure to maintain exterior bldg facade & appurtenances.note:at the time of inspection observed at:exp.#1,east el:slanted-disconnected window grill on 1st fl/step cracked brick masonry at multiple locations/c
Jun 29, 2021 · Penalty $2,500
Resolve - Class - 1
Unlawful acts.failure to comply w/commissioner's order.note:ecb #35559759k issued on 05/14/2021 required the owner to repair damaged facade.as of today 06/29/2021 no work was done & no safety measures were prov
Jun 29, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to provide sidewalk shed where required note:at time of inspection observed that no sidewalk shed in place on exposure#1 east elevation and exposure#4 north elevation where various defective conditions
Jun 11, 2021
Resolve - Class - 1
Failure to maintain exterior bldg facade or appurtenances.note:atoi,observed@1)exp1,e elevation;slanted-disconnected window grill on 1fl.(i)step cracked brick-masonry on multiple fls.(ii)cracked window sill&con
May 14, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain exterior building wall.north and east parapet walls that are 4-6 high are leaning into roof.bracing previously installedlease is approx 5' out of plumb.remedy:obtain permits.provide protecti
May 13, 2021 · Penalty $1,250
Resolve - Class - 2
Work w/o a permit. work noted in apt 3e on he fifth flr doing major renovation insalling new water and waste lines for 3pc bathroom and residential sink,also installed new gas line for stove demos1 partition
Apr 22, 2015 · Penalty $400
Resolve - Class - 1
Failure to () unobstructed exit passageway. note of obstruction at 5thflr and obstructed with appliances and construction material storing or passageway out of apt 3e. at courtyard level on exit passagway gate
Apr 22, 2015 · Penalty $400
Resolve - Class - 1
Work w/o a permit observe in apt 5e disconnected ktcn sink and trap installed new water valves no permit issued on dob files at time of insp rem: obtain permit or restore premises to prior legal condition
Feb 17, 2011
Resolve - Hazardous
Sidewalk shed does not meet bldg code specifications. the lights for the shed are not illuminated at 945 pm. remedy: provide proper illumination.
Jun 19, 2008 · Penalty $2,000
Resolve - Non-hazardous
B4b/51 50a50b/3b 50c50d/50e50f 50g50h/50i50j 50k50l/34b 7a 50a- carbonmenoxide and fumes 121 ppm 50b burner excessive smoke and soot 50c holes in boiler room walls 50d boiler room not storage room 50e remove
Dec 30, 2005 · Penalty $800
Active - Non-hazardous
B4a 49 remove waste oil from boiler room.mixing valve leaking,pipe hot water relief valve down.
Aug 21, 2002
Resolve
Complaints
- Unsanitary condition
Pests
Oct 15, 2026 · Apt 3F
Open - Appliance
Electric/gas range
Oct 15, 2026 · Apt 3F
Open - Appliance
Electric/gas range
Sep 30, 2026 · Apt 3F
Close - Unsanitary condition
Pests
Sep 30, 2026 · Apt 3F
Close - General
Cooking gas
Sep 30, 2026 · Apt 3F
Close - General
Cooking gas
Sep 26, 2026 · Apt 3D
Close - Unsanitary condition
Pests
Sep 25, 2026 · Apt 3F
Close - Door/window
Door
Sep 25, 2026 · Apt 3F
Close - General
Cooking gas
Sep 25, 2026 · Apt 3F
Close - Appliance
Electric/gas range
Sep 25, 2026 · Apt 3F
Close
Show 40 more ↓
- Appliance
Electric/gas range
Sep 22, 2026 · Apt 3F
Close - General
Cooking gas
Sep 22, 2026 · Apt 3F
Close - Water leak
Slow leak
Sep 10, 2026 · Apt 2A
Close - Plumbing
Bathtub/shower
Sep 10, 2026 · Apt 2A
Close - Door/window
Window pane
Sep 10, 2026 · Apt 2A
Close - Electric
Outlet/switch
Sep 10, 2026 · Apt 2A
Close - Door/window
Door
Sep 10, 2026 · Apt 2A
Close - Electric
Wiring
Sep 10, 2026 · Apt 2A
Close - Plumbing
Basin/sink
Sep 10, 2026 · Apt 2A
Close - Water leak
Heavy flow
Sep 8, 2026 · Apt 6C
Close - Unsanitary condition
Pests
Aug 31, 2026 · Apt 2F
Close - Door/window
Door
May 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2026 · Apt BLDG
Close - Plumbing
Toilet
Mar 23, 2026 · Apt 6C
Close - Heat/hot water
Apartment only
Mar 19, 2026 · Apt 5F
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 5F
Close - Paint/plaster
Radiator
Feb 13, 2026 · Apt 6B
Close - Paint/plaster
Wall
Feb 13, 2026 · Apt 6B
Close - Flooring/stairs
Floor
Feb 13, 2026 · Apt 6B
Close - Plumbing
Bathtub/shower
Feb 13, 2026 · Apt 6B
Close - Water leak
Heavy flow
Feb 13, 2026 · Apt 6B
Close - Plumbing
Basin/sink
Feb 13, 2026 · Apt 6B
Close - Plumbing
Bathtub/shower
Feb 13, 2026 · Apt 6B
Close - Flooring/stairs
Floor
Feb 13, 2026 · Apt 6B
Close - Door/window
Window frame
Feb 13, 2026 · Apt 6B
Close - Unsanitary condition
Mold
Feb 13, 2026 · Apt 6B
Close - Door/window
Door
Feb 13, 2026 · Apt 6B
Close - Plumbing
Basin/sink
Feb 13, 2026 · Apt 6B
Close - Flooring/stairs
Floor
Feb 13, 2026 · Apt 6B
Close - General
Cabinet
Feb 13, 2026 · Apt 6B
Close - Plumbing
Basin/sink
Feb 13, 2026 · Apt 6B
Close - Unsanitary condition
Pests
Feb 8, 2026 · Apt 2A
Close - Plumbing
Basin/sink
Feb 8, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Feb 8, 2026 · Apt 2A
Close - Paint/plaster
Wall
Feb 8, 2026 · Apt 2A
Close - Door/window
Door
Feb 8, 2026 · Apt 2A
Close - Electric
Lighting
Feb 8, 2026 · Apt 2A
Close - Door/window
Door
Jan 25, 2026 · Apt 6C
Close - Plumbing
Toilet
Jan 25, 2026 · Apt 6C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1925
- Floors
- 6
- Residential units
- 32
- Building area
- 23,292 ft²
- Lot area
- 4,700 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2450 / 22
- Assessed value
- $1,713,150
- Landmark / historic district
- No
HPD registration #304665, last renewed Aug 11, 2025.
Questions about 319 Hooper Street
Who owns 319 Hooper Street?
The owner of record in NYC Department of City Planning PLUTO data is 319 Hooper LLC.
Does 319 Hooper Street have violations?
Yes. NYC HPD has recorded 268 housing violations at this property.
Is 319 Hooper Street rent stabilized?
NYC Department of Finance tax bills listed 32 rent-stabilized units here in 2024 (about 100% of its 32 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 319 Hooper Street built?
City records list 1925 as the year it was built.
How many apartments are in 319 Hooper Street?
It has 32 residential units and 34 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.