331 Keap Street
Brooklyn, NY 11211BBL 3-02449-0016Map
Owner of record: 331 Keap, LLC
331 Keap Street is a walk-up apartment building built in 1915 in Brooklyn, 11211. It has 36 residential units across 6 floors. The owner of record is 331 Keap, LLC. HPD has recorded 251 housing violations here, most recently on October 2, 2026. 28 of the 50 most recent violations are still open. City tax records listed 13 rent-stabilized apartments here in 2024.
- HPD violations
- 251
- DOB violations
- 16
- ECB violations
- 19
- HPD complaints
- 370
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 251
- BHazardous
M/d law abate the nuisance consisting of key operated lock at entrance door leading to the fire escape. in the 1st room from east located at apt 19, 4th story, 1st apartment from east at south
Oct 2, 2026 · Apt 19
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, west wall in the 2nd room from east at south located at apt 19, 4th story, 1st apartment from east at south
Oct 2, 2026 · Apt 19
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 2nd room from east at south located at apt 19, 4th story, 1st apartment from east at south
Oct 2, 2026 · Apt 19
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the 2nd room from east at north, the kitchen , the bathroom located at apt 19, 4th story, 1st apartment from east at south
Oct 2, 2026 · Apt 19
Open — Nov sent out - BHazardous
Replace with new the missing closet door at the west wall in the 1st room from east located at apt 19, 4th story, 1st apartment from east at south
Oct 2, 2026 · Apt 19
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd stack from south at building front , 4th story
Jul 18, 2025
Open — Nov certified on time - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd stack from south at building front. , 6th story
Jul 18, 2025
Open — Nov certified on time - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at 2nd stack from south at building front at fire escape
Jul 18, 2025
Open — Nov certified on time - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protuding at least 6 inches out of the window at 2nd stack from south at building front. , 2nd story
Jul 18, 2025
Open — Nov certified on time
Show 40 more ↓
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots 2nd at stack from south at building front , 3rd story
Jul 18, 2025
Open — Nov certified on time - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of bottle crate at 2nd stack from south at building front , 5th story
Jul 18, 2025
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule at public hall, 1st story
Jul 18, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east located at apt 26, 5th story, 2nd apartment from north at east
Mar 17, 2025 · Apt 26
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 4th room from east located at apt 26, 5th story, 2nd apartment from north at east
Mar 17, 2025 · Apt 26
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of 5 bicycles at public hall, 1st story
Jan 27, 2021
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes (flower pots) on 4th, 5th story balcony north, building front at fire escape
Nov 9, 2020
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes protruding air conditioner at 3rd story balcony north, building front at fire escape
Nov 9, 2020
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical light fixture at ceiling in the 2nd room from north located at apt 30, 6th story, 1st apartment from south at west
Jul 28, 2020 · Apt 30
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 30, 6th story, 1st apartment from south at west
Jul 28, 2020 · Apt 30
Open — Civ14 mailed - BHazardous
Properly repair the broken or defective counter balance at lower sash window in the 2nd room from north located at apt 30, 6th story, 1st apartment from south at west
Jul 28, 2020 · Apt 30
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 30, 6th story, 1st apartment from south at west
Jul 28, 2020 · Apt 30
Open — Civ14 mailed - BHazardous
Properly repair the broken or defective top door hinge in the 1st room from north located at apt 30, 6th story, 1st apartment from south at west
Jul 28, 2020 · Apt 30
Closed — Violation dismissed - ANon-hazardous
Refit upper and lower sash window north wall in the 1st room from north located at apt 30, 6th story, 1st apartment from west at north
Jan 14, 2020 · Apt 30
Open — Civ14 mailed - CImmediately hazardous
Arrange and make self-closing the doors at front entrance located at apt 30, 6th story, 1st apartment from west at north
Jan 14, 2020 · Apt 30
Closed — Violation closed - ANon-hazardous
Properly secure the loose on/off knob at shower in the bathroom located at apt 30, 6th story, 1st apartment from west at north
Jan 14, 2020 · Apt 30
Open — Civ14 mailed - ANon-hazardous
Refit upper and lower sash east window north wall in the 1st room from north at west located at apt 30, 6th story, apartment at north
Jan 14, 2020 · Apt 30
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 30, 6th story, apartment at north
Jan 14, 2020 · Apt 30
Open — Civ14 mailed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than 4 inches on 2nd,3rd,4th,5th and 6 th story balconiesat east stack balconies at the front of the building at fire escape
Sep 11, 2019
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditionrt protruding more tnan 4 inches on 3rd,4th,and 5th story balconies at west stack balconies at the front of the building at fire escape
Sep 11, 2019
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing on wall at public hall, 1st story
Sep 10, 2019
Open — Nov certified on time - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing on wall at public hall, 1st story
Sep 10, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 10, 2019
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 10, 2019
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective lower sash at west wall window in the 4th room from east located at apt 30, 6th story, 1st apartment from south at west
Jul 22, 2019 · Apt 30
Closed — Violation closed - BHazardous
Remove the illegal fastening hasp and eye capable of being padlocked, obstructing egress from north fire escape ladder at building front yard
May 27, 2019
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of garbage receptacles obstructing safe landing of drop ladder at east fire escape at building front yard
May 27, 2019
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods north fire escape at building front
May 27, 2019
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of protruding air conditioner at 3rd story balcony, north stack at building front
May 27, 2019
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes wires at 6th story balcony rear of building north section
Feb 15, 2019
Open — Nov certified on time - BHazardous
Repair or replace the smoke detector missing located at apt 21, 4th story, apartment at east
Feb 7, 2019 · Apt 21
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..south wall in the 2nd room from north located at apt 21, 4th story, apartment at east
Feb 7, 2019 · Apt 21
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling in the 3rd room from north at east located at apt 21, 4th story, apartment at east
Feb 7, 2019 · Apt 21
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective wood header, north and south wood jambs at window in the 1st room from north at east located at apt 21, 4th story, apartment at east
Feb 7, 2019 · Apt 21
Open — Civ14 mailed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 21, 4th story, apartment at east
Feb 7, 2019 · Apt 21
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 3rd room from east at south located at apt 5, 2nd story, 1st apartment from south at west
Jan 30, 2019 · Apt 5
Open — Civ14 mailed
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Plumbing none
The dob intends to revoke all permits and approved under job #340097709 due to suspension of master plumber's license on all plumbing work. stop all work immediately
May 22, 2018
Dob violation - dismissed - Plumbing none
The dob intends to revoke all permits and approved under job #340068688 due to suspension of master plumber's license on all plumbing work. stop all work immediately
May 22, 2018
Dob violation - dismissed - Plumbing none
The dob intends to revoke all permits and approved under job #340155254 due to suspension of master plumber's license on all plumbing work. stop all work immediately
May 22, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2016
Dob violation - dismissed
Show 6 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 16, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 19
- Class - 2
Work does not conform to approved construction documents and/or approved amendments.premises under alt2 job#340155254 loc folder.@ time of inspection found:on apt#10 & 33 plan shows no combustible 12" dropanch
Oct 16, 2018 · Penalty $1,250
Active - Class - 2
Work does not conform to approved construction documents and/or approved amendments.premises under alt2 job#340234981 loc folder @ time of inspection found:(1) apt#1b plan shows ada(accessible) bathroom.found
Oct 16, 2018 · Penalty $1,250
Active - Class - 2
Work does not conform to approved construction documents and/or approved amendments.premises under alt2 job#340068688 loc folder.@ time of inspection found:on apt#20&16 plan shows electric stove found gas line
Oct 16, 2018 · Penalty $1,250
Active - Class - 2
Pedestrian protection does not meet code specification. note at time of inspection i observed sidewalk shed in place and not maintained.1- cross brace broken off bolt; 2-bulb not in working condition.rmdy:
Oct 13, 2016 · Penalty $400
Resolve - Class - 2
Temporary construction equipment on site, expired permit. noted: @ time of insp side walk shed on exp#1 of bldg w/ expired permit# 340201855expired on 11/06/16. rem: renew permit.
Jun 10, 2016
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at roof excessive cables and wires creating tripping hazards. rmdy: repair and/or replace.¦
Jan 20, 2016 · Penalty $500
Resolve - Class - 2
Unapproved/unsafe/unsuitable electrical equip or wiring in use.note:flexible cord use as permanent wiring in apt. #22 cord used from ceiling fixture to wall switch.rem:comply w/ec code.
Jan 20, 2016 · Penalty $400
Resolve - Class - 1
File a certificate form application etc. containing a material false statements under job application permit #340248930 issued 4/17/15 expiring on 4/16/16. pw1 is check marked"no"for"rent control/stabilization"
Jan 20, 2016 · Penalty $4,800
Resolve - Class - 2
Electrical work w/o permit.note:obs newly installed circuit breaker panel installed in apt. #15.no application on file for new circuit breaker panel.rem:obtain permit.
Jan 20, 2016 · Penalty $400
Resolve - Class - 2
Work w/o a permit. noted: in apartments 3 and 25 installed new wooden floor joists for apartments above. in apt 25, existing floor joists has been cut and spliced with new joists. rmdy: obtain permit and provid
Aug 26, 2015 · Penalty $800
Resolve
Show 9 more ↓
- Class - 1
Failure to safeguard all persons and property affected by constructionoperations.noted: job #340280895 tenant protection plan does not indicate removal of fire stopping in apt 3 and 25. at time of inspection
Aug 26, 2015 · Penalty $1,000
Resolve - Class - 1
Work no permit. over scope of appl #340280895 observed on 8/26/15 @11am level. cell/bst and 1st flr apt3 installing 6"stack 3"vent and assocfitting,causing flooding in cell /bst not part of appl as per const/do
Aug 26, 2015 · Penalty $1,600
Resolve - Class - 2
Failure to maintain bldg in code complaint manner. failure to maintainboiler federal #1. no anual inspection conducted yr 2015 last inspt(8/6/13)per boiler b/s info. remedy: maintain boiler at time of inspectio
Aug 26, 2015
Resolve - Class - 2
Electrical work without a permit.on 8/26/15 at 10:45 i observed:new branch circuit wiring,fixtures,switches, receptacles,risers & electricalpanel,in apt. 1b,8,25,35.13 sets of 4/3 bx riser in basement.gut remov
Aug 26, 2015 · Penalty $400
Resolve - Class - 1
Failure to maintain building in code compliant manner. noted: at frontand rear fire escape is obstructed with ac unit creating a tripping h azard.right side public exit passageway is obstructed with constructio
Aug 26, 2015 · Penalty $1,000
Resolve - Class - 2
Failure to provide approved/accepted lans at job stie at time of inspection.noted:no plans for work at public hallway walls/ceiling. rmdy: stop all work. provide approved plan entire job and public hallway wal
Sep 13, 2014 · Penalty $2,500
Resolve - Class - 2
17041.1,stop all work note pursuant to section 28-207.2 of admin code of city of new york you are hereby ordered to immediately stop all work @ above premise.failure to file a special insp statement of respnsib
Jun 9, 2014 · Penalty $4,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway. excessive accumulation of garbage including buckets,mirrors,plastic bags,wood panels,glass shards & wood is being stored below fire escape ladder at 1st fl rear
Apr 17, 2009 · Penalty $1,200
Resolve - Class - 1
Work w/o permit work noted store and store front illegally converted into class a apt at 1st fl at front left side with store front replaced with new exterior brick wall (front facade) 12lx14h with 2 windows
Apr 2, 2009 · Penalty $1,600
Resolve
Complaints
- General
Cabinet
Sep 15, 2026 · Apt 19
Close - Paint/plaster
Ceiling
Sep 15, 2026 · Apt 19
Close - Water leak
Heavy flow
Sep 15, 2026 · Apt 19
Close - General
Janitor/super
Sep 15, 2026 · Apt 19
Close - Door/window
Door
Sep 15, 2026 · Apt 19
Close - Paint/plaster
Wall
Sep 15, 2026 · Apt 19
Close - Plumbing
Basin/sink
Aug 24, 2026 · Apt 26
Close - Plumbing
Bathtub/shower
Aug 24, 2026 · Apt 26
Close - Plumbing
Toilet
Aug 24, 2026 · Apt 26
Close - Door/window
Door
May 31, 2026 · Apt 35
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 7, 2026 · Apt 16
Close - Heat/hot water
Entire building
Dec 23, 2025 · Apt 16
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt 16
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 14
Close - Heat/hot water
Entire building
Nov 2, 2025 · Apt 16
Close - Heat/hot water
Apartment only
Nov 2, 2025 · Apt 14
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 25, 2025 · Apt 21
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt 16
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt 16
Close - Heat/hot water
Entire building
Oct 15, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 2, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 29, 2025 · Apt 16
Close - Unsanitary condition
Garbage/recycling storage
Aug 26, 2025 · Apt BLDG
Close - Door/window
Door frame
Jul 8, 2025 · Apt 5
Close - Electric
No lighting
Jul 8, 2025 · Apt 5
Close - Electric
Power outage
Jun 27, 2025 · Apt 15
Close - Heat/hot water
Entire building
Jun 16, 2025 · Apt 14
Close - Unsanitary condition
Garbage/recycling storage
Mar 18, 2025 · Apt 1A
Close - Paint/plaster
Ceiling
Mar 17, 2025 · Apt 26
Close - Paint/plaster
Ceiling
Mar 17, 2025 · Apt 26
Close - Unsanitary condition
Mold
Mar 17, 2025 · Apt 26
Close - Door/window
Door
Jan 20, 2025 · Apt 5
Close - Heat/hot water
Entire building
Jan 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 1, 2023 · Apt 20
Close - Plumbing
Water supply
Nov 10, 2023 · Apt 30
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Door/window
Door
May 2, 2022 · Apt 5
Close - Heat/hot water
Apartment only
Apr 12, 2021 · Apt 30
Close - Heat/hot water
Entire building
Jan 25, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Jan 24, 2021 · Apt 30
Close - Heat/hot water
Apartment only
Nov 2, 2020 · Apt 6
Close - Plumbing
Bathtub/shower
Jul 24, 2020 · Apt 30
Close - Door/window
Window frame
Jul 24, 2020 · Apt 30
Close - Electric
Power outage
Jul 24, 2020 · Apt 30
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1915
- Floors
- 6
- Residential units
- 36
- Building area
- 21,740 ft²
- Lot area
- 5,451 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2449 / 16
- Assessed value
- $2,265,300
- Landmark / historic district
- No
HPD registration #334601, last renewed Nov 13, 2025.
Questions about 331 Keap Street
Who owns 331 Keap Street?
The owner of record in NYC Department of City Planning PLUTO data is 331 Keap, LLC.
Does 331 Keap Street have violations?
Yes. NYC HPD has recorded 251 housing violations at this property.
Is 331 Keap Street rent stabilized?
NYC Department of Finance tax bills listed 13 rent-stabilized units here in 2024 (about 36% of its 36 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 331 Keap Street built?
City records list 1915 as the year it was built.
How many apartments are in 331 Keap Street?
It has 36 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.