73 Wilson Street
Brooklyn, NY 11249BBL 3-02176-0001Map
Owner of record: Williamsburg Housing Preservation LP
73 Wilson Street is an elevator apartment building built in 1964 in Brooklyn, 11249. It has 372 residential units across 21 floors. The owner of record is Williamsburg Housing Preservation LP. HPD has recorded 53 housing violations here, most recently on September 11, 2026. 14 of the 50 most recent violations are still open.
- HPD violations
- 53
- DOB violations
- 50
- ECB violations
- 44
- HPD complaints
- 126
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 53
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 18f, 28th story, 1st apartment from west at north
Sep 11, 2026 · Apt 18F
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 18f, 28th story, 1st apartment from west at north
Sep 11, 2026 · Apt 18F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt apt17e, 17th story, 1st apartment from south at west
May 25, 2026 · Apt APT17E
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 25, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt apt17e, 17th story, 1st apartment from south at west
May 25, 2026 · Apt APT17E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt apt17e, 17th story, 1st apartment from south at west
May 25, 2026 · Apt APT17E
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt apt17e, 17th story, 1st apartment from south at west
May 25, 2026 · Apt APT17E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt apt17e, 17th story, 1st apartment from south at west
May 25, 2026 · Apt APT17E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt apt17e, 17th story, 1st apartment from south at west
May 25, 2026 · Apt APT17E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the private hallway located at apt apt17e, 17th story, 1st apartment from south at west
May 25, 2026 · Apt APT17E
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Oct 13, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north
Oct 13, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at east, south walls and ceiling in the bathroom located at apt 3a, 3rd story, 2nd apartment from south at west
Aug 9, 2025 · Apt 3A
Open — Violation will be reinspected - BHazardous
Properly repair or replace the broken or defective knob at entrance in the 1st room from north located at apt 3a, 3rd story, 2nd apartment from south at west
Aug 9, 2025 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 3rd story, 2nd apartment from south at west
Aug 9, 2025 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west and north wall in the 3rd room from east located at apt 13c, 13th story, 1st apartment from north at east
Aug 5, 2025 · Apt 13C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the north wall, east wall, west wall, and the ceiling in the bathroom located at apt 15c, 15th story, 1st apartment from east at south
Aug 3, 2025 · Apt 15C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall and the ceiling in the private hallway located at apt 15c, 15th story, 1st apartment from east at south
Aug 3, 2025 · Apt 15C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north at east, the private hallway , the bathroom located at apt 15c, 15th story, 1st apartment from east at south
Aug 3, 2025 · Apt 15C
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft aggregate at the north wall, east wall, west wall, and the ceiling in the bathroom located at apt 15c, 15th story, 1st apartment from east at south
Aug 3, 2025 · Apt 15C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at door at east wall leading to fire stairs ''b'' at public hall, 17th story
Jul 28, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north located at apt 15c, 15th story, 1st apartment from south at west
Jun 14, 2025 · Apt 15C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak from ceiling north wall in the 1st room from east at north located at apt 15c, 15th story, 1st apartment from south at west
Jun 14, 2025 · Apt 15C
Closed — Violation dismissed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
May 30, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the south wall in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east
May 15, 2025 · Apt 2B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the private hallway , the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
May 15, 2025 · Apt 2B
Open — Nov sent out - ANon-hazardous
Properly secure the loose light fixture at north wall in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
May 13, 2025 · Apt 2B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 8e, 8th story, 1st apartment from east at south
Nov 27, 2024 · Apt 8E
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 8e, 8th story, 1st apartment from east at south
Nov 27, 2024 · Apt 8E
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 8e, 8th story, 1st apartment from east at south
Nov 27, 2024 · Apt 8E
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 8e, 8th story, 1st apartment from east at south
Nov 27, 2024 · Apt 8E
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective intercom system from building front to south wall in the foyer located at apt 8e, 8th story, 1st apartment from east at south
Nov 27, 2024 · Apt 8E
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of battery operated bike at public hall, 21st story
Nov 25, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 2nd apartment from west at north
Sep 24, 2024 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Remove all obstructions and repair all defects in waste pipe line at wash basin in the bathroom located at apt 1a, 1st story, 2nd apartment from west at north
Sep 24, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste pipe line at bathtub in the bathroom located at apt 1a, 1st story, 2nd apartment from west at north
Sep 24, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1a, 1st story, 2nd apartment from west at north
Sep 24, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Abate the infestation consisting of vermin dust mites in the entire apartment located at apt 21e, 21st story, 1st apartment from south at west
Feb 8, 2024 · Apt 21E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling, east and south walls at public hall, 20th story
May 17, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, east and south walls at public hall, 20th story
May 17, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 13, 2021
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
May 13, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
May 13, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 13, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 13, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 13, 2021
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at that is missing at public hall, 1st story
May 13, 2021
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed
DOB building violations · 50
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 30, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Aug 30, 2018
Vp*-violation unserved ecb- dismissed
Show 40 more ↓
- Construction other optional
C-construction other optional
Aug 30, 2018
Vp*-violation unserved ecb- dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Construction other optional
Borough comm. has ordered all work stopped under permit#3405388662 on 01/23/18 due to the site safety manager of construction project has wi thdrawn unable to verify percentage of work completed/remedy: stop all work immediately make site safe contact borough comm. office at 718 80 2-3677 for info
Jan 26, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2016
Feb 16, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 23, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 23, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 23, 2016
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Construction other optional
Matters not provided
Apr 14, 2011
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Aug 19, 2008
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 44
- Class - 1
Class 1 agg 1: firefighter's service phase i does not recall this device to the main floor as required. as per asme a17.1 2.27. this condition was previously cited and remains uncorrected, justifying agg 1 enha
Aug 10, 2026 · Penalty $3,125
Active - Class - 2
At the time of inspection on an active job site was for facade repairs , i observed sidewalk shed around perimeter of site ,when i asked contractors on site for plans for sidewalk shed none was provided or ava
Jun 4, 2026 · Penalty $1,250
Resolve - Class - 2
At the time of inspection on an active job site for facade repairs , i observed sidewalk shed at exposure 1 & 2 was not as per bc 3307.6.4.9 that cross bracing between vertical members shall be placed a minimum
Jun 4, 2026 · Penalty $2,400
Resolve - Class - 2
At the time of inspection on an active job site for facade repairs, sidewalk shed was not as per bc 3307.6.4.4 i observed an active drive way at exposure 1 where the vertical members of the sidewalk shed n
Jun 4, 2026 · Penalty $2,400
Resolve - Class - 1
Class 1 item: fire service inoperative, repair.
Jan 6, 2026 · Penalty $1,250
Resolve - Class - 1
Class 1 item: fire service inoperative, repair.
Jan 6, 2026 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner. class 1 item: fire service inoperative, repair.
May 2, 2025 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner. class 1 item: fire service inoperative, repair.
May 2, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control909594.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #909592.remedy:submit acceptable require tec
Dec 2, 2022 · Penalty $1,250
Resolve
Show 34 more ↓
- Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control909591.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 1
Notice to occupants-tenant protection plans not provided/posted note:ato my insp of 21sty occupied bldg w/const ops on all 21fl i observed that there were no tenant protection plans posted w/i 10' of elevator a
Oct 19, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v39035252j issued 1/21/21&to file c/c pursuant to28-201.1&1rcny102-01.for doing work that wasnt confirmed to approved plans@exterior wall.comply w/c
May 13, 2021
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v39035252j issued1/21/21&to file c/c pursuant to28-201.1&1rcny102-01.for doingwork that doesnt conform to approved plans.comply w/commissioner's ord
Mar 23, 2021
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v39035263p issued1/21/21&to file c/c pursuant to28-201.1&1rcny102-01.for excessive const debris thruout public corridors.comply w/commissioner's ord
Mar 23, 2021 · Penalty $1,250
Resolve - Class - 1
Work not confierm with approved pland. ref to dob record permit # 340712919-01-ew-ot. observed work in progress in all floors by approx. 50 workers, demolished wall including exterior wall in the hallway. debri
Jan 21, 2021
Resolve - Class - 1
Noted: at time of inspection excessive construction debris and materials throughout public corridors and stairwells. stop all work in conjunction with permit #340702546. only work allowed is to remove debris in
Jan 21, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to post and distribute notice to occupants of tpp. ref to dob records tpp received date 1/21/2020. upon inspection, observed on going work under permit # 340702546. hi rise building ( 17 floors) with fu
Jan 21, 2021 · Penalty $1,250
Resolve - Class - 1
Class one items: 1) missing dlm as now required by code 2) constant pressure stop switches prohibited 3) missing car phone as required by k3 class 2 items: replace cab mirror. provide designated lobby braille t
Mar 4, 2020 · Penalty $1,250
Resolve - Class - 1
Class one items: 1) missing dlm as now required by code 2) constant pressure stop switches prohibited 3) missing car phone as required by k3 class 2 items: replace cab mirror. provide designated lobby braille t
Mar 4, 2020 · Penalty $1,250
Resolve - Class - 1
Class one items: 1) missing dlm as now required by code 2) constant pressure stop switches prohibited 3) missing car phone as required by k3 class 2 items: replace cab mirror. provide designated lobby braille t
Mar 4, 2020 · Penalty $1,250
Resolve - Class - 1
Class one items: 1) missing dlm as now required by code 2) constant pressure stop switches prohibited 3) missing car phone as required by k3 class 2 items: replace cab mirror. provide designated lobby braille t
Mar 4, 2020 · Penalty $1,250
Resolve - Class - 1
Class one items: 1) missing dlm as now required by code 2) constant pressure stop switches prohibited 3) missing car phone as required by k3 class 2 items: replace cab mirror. provide designated lobby braille t
Mar 4, 2020 · Penalty $1,250
Resolve - Class - 1
Class one items: 1) missing dlm as now required by code 2) constant pressure stop switches prohibited 3) missing car phone as required by k3 class 2 items: replace cab mirror. provide designated lobby braille t
Mar 4, 2020 · Penalty $1,250
Resolve - Class - 2
Notification of removal of sidewalk shed.at time of inspection on a 21story alt-2 observed sidewalk shed was removed completely from all exposures.upon research,no application was sent to the dept.within 2 busi
Jul 22, 2019 · Penalty $1,250
Resolve - Class - 2
Failed to notify dept.prior to removal of suspended scaffold.@time of inspection on a 21 story alt-2,observed no suspended scaffold on site.upon research,no notification to the dept.prior to removal of the susp
Jul 22, 2019 · Penalty $2,500
Resolve - Class - 2
Mobile trailer #2 is not registered, maintain boiler
Mar 19, 2019
Resolve - Class - 2
Mobile trailer #1 not registered, maintain boiler; register mobile trailer
Mar 19, 2019
Resolve - Class - 1
Securing suspended scaffold. suspended scaffold shall be lowered at the street or deck of the sws at the end of the shift or in accordance with design drawings. note: at time of inspecion i observed suspended
Oct 12, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to safeguard all public and property affected by construction operations.note:responding to compliant#3665115 where it was reported that construction material falling onto air condition,was not covered
Aug 30, 2018 · Penalty $10,000
Resolve - Class - 2
Failure to file acceptable amended report indicating correction of un safe conditions described in initial local law 11/98 report. rmdy: file acceptable amended report.
Nov 7, 2016
Resolve - Class - 2
Failure to file acceptable amended report indicating correction of un safe conditions described in initial local law 11/98 report. rmdy: file acceptable amended report.
Nov 7, 2016
Resolve - Class - 2
Failure to file acceptable amended report indicating correction of un safe conditions described in initial local law 11/98 report. rmdy: file acceptable amended report.
Nov 7, 2016
Resolve - Class - 2
Sec. 3307.6.5 failure to maintain adequate illumination beneath sidewalk shed as required by code. noted: sidewalk shed erected under job #340315126 along exp#4 has inoperable bulbs rendering affected area visi
Dec 29, 2015
Resolve - Class - 2
Use of prohibited door hardware per bc 1008.1.8; 27-371(j). use of prohibited door stops on classrooms & entry door. remedy: remove prohibited hardware.
Jan 21, 2015
Resolve - Class - 1
Inadequate safety measures: operation of hoisting equipment in unsafe manner: noted: material hoist at roof level,had kinks & bird caging onwire rope: use for hoisting & lowering of material & debris (defective
Aug 17, 2010
Resolve - Class - 1
Failure to perform safe/proper inspection of material hoist. noted: inspection records indicate that all items on check list for material hoist were in compliance,found violating conditions on hoist refer to
Aug 17, 2010
Resolve - Class - 2
Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.36009873y.rem:file an amended report following remedial re
Jul 16, 2010
Resolve - Class - 2
Failure to post permit as required.noted:sdwlk shed erected @ site under pmt#320159136.there are no permit's posted.rem:post permits
Jul 9, 2010
Resolve - Class - 1
28-302.5.local law report filed as "unsafe"by architect/engineer-no amended report was filed "unsafe conditions"require safety provisions asas per code 27-129(d),1rcny 32-03(b)(5)(c).no sidewalk shed,fence,etc
Jan 11, 2010
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remed
Oct 23, 2009
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa
May 22, 2009
Resolve - Non-hazardous
Expired permit. sidewalk shed. at time of inspections sidewalk shed was erected and dob record shows permit# 301193526 was expired on 12.31.01. remedy: renew permit for sidewalk shed as per code.
Oct 1, 2002 · Penalty $2,500
Resolve - Non-hazardous
New building occupied without a valid c of o job#300679978 temporary c of o issued on 12/28/01 has expired on 3/28/02 remedy obtain a valid c of o
Jun 21, 2002
Resolve
Complaints
- Water leak
Slow leak
Oct 15, 2026 · Apt 1B
Open - Water leak
Damp spot
Sep 10, 2026 · Apt 18F
Close - Water leak
Slow leak
Sep 10, 2026 · Apt 18F
Close - General
Mailbox
Sep 8, 2026 · Apt 14B
Close - General
Cooking gas
Aug 9, 2026 · Apt 11F
Close - Unsanitary condition
Pests
May 19, 2026 · Apt 1A
Close - Water leak
Damp spot
May 12, 2026 · Apt 18F
Close - Water leak
Slow leak
Apr 24, 2026 · Apt 12F
Close - Appliance
Refrigerator
Apr 18, 2026 · Apt 18A
Close - Door/window
Door
Apr 17, 2026 · Apt APT17E
Close
Show 40 more ↓
- Electric
Outlet/switch
Apr 17, 2026 · Apt APT17E
Close - Appliance
Refrigerator
Apr 17, 2026 · Apt APT17E
Close - Plumbing
Bathtub/shower
Mar 7, 2026 · Apt 15C
Close - Unsanitary condition
Mold
Mar 7, 2026 · Apt 15C
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 1B
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2026 · Apt BLDG
Close - Safety
Sprinkler
Jan 5, 2026 · Apt 21A
Close - Plumbing
Water supply
Jan 5, 2026 · Apt 21A
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt 8E
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt 8E
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 12F
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 4C
Close - Paint/plaster
Ceiling
Oct 12, 2025 · Apt 2B
Close - Electric
Lighting
Oct 12, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Oct 12, 2025 · Apt 2B
Close - Appliance
Refrigerator
Oct 12, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Oct 10, 2025 · Apt 2B
Close - Electric
Outlet/switch
Oct 10, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Oct 10, 2025 · Apt 2B
Close - General
Ventilation system
Oct 10, 2025 · Apt 2B
Close - Appliance
Refrigerator
Oct 10, 2025 · Apt 2B
Close - Plumbing
Basin/sink
Aug 5, 2025 · Apt 3A
Close - Door/window
Door
Aug 5, 2025 · Apt 3A
Close - Unsanitary condition
Mold
Aug 5, 2025 · Apt 3A
Close - Paint/plaster
Wall
Aug 4, 2025 · Apt 13C
Close - General
Janitor/super
Aug 4, 2025 · Apt 13C
Close - Unsanitary condition
Mold
Jul 30, 2025 · Apt 15C
Close - Paint/plaster
Wall
Jul 30, 2025 · Apt 15C
Close - Plumbing
Basin/sink
Jul 30, 2025 · Apt 15C
Close - Door/window
Door
Jul 17, 2025 · Apt 21E
Close - Paint/plaster
Ceiling
Jul 17, 2025 · Apt 21E
Close - Plumbing
Basin/sink
Jun 28, 2025 · Apt 18D
Close - Flooring/stairs
Floor
Jun 28, 2025 · Apt 18D
Close - Unsanitary condition
Mold
Jun 10, 2025 · Apt 15C
Close - Paint/plaster
Ceiling
Apr 24, 2025 · Apt 2B
Close - Paint/plaster
Wall
Apr 24, 2025 · Apt 2B
Close - Electric
Lighting
Apr 24, 2025 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1964
- Floors
- 21
- Residential units
- 372
- Building area
- 353,308 ft²
- Lot area
- 116,000 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2176 / 1
- Assessed value
- $16,853,850
- Landmark / historic district
- No
HPD registration #389455, last renewed Aug 6, 2025.
Questions about 73 Wilson Street
Who owns 73 Wilson Street?
The owner of record in NYC Department of City Planning PLUTO data is Williamsburg Housing Preservation LP.
Does 73 Wilson Street have violations?
Yes. NYC HPD has recorded 53 housing violations at this property.
Is 73 Wilson Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 73 Wilson Street built?
City records list 1964 as the year it was built.
How many apartments are in 73 Wilson Street?
It has 372 residential units and 374 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.