273 Lee Avenue
Brooklyn, NY 11206BBL 3-02264-0003Map
Owner of record: 273 Lee Ave LLC
273 Lee Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11206. It has 8 residential units across 4 floors. The owner of record is 273 Lee Ave LLC. HPD has recorded 364 housing violations here, most recently on May 5, 2026. 23 of the 50 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 364
- DOB violations
- 20
- ECB violations
- 17
- HPD complaints
- 871
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 364
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of rubbish and household items, all stories public hall
Nov 1, 2023
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of rubbish and household items blocking access to scuttle ladder at 4th story public hall.
Nov 1, 2023
Open — Nov sent out - CImmediately hazardous
Make safe by properly repairing the structural defect rotted wood ceiling joists at 1st story.
Nov 1, 2023
Open — Nov sent out - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the excessive debris obstructing safe landing of drop ladder at rear yard.
Nov 1, 2023
Open — Nov sent out - CImmediately hazardous
Make safe by properly repairing the structural defect rotted wood ceiling joists (approx. 3 beams) at cellar rear.
Nov 1, 2023
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective paving approx. 4 feet deep excavated hole in pavement cellar throughout.
Nov 1, 2023
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of no electricity at all stories, public hall v#.16361733
Nov 1, 2023
Open — Nov sent out - CImmediately hazardous
Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): fire guard required for entire premises due to no lighting all stories public hall. v#.16361729 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.
Nov 1, 2023
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and east wall at public hall, 4th story
Nov 1, 2023
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective fire retardant material around skylight at public hall, 4th story
Nov 1, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 4th story
Nov 1, 2023
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures primary means of egress in total darkness trip hazard at public hall stairs
Nov 1, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 2l, 2nd story, 1st apartment from west at north
Oct 13, 2023 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). deffective in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Feb 16, 2023 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Feb 16, 2023 · Apt 3L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector deffective in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Feb 16, 2023 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Feb 16, 2023 · Apt 3L
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 12, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of free-standing radiator stored at public hall, 3rd story
Sep 12, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3l, 3rd story, 1st apartment from west at north
Aug 2, 2022 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective door frame in the entrance located at apt 3l, 3rd story, 1st apartment from west at north
Aug 2, 2022 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective mortise lock in the entrance located at apt 3l, 3rd story, 1st apartment from west at north
Aug 2, 2022 · Apt 3L
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling 2 square feet in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north original violation 15095022 issued 04-apr-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 4, 2022 · Apt 3L
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... 4 square feet at the ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north original violation 15095019 issued 04-apr-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 4, 2022 · Apt 3L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Apr 4, 2022 · Apt 3L
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Apr 4, 2022 · Apt 3L
Open — Nov certified late - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling 2 square feet in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Apr 4, 2022 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, east wall, south wall in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Apr 4, 2022 · Apt 3L
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall, east wall in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Apr 4, 2022 · Apt 3L
Open — Nov certified late - ANon-hazardous
Trace and repair the source and abate the visible mold condition... 4 square feet at the ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Apr 4, 2022 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Apr 4, 2022 · Apt 3L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Mar 27, 2022 · Apt 3L
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Oct 2, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2021 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2021 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Sep 30, 2021 · Apt 3L
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Sep 30, 2021 · Apt 3L
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Sep 30, 2021 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Sep 30, 2021 · Apt 3L
Closed — Violation closed - ANon-hazardous
Refit entrance door in the entrance located at apt 3l, 3rd story, 1st apartment from west at north
Sep 30, 2021 · Apt 3L
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Sep 30, 2021
Open — Nov certified late - BHazardous
Remove all encumbrances consisting of household items, all stories at public hall
Sep 18, 2020
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; air conditioner missing oneway screws and stops located at apt 3l, 3rd story, 1st apartment from west at north
Jul 29, 2020 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the floor, all stories at public hall
Jul 29, 2020
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 29, 2020
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall at public hall, 1st story
Jul 29, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material south wall, north wall at public hall, 1st story
Jul 29, 2020
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Jul 29, 2020 · Apt 3L
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors , in the entrance located at apt 3l, 3rd story, 1st apartment from west at north
Feb 22, 2020 · Apt 3L
Closed — Violation closed
DOB building violations · 20
- Construction other optional
On 7/18/24,dept.rec'd rpt from h+o eng. report states: rearwall removd lacks required waterproofing; cellar access denied. non-conforming con dition makes structure potentially hazardous. remedy: failure to comp ly w. dob # 071824ce30101j.install.waterproofng.pe to assess monthly, weekly rpts'til temp wtrprfng+stairs,in-place,1st report due 7/29/24
Jul 24, 2024
Dob violation - active - Construction other optional
On 7/18/24,dept. rec'd rpt from h+o eng. report states:rearwall removd lacks required waterproofing; cellar access denied. non-conforming con dition makes structure potentially hazardous. remedy: install waterproofing. pe to assess site monthly, weekly until temp waterproofing +stairs in place.1st rpts due 7/22/24
Jul 18, 2024
Dob violation - active - Construction other optional
Failure to comply with order contained in dob vio 041924ce30101jt, (control #376228) remedy: comply with commissioner's order. provide plans by 7/1/24
Jun 7, 2024
Dob violation - active - Construction other optional
Failure to comply with order contained in dob vio 041924ce30102jt, (control #376229) remedy: comply with commissioner's order. commence work under permit by 7/1/24
Jun 7, 2024
Dob violation - active - Construction other optional
Dept found unpermitted work: undocumented/un-inspected underpinning in stalled below party walls, cellar partially excavated, posing hazard property fully vacated. remedy: retain nys pe to prepare plans documenting.undocumented underpinning submit plans by 5/31/24
Apr 19, 2024
Dob violation - active - Construction other optional
Dept found unpermitted work posing hazard. pe rpt recommends removal of rear wall under permit. remedy: retain nys pe to prepare plans to restore foundations. slab and rear wall into code compliance. start work under permit by 5/31/24
Apr 19, 2024
Dob violation - active - Construction other optional
Multiple engineering reports note active water leak and standing water at the cellar. this is a potential hazard to public & property remedy: ownrship faild 2 comply w commisioner's ordr # 010524ce30101jt .instal adequat drainage & watr contrl measurs.docs by 4/19/24
Apr 17, 2024
Dob violation - active - Construction other optional
Received report of flooding at cellar level. in place berms & shoring may have been compromised. remedy: retain nys pe to evaluate berms and shoring at cellar and provide report with remediation recommendations by 1/26/24
Jan 24, 2024
Dob violation - dismissed - Construction other optional
Unpermitted excavation & alteration work has potentially compromised exp#3 wall & structural elements supportng interior load bearing walls remedy: retain rdp,cs,&gc2stabilze,secure & protect site.wrk must strt 11/8/23 undr fultime rdp&cs supervison.submit daly rpts until completed
Nov 6, 2023
Dob violation - dismissed - Construction other optional
Unpermitted excavation & alteration work has potentially compromised exp#3 wall and structural elements supporting interior load bearing walls remedy: retain rdp,cs & gc to stabilize, secure & protect site. work must start 11/3 under f/t rdp&cs supervsn.submit daly rpts til.complte
Nov 2, 2023
Dob violation - dismissed
Show 10 more ↓
- Construction other optional
Cellar excavated shorring, underpinning, plumbing altered 4" pvc pipe connected to house rail
Nov 1, 2023
Vw-violation work without permit - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Construction other optional
Failure to maintain building in code complaint manner remedy; repair and or replace defects
Nov 13, 2012
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 17
- Class - 1
Failure to comply with the commissioner's order to obtain work permitsfor violation #35671330h. no permits on file to perform work in cellar. remedy: obtain work permits/comply with commissioner's order.
Feb 5, 2026 · Penalty $2,500
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept. of buildings for violation #35671333n. remedy: file a certificate of correction.
Feb 5, 2026 · Penalty $1,250
Active - Class - 1
Failure to comply-summons and commissioner's order #376241(dob vio 060724ce30101jt), issued for failure to comply with violation 041924ce30101jt(control #376228). as per commissioner's order #376228, ownership
Jul 22, 2025 · Penalty $2,500
Active - Class - 1
Failure to comply-summons and commissioner's order 35649848l(dob vio 050725ce30101jt), issued for failure to comply with summons and commissioner's order 35649841z(dob vio 082124ce30101jt) issued for failure to
Jul 22, 2025 · Penalty $6,250
Active - Class - 1
Failure to comply-summons and commissioner's order 35649841z(dob vio 082124ce301jt) issued for failure to comply with violation 0724ce30101jt(control #376247, issued for failure to comply with violation 071824c
May 7, 2025 · Penalty $6,250
Active - Class - 1
Failure to comply-commissioner's order contained in dob vio 042224ce30101jt(ecb 35649838h) issued for failure to comply with dob vio 041724ce3016jt(control #376227), issued for failure to comply with violation
Sep 14, 2024 · Penalty $6,250
Active - Class - 1
Failure to comply commissioner's order contained in violation 072424ce30101jt(control #576247), issued for failure to comply with violation 071824ce3011jt(control #376245). as per commissioner's order #376245,
Aug 21, 2024 · Penalty $25,000
Active - Class - 1
Failure to comply commissioner's order contained in violation 041724ce30101jt(control#376227)issued for failure to comply with violation 010524ce30101jt(control#339166)issued on 1/5/2024 mandated ownership to i
Apr 22, 2024 · Penalty $2,500
Active - Class - 1
Failure to comply with emergency work order. observed unpermitted excavation underpinning and alteration work in occupied building exp. 3 wall and several structural member's loadpaths were potentially compromi
Dec 29, 2023 · Penalty $2,500
Resolve - Class - 1
Failure to comply with emergency worker: observed unpermitted excavation, underpinning, and alteration work in occupied residential building. exp. 3 wall and seversl tructural member's load paths were potential
Dec 11, 2023
Resolve
Show 7 more ↓
- Class - 1
Work w/o permit. notedd: in cellar of bldg. aprox. 3 feet of dirt dug down to increase ceiling height. temp shoring installed and sitting onmuddy ground, hot water heater connected to gas line sitting asqued ne
Nov 2, 2023 · Penalty $12,500
Active - Class - 3
Failure to maintain building in code compliant matter: construction debris scatter throughout cellar and rear yard creating potential tripping hazards. remedy: repair/replace.
Nov 2, 2023 · Penalty $500
Active - Class - 1
Failure to maintain bldg. with code compliant matter. noted: building is structurally compromised with unpermitted excavation and underpinning in cellar that undermined and destabilized the bldg.-1st floor is s
Nov 2, 2023 · Penalty $6,250
Active - Class - 2
Spill switch is defective-illegal draft inducer installed in the hwh's flue-debris in boiler room+at gas meters-boiler room light is defective-abandoned oil fill pipe is not cement filled
Jan 23, 2019 · Penalty $312
Active - Class - 3
Failure to maintain bldg in a code compliant manner. observed penetration holes in boiler room walls violation of fire proofing of boiler room. 1st hole 12"x12" to backyard 2nd hole 12"x2'in separating wall to
Apr 19, 2016 · Penalty $230
Resolve - Class - 2
Failure to maintain building in a code compliant manner.noted in apt 1l & 1r at rear of apartments, vertical cracks noted in corner of rooms.in apt 1r rear wall between windows is bulging inward and windows no
Jan 9, 2013 · Penalty $500
Resolve - Hazardous
Failure to maintain. defect is rotted defective and exposed floor joists at cellar rear under rear apartment toilet. missing sections of fire rotted ceiling throughout cellar area and boiler room. make all nec
Jun 1, 1999
Resolve
Complaints
- Electric
Power outage
Nov 1, 2023 · Apt BLDG
Close - Electric
Power outage
Oct 31, 2023 · Apt BLDG
Close - Line of travel
Line of travel
Oct 17, 2023 · Apt 2L
Close - Heat/hot water
Entire building
May 1, 2023 · Apt 3L
Close - Water leak
Slow leak
Feb 15, 2023 · Apt 3L
Close - Electric
Lighting
Dec 27, 2022 · Apt 3L
Close - Heat/hot water
Entire building
Dec 1, 2022 · Apt 3L
Close - Heat/hot water
Entire building
Nov 30, 2022 · Apt 3L
Close - Heat/hot water
Entire building
Nov 28, 2022 · Apt 3L
Close - Door/window
Door
Aug 2, 2022 · Apt 3L
Close
Show 40 more ↓
- Door/window
Door frame
Aug 1, 2022 · Apt 3L
Close - Door/window
Door
Jul 27, 2022 · Apt 3L
Close - Door/window
Door
Jul 25, 2022 · Apt 3L
Close - Door/window
Door
Jul 25, 2022 · Apt 3L
Close - Door/window
Door frame
Jul 18, 2022 · Apt 3L
Close - Door/window
Door
Jul 18, 2022 · Apt 3L
Close - Water leak
Heavy flow
Mar 29, 2022 · Apt 3L
Close - Water leak
Heavy flow
Mar 23, 2022 · Apt 3L
Close - Heat/hot water
Entire building
Jan 8, 2022 · Apt 3L
Close - Heat/hot water
Apartment only
Jan 7, 2022 · Apt 3L
Close - General
Cooking gas
Oct 5, 2021 · Apt 3L
Close - Heat/hot water
Apartment only
Oct 5, 2021 · Apt 3L
Close - Heat/hot water
Apartment only
Sep 29, 2021 · Apt 3L
Close - General
Cooking gas
Sep 29, 2021 · Apt 3L
Close - General
Cooking gas
Sep 28, 2021 · Apt 3L
Close - Heat/hot water
Entire building
Sep 28, 2021 · Apt 3L
Close - Heat/hot water
Entire building
Aug 24, 2021 · Apt 3L
Close - Heat/hot water
Entire building
Aug 23, 2021 · Apt 3L
Close - Plumbing
Water supply
Jul 1, 2021 · Apt 3L
Close - Heat/hot water
Entire building
Feb 20, 2021 · Apt 3L
Close - Paint/plaster
Wall
Jul 17, 2020 · Apt 3L
Close - Flooring/stairs
Floor
Jul 17, 2020 · Apt 3L
Close - Door/window
Window frame
Jul 17, 2020 · Apt 3L
Close - Door/window
Door
Jul 17, 2020 · Apt 3L
Close - Paint/plaster
Wall
Jul 17, 2020 · Apt 3L
Close - Appliance
Refrigerator
Jul 17, 2020 · Apt 3L
Close - Door/window
Window frame
Jul 17, 2020 · Apt 3L
Close - Flooring/stairs
Floor
Jul 17, 2020 · Apt 3L
Close - General
Janitor/super
Jul 17, 2020 · Apt PA
Close - Door/window
Door
Jul 17, 2020 · Apt PA
Close - Door/window
Door
Jul 17, 2020 · Apt PA
Close - Unsanitary condition
Garbage/recycling storage
Jul 17, 2020 · Apt PA
Close - Paint/plaster
Wall
Jul 17, 2020 · Apt PA
Close - Flooring/stairs
Stairs
Jul 17, 2020 · Apt PA
Close - General
Mailbox
Jul 17, 2020 · Apt PA
Close - Unsanitary condition
Pests
Jul 17, 2020 · Apt PA
Close - Unsanitary condition
Pests
Jul 17, 2020 · Apt PA
Close - Heat/hot water
Entire building
Jul 12, 2020 · Apt 3L
Close - Heat/hot water
Entire building
Jul 11, 2020 · Apt BLDG
Close - Paint/plaster
Wall
Nov 12, 2019 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 8
- Building area
- 5,500 ft²
- Lot area
- 1,965 ft²
- Zoning
- R7-1
- Community board
- 301
- Council district
- 33
- Block / lot
- 2264 / 3
- Assessed value
- $478,800
- Landmark / historic district
- No
HPD registration #362774, last renewed Aug 24, 2025.
Questions about 273 Lee Avenue
Who owns 273 Lee Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 273 Lee Ave LLC.
Does 273 Lee Avenue have violations?
Yes. NYC HPD has recorded 364 housing violations at this property.
Is 273 Lee Avenue rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 38% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 273 Lee Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 273 Lee Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.