376 Bedford Avenue
Brooklyn, NY 11249BBL 3-02443-0029Map
Owner of record: Achdus
376 Bedford Avenue is an elevator apartment building built in 1880 in Brooklyn, 11249. It has 7 residential units across 5 floors. The owner of record is Achdus. HPD has recorded 18 housing violations here, most recently on August 1, 2015. City tax records listed 7 rent-stabilized apartments here in 2021.
- HPD violations
- 18
- DOB violations
- 7
- ECB violations
- 19
- HPD complaints
- 10
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at 1st window from east at head jamb at window at south wall in the bathroom located at apt 1, 2nd story, 1st apartment from north at east
Aug 1, 2015 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from north at east
Aug 1, 2015 · Apt 1
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .... located at apt 1, 2nd story, 1st apartment from north at east
Aug 1, 2015 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 1, 2nd story, 1st apartment from north at east
Aug 1, 2015 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings 2nd story apt. #2 throughout.
May 10, 2004
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling throu-out 2nd story apt.
May 10, 2004
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective top sash glass 2nd story apt. #2 south east room north window.
Oct 24, 2003
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls 2nd story apt. #2 bathroom.
Oct 24, 2003
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of exposed wires ceiling light fixture 2nd story apt. #2 bathroom.
Oct 24, 2003
Closed — Violation dismissed - BHazardous
Replace with new the missing waste pipe connection wash basin 2nd story apt. #2 bathroom.
Oct 24, 2003
Closed — Violation dismissed
Show 8 more ↓
- ANon-hazardous
Replace with new the broken or defective parting strips and stop beads 2nd story apt. #2 south east room north window.
Oct 24, 2003
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls kitchen 2nd story apt.
Oct 24, 2003
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection waste line under wash basin bathroom 2nd story apt.
Oct 24, 2003
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective glass top sash south room window 2nd story apt.
Oct 24, 2003
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection waste line under sink kitchen 2nd story apt.
Oct 24, 2003
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective electrical ceiling light bathroom 2nd story apt.
Oct 24, 2003
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective wood facia at inner side of south room window 2nd story apt.
Oct 24, 2003
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin roaches and mice throu-out 2nd story apt.
Oct 24, 2003
Closed — Violation dismissed
DOB building violations · 7
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 28, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 28, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 28, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 6, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 15, 1991
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Apr 1, 1990
Dob violation - dismissed
ECB violations · 19
- Class - 2
Failure to comply with grading requirements (pc1101.1). uneven sidewalk (apprx. 3 feet grade difference) with slopes on both sides created at exposure#1 causing storm water to improper run off. observed water p
Aug 28, 2020
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments-structural drawing. at time of inspection at an active jobsite alt-1 for vertical enlargement to existing building,it was obse
Oct 3, 2019 · Penalty $625
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements:at time of inspection at an active jobsite alt-1 for vertical enlargementof existing building,it was observed inadequate housekeeping on variou
Oct 3, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain a record of orientations performed at worksite.at the time of inspection of an active jobsite where a proposed 5 story building was in development i observed when requested of the site manag
Aug 21, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3301.6/design,sizes and capacities of materials structures temporaryconstruction and equipment shall be in accordance with the requirements of sections 3301.6.1 through 3301.6.3.at the time of inspection of a
Aug 21, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to safeguard persons property;a time of inspection of an active jobsite i observed a boom truck on the street actively picking matterial(sheetrock/wallboard)onto the 5th floor jobsite.simultaneously,veh
Aug 21, 2019 · Penalty $5,000
Resolve - Class - 1
Prohibited outdoor advertising company sign on sidewalk shed or construction fence. at time of inspection i observed proposed enlargement ofexisting 3 story building w/ no work activity currently present. i als
May 15, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35235912r issued on 04/02/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for work w/o a permit. remedy: comply w/
Mar 11, 2018 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35235912r issued on 04/02/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o permit,installed hot water line,gas line at 2nd &
Jan 17, 2018 · Penalty $2,400
Resolve - Class - 1
Failur eto ocmply w/the comm;s order contained in summons/vio #35235912r issued on 04/02/17 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.for work w/out a permit.@apt 2 & 3 installed boiler
Dec 6, 2017 · Penalty $6,000
Resolve
Show 9 more ↓
- Class - 1
Failure to comply with the commissioners order contaiined in summons/violation #35235912r issued on 4/02/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a perm
Nov 3, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35235912r issued on 04/02/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file
Sep 11, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35235912r issued on 4-02-17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no permits filed for hvac system for commercial space & for vent
Jul 16, 2017 · Penalty $2,400
Resolve - Class - 1
Work no permit-observed on 2&3 floors installed new boiler & hot water heater combo units in apt 2&3 w/gas,water,venting piping no dob permit on file for work & hvac unit on 1st comm space. remedy: obtain a per
Apr 2, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to have new or altered plumbing systems tested in stalled boiler/hot water heaters in apt 2&3 hvac in commercial/space on 1st fl. noinspections on file for equipment,gas lines,water & venting lines.
Apr 2, 2017 · Penalty $1,000
Resolve - Class - 1
Sec. 406.6.2.1 observed on floors 1,2,3 gas units on & working for heat/hot water gas not certified by dob for use. remedy: perform inspection & certify uses.
Apr 2, 2017 · Penalty $1,600
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35213460h issued on 11/19/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit @ exp#3. remedy: comply w/comm's order &
Mar 11, 2017 · Penalty $400
Resolve - Class - 1
Failure to maintain bldg. noted: at rear of bldg found existing fire escape w/a smal section of guardrail semi-detached from bldg structure & also observed another small section of guardrail removed to accommod
Dec 6, 2016 · Penalty $250
Resolve - Class - 1
Work w/o permit. noted: at time of inspection observed at exp#3 there has been a deck approx 12'by 20' built at 3rd fl w/o a dept issued permit. deck built using combustoble material. remedy: comply w/code obta
Nov 19, 2016 · Penalty $800
Resolve
Complaints
- General
Ventilation system
Jun 14, 2026 · Apt 4F
Close - General
Bell/buzzer/intercom
Jun 14, 2026 · Apt 4F
Close - Electric
Power outage
Jun 14, 2026 · Apt 4F
Close - Appliance
Electric/gas range
Jun 14, 2026 · Apt 4F
Close - Heat/hot water
Apartment only
Mar 4, 2023 · Apt 5F
Close - Water leak
Heavy flow
Jul 27, 2015 · Apt 1
Close - Unsanitary condition
Mold
Jul 27, 2015 · Apt 1
Close - Paint/plaster
Ceiling
Jul 27, 2015 · Apt 1
Close - General
Mailbox
Oct 10, 2014 · Apt 2
Close - Heating
Heat related
Jan 18, 2007 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1880
- Floors
- 5
- Residential units
- 7
- Building area
- 7,559 ft²
- Lot area
- 2,722 ft²
- Zoning
- M1-2/R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2443 / 29
- Assessed value
- $1,336,050
- Landmark / historic district
- No
HPD registration #813970, last renewed Aug 12, 2025.
Questions about 376 Bedford Avenue
Who owns 376 Bedford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Achdus.
Does 376 Bedford Avenue have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 376 Bedford Avenue rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2021 (about 100% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 376 Bedford Avenue built?
City records list 1880 as the year it was built.
How many apartments are in 376 Bedford Avenue?
It has 7 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.