roofy

540 Bedford Avenue

Brooklyn, NY 11249BBL 3-02181-0035Map

Owner of record: Congregation Yetev Lev D'satmar INC.

540 Bedford Avenue is a religious facility built in 1980 in Brooklyn, 11249. The owner of record is Congregation Yetev Lev D'satmar INC.. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
42
ECB violations
68
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 42

  • Construction other optional

    Failure to maintain building in a code compliant manner. as noted: at time of inspection, observed on exposure #4 west elev: loose material on floors and vertical crack in cinder blocks on 2nd floor. remedy: repair and/or replace all damaged and defective materials

    Aug 18, 2026

    Dob violation - active
  • Immediate emergency anythingoptional

    Secure stalled job site immediately. seal all accessible openings

    Sep 2, 2025

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code compliant manner. observed unfinished construction, facade open to elements on all exposures including no roof, cracked, damaged mortar joints, in multiple locations on exposure 1,2 & 4 (northeast, and west elevations) remedy: repair and/or replace

    Apr 10, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner. at time of inspection it was observed unsecured/loose corregated metal sheeting at various locations from exposure 1 (north elev.) deteriorated mortar joints @exp4 (w.elev.) loose masonry debris around 3rd fl observed, loose/collapsed railings & on masonry. remedy: repair and/or replace

    Oct 25, 2024

    Dob violation - active
  • Construction other optional

    Work without a permit. expired permit at time of inspection for fence at exposure 2 (east elevation). no valid permit for fence observed in bis or dobnow as of 10/25/2024. remedy: renew permit

    Oct 25, 2024

    Dob violation - active
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Jun 25, 2024

    Dob violation - active
  • Immediate emergency anythingoptional

    Repair or replace sidewalk shed supporting leg post at exposure #1 north east end of sidewalk shed

    Jun 25, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.as note at tim e of inspection,i observed on exp1 north elev and exp4 west elev,mason ry appears loose and may be in danger of falling from the 2nd floor.ex p3 south elev,loose object hanging from a framing member on 1st floor remedy:repair and/or replace all hazardous conditions

    May 30, 2024

    Dob violation - active
  • Immediate emergency anythingoptional

    Remove entire existing sidewalk shed & construction fencing on all ele vations. install new sidealk shed approx 110'lf along exp1(bedford av) approx 170'lf along exp2(ross st),& approx 270'lf along exp4 (wilson st) including adepuate exteinsions to provide overhead protection to neighboring properties. remove existing construction fencing on exp 2

    Feb 5, 2024

    Dob violation - dismissed
Show 32 more ↓
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - active
  • Structurally compromised building none

    Failure to submit an acceptable inspectn rpt for structurally compromised bldg.

    Sep 14, 2022

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2021

    Aug 21, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 11, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2017

    Dob violation - active
  • Residential elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Jun 1, 2016

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 13, 2013

    Dob violation - active
  • Construction other optional

    Failure to safeguard all persons and property affected by construction operations./ remedy; safe guard sit and materials

    Oct 30, 2012

    Dob violation - active
  • Private residential elevator elevatoroptional

    2011 vios issued to elevators in private res dwellings(1 or 2 family dwellings)

    Oct 1, 2012

    Dob violation - active
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Sep 20, 2012

    Dob violation - dismissed
  • Private residential elevator elevatoroptional

    Violation issued to elevators in private res dwellings (1 or 2 family dwellings)

    Nov 12, 2010

    Dob violation - dismissed
  • Construction other optional

    Brooklyn borough commissioner has issued a 15 day letter of intent to revoke appl#30044377 on 7/26/10 remed; stop all work, comply with commissioner .order contact dob

    Jul 29, 2010

    Dob violation - active
  • Construction other optional

    Borough commissioner revoked application #300443777 on 5/9/10 remedy; stop work call dob

    Jun 10, 2010

    Dob violation - active
  • Construction other optional

    Borough commissioner has issued a 15 day letter of intent to revoke appl3300443777 done 5/12/10 work 45% completed remedy; stop all work call dob

    May 12, 2010

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Dec 5, 2008

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Dec 5, 2008

    Dob violation - active
  • Elevator elevatorrequired

    3p8183

    Mar 23, 2000

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 10, 2000

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 20, 1999

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 6, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 8, 1996

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    May 31, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Elevator elevatoroptional

    1

    Jun 28, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Apr 7, 1992

    Dob violation - dismissed

ECB violations · 68

  • Class - 2

    Temporary construction equipment on site, expired permit. at time of inspection fence permit were expired. remedy: renew permit.

    Aug 18, 2026 · Penalty $1,250

    Active
  • Class - 2

    Expired sidewalk shed permit, at time of inspection sidewalk shed permit was expired. remedy: renew permit.

    Aug 18, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in a code-compliant manner. noted, illegal curb cut and drive at exposure 1, with illegal storage cover with blue tarp in driveway. exposure 3, illegal driveway approximately 12' wi

    Sep 2, 2025 · Penalty $6,250

    Active
  • Class - 3

    Violation of parking regulations in a residential district. noted, illegal storage in driveway at exposure 1. storage items are covered by a blue tarp. no permits issued or filed with dob., conform to parking r

    Sep 2, 2025 · Penalty $500

    Active
  • Class - 2

    Temporary construction equipment on site expired permit(fence). as of today 04/10/2025 permit #301892780-01-eqfn expired on 12/31/2008. no current active permit. remedy: renew permit.

    Apr 10, 2025

    Resolve
  • Class - 2

    At the time of my inspection of a sidewalk shed dob records reveal that there is no permit for this temporary construction equipment which creates a hazardous condition for public and property.obtain and mainta

    Mar 27, 2025 · Penalty $6,250

    Active
  • Class - 1

    Observed a sidewalk shed at exp #1 of 109 ross st, exp #1 of 540 bedford ave & exp#4 of 540 bedford ave. upon review observed workers compensation policy #k 524 979-2 expired on 06/24/2024&disability policy #db

    Aug 29, 2024 · Penalty $10,000

    Active
  • Class - 1

    Observed a sidewalk shed at exp #1 of 109 ross st, exp #1 of 540 bedford ave & exp#4 of 540 bedford ave. upon review observed workers compensation policy #k 524 979-2 expired on 06/24/2024&disability policy #db

    Aug 29, 2024 · Penalty $25,000

    Active
  • Class - 1

    At time of inspection observed a sidewalk shed at exposure #1. sidewalk shed permit# 320559935-01-eq-sh was filed under cong yetev lev d'satmar gc# 601046, upon review noticed that gc workers compensation expir

    Aug 29, 2024 · Penalty $10,000

    Active
  • Class - 2

    Observed a construction fence at exposure #1 of property. permit# 301892780-01-eq-fn was issued on 05/24/2006 and expired on 12/31/2006. no active permits or renewal observed in bis or in dob now., renew permit

    Aug 29, 2024 · Penalty $6,250

    Active
Show 40 more ↓
  • Class - 1

    Observed a sidewalk shed at exposure#1, however upon review noticed gc workers compensation and disability was expired. sidewalk shed is no longer maintained by a licensed professional as gc disability and work

    Aug 29, 2024 · Penalty $10,000

    Active
  • Class - 2

    Pedestrial protection does not meet code specifications.as noted at time of inspection observed on exp #1 north elevation:shed post was pushed out of place/plumb due to inadequate bracing on lower post.also obs

    May 30, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Temporary construction equipment on site,expired permit.as noted:at time of inspection construction fence permit was expired.remedy:renew permit for construction fence.

    May 30, 2024 · Penalty $6,250

    Active
  • Class - 2

    Expired sidewalk shed permit at time of inspection observed a sidewalkshed on exp#1,2,3,4.no permits were present onsite.observed no permitsonline on bis or dobnow.rem:renew permit.

    Feb 2, 2024 · Penalty $6,250

    Active
  • Class - 2

    Sidewalk shed does not meet code specifications at time of inspection observed shed not near the facade.between shed and facade big gap withno netting.sidewalk shed mudsills are brooker missing and not nailed i

    Feb 2, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Work without a permit expired permit at time of inspection observed a construction fence on the property no permit observed on property.no permit online bis or dobnow.rem:renew permit.

    Feb 2, 2024 · Penalty $6,250

    Active
  • Class - 2

    Sws at exp#1&4 not as per code, sws not cover full width of sidewalk, approx. 5ft with no protection of sidewalk, walkway less than 5ft,mudsills are rotten, sidewalk shed post on top of cracked wood block, para

    Oct 26, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    Observed sidewalk shed installed at exp#1&4, upon review the department records ( bis & dob now) observed no permit was issued for sidewalk shed installation, last sidewalk shed permit# 320559935 expired on 3/

    Oct 26, 2023 · Penalty $3,125

    Resolve
  • Class - 2

    At time of inspection observed erected sidewalk shed at exp#1 and 4, upon reviewing department records no active permits on file.

    Jul 5, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection observed erected sidewalk shed at exp#1 and 4 not maintained with parapet panels leaning toward public and mudsills not properly secured, bolts not capped.

    Jul 5, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection observed sidewalk severely cracked and not maintained at exp#4 causing tripping hazard to the public.

    Jul 5, 2023 · Penalty $3,125

    Resolve
  • Class - 2

    Temporary construction equipment on site-expired permit.observed sidewalk shed in place w/an expired permit.permit in bis/dobnow expires on 3/28/2014.(exp.#1,2 & 4).aggravated recurring condition:see violations

    Mar 29, 2022 · Penalty $10,000

    Resolve
  • Class - 2

    Sidewalk shed does not meet color specification.observed sidewalk shed(exp.#1,2 & 4)not painted hunter green as per code required. remedy: comply w/code.

    Mar 29, 2022 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to protect pedestrian. at time of my inspection at an abandoned 2 story building construction site i observed a very unsafe sidewalkshed(close) to children schools. sws (1)parapet panels are failling of

    Jul 7, 2020 · Penalty $2,400

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifcations at time of my inspection on a non-activ jobsite was not maintained i observed rotten platform at expo #1 parapet wall was also loose and hanging at expo #1

    Dec 11, 2019 · Penalty $2,400

    Resolve
  • Class - 2

    Temporary construtcion equipment on site expired pemrit at time fo inspetcion of a nb none actiev jobsit e i observed sidewlak shed in place with expired permit 3/28-2014 renew permit

    Dec 11, 2019 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#35354247h issued on 11/15/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible cert

    Oct 15, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Pedestrian protetcion does not meet code specifications.at time of inspection i observed sidewalk shed in place.failure to maintain (1)missing protective caps for bolts(2)the mudsills are damaged and rotted uns

    Dec 27, 2018 · Penalty $2,400

    Resolve
  • Class - 2

    Temporary construction equipment on site-expired permit.at time of inspection i observed sidewalk shed in place.the permit fo rthe shed was expired.recurring condition-complaint #3609702.renew permit comply wit

    Dec 27, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Temporary construction equipment on site- expired permit. note: observed sidewalk shed is in place with expired permit on 03-28-14. recurring condition: see complaint 3657848 and 3609702. rmdy: renew permit

    Nov 15, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification. note: 1.observed sidewalk shed parapet wall sheets are fallen apart. 2.observed sidewalk shed columns bolts are not protected. 3. observed sidewalk shed m

    Nov 15, 2018 · Penalty $2,400

    Resolve
  • Class - 2

    Temporary construction equipment on site: expired permit. note: at time of inspection i observed sidewalk shed on site with an expired permit. permit expired as of date 03/28/2014. remedy: renew permit

    Jul 26, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification. note:at time of inspection i observed sidewalk shed on site with the following objections:damaged/misplaced mudsills-exposed bolts, damaged parapet panels

    Jul 26, 2018 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in sum/vio#35245057y issued on 07/08/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for failure to maintain sidewalk shed. remedy: comply w/comm's orde

    Aug 18, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failed to obtain a temporary construction permit. noted: @ time of insp sidewalk shed on exp#1 w/out permit. rem: obtain permit.

    Jul 17, 2017 · Penalty $300

    Resolve
  • Class - 1

    Sec. 3307.6.5 installation adjustment,maintaince repair. noted: at time of inspection observed sidewalk shed at exp#1 has maintaince deficiencies where the parapet panels have became dislodged & have fallen to

    Jul 8, 2017 · Penalty $8,000

    Resolve
  • Class - 2

    Temporary construction equipment on site expired permit. note: permit#320559935 obtain for construciton sidewalk shed. issued on 10-12-12 has exp on 3-28-14. at time of inspection found sidewalk shed erected

    Mar 27, 2017 · Penalty $2,000

    Resolve
  • Class - 2

    Temporary construction equipoment on site-expired permit.note: permit #320559935 obtain for sidewalk shed expried on 3/289/14. at time of inspection found sidewalk shed erected at exp1 and 4 at stalled construc

    Dec 29, 2016 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to maintain.noted:uopn inspection, debri in site & on sidewalk not removed, fence loose & open.remedy: remove debris/repair fence.

    Sep 19, 2012

    Resolve
  • Class - 1

    Failure to safeguard all persons and prop affected by const operations.noted:upon inspectin metal decking loose & falling onto sidewalk/no sidewalk shed in place for pedestrians.rem:safeguard public+property,re

    Sep 19, 2012

    Resolve
  • Class - 1

    Failure to safeguard public & property affected by construction operations. noted: a stalled construction site has not be properly secured. materials are loose throughout site & several 4ft by 16ft sheets of

    Sep 18, 2012 · Penalty $2,400

    Resolve
  • Class - 2

    Fail to maintain bldg in code compliant manner. noted: on north side of bldg there is exposed & hanging electric wires also at nw corner there is a pile of combustible debris being stored at property line. rem

    Oct 23, 2010 · Penalty $500

    Resolve
  • Class - 2

    Operation of a crane without a cert of on site inspection.@ time of inspection crane working w/o a valid cert of on site inspection(cn).

    Sep 20, 2010 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to safeguard persons & property affected by construction operation upon inspection noted that the metal stripes used for construction of block wall are sticking outward approx 3" to 4" in large # along

    Jun 15, 2010

    Resolve
  • Class - 2

    Sec. bc 28-103.8 matters not provided for upon inspection noted that cracks appeared on exterior block wall extending from 1st fl to 2nd fl approx 30ft from the corner of exp 3 & 4. no engineers report availabl

    Jun 15, 2010

    Resolve
  • Class - 1

    Sec. bc 3307.5.1 failure to provide watch person upon inspection noted no work in progress at site. also noted that no watch person presenet or provided at the site. remedy: provide watch person as per code.

    Jun 15, 2010

    Resolve
  • Class - 1

    Sec. bc 3307.3.2 failure to provide job site fence - upon inspection noted: job site fence not provided in exposure 1 & exposure 4. remedy: stop all work. provide job site fence. call rest for reinspection.

    Jun 15, 2010

    Resolve
  • Class - 1

    Sec. bc 3309.10 failure to provide protection for the roofs of adjoining properties upon inspection noted roof protection not provided on adjacent building at 550 bedford av in exposure 2 & on adjacent building

    Jun 15, 2010

    Resolve
  • Class - 1

    Failure to provide toe board upon inspection noted toe boards not provided along the floor edges on 2nd & 3rd flr. remedy: provide toe board.

    Jun 15, 2010

    Resolve
  • Class - 1

    Sec. bc 3308.1.1 failure to provide vertical safety netting upon inspection noted vertical safety netting not provided along the floor edges in the perimeter of the building on 2nd & 3rd flr. remedy: provide ve

    Jun 15, 2010

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Religious facility (M3)
Year built
1980
Floors
2
Residential units
—
Building area
199,470 ft²
Lot area
50,700 ft²
Zoning
R7-1
Community board
301
Council district
34
Block / lot
2181 / 35
Assessed value
$2,189,700
Landmark / historic district
No

Questions about 540 Bedford Avenue

Who owns 540 Bedford Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Congregation Yetev Lev D'satmar INC..

Does 540 Bedford Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 540 Bedford Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 540 Bedford Avenue built?

City records list 1980 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.