80 Dekalb Avenue is an elevator apartment building built in 2011 in Brooklyn, 11201. It has 365 residential units across 35 floors. The owner of record is Atlas Vi Dekalb LLC. HPD has recorded 17 housing violations here, most recently on April 10, 2026. 4 of the 17 most recent violations are still open. City tax records listed 365 rent-stabilized apartments here in 2024.
- HPD violations
- 17
- DOB violations
- 71
- ECB violations
- 84
- HPD complaints
- 47
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 22m, 22nd story, 1st apartment from south at west
Apr 10, 2026 · Apt 22M
Open — Invalid certification - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 22m, 22nd story, 1st apartment from south at west
Apr 10, 2026 · Apt 22M
Open — Invalid certification - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt apt5a, 5th story, 1st apartment from west at north
Jan 10, 2026 · Apt APT5A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9h, 9th story, 1st apartment from east at south
Oct 12, 2024 · Apt 9H
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum allowable temperature of 130 degrees in the bathroom located at apt 26n, 26th story, 1st apartment from south at west
Jan 19, 2023 · Apt 26N
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 25b, 25th story, 1st apartment from west at north
Jun 20, 2019 · Apt 25B
Closed — Violation closed
Show 7 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 20, 2019
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 20, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jun 20, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 20, 2019
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jun 20, 2019
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 20, 2019
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt pha, 7th story, 1st apartment from west at north
Jun 18, 2019 · Apt PHA
Closed — Violation dismissed
DOB building violations · 71
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2018
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 4, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 2009
Dob violation - resolved
ECB violations · 84
- Class - 1
At time of inspection on a 35 story facade job site i observed a worker on suspended scaffolding at exp.1 with no hardhat and no work boots. workers must wear proper ppe on site at all times. ensure workers are
Apr 3, 2023
Resolve - Class - 1
At time of inspection observed in use suspended scaffolding at exp.1 - when asking the workers on site to provide all required documents - none could be provided. stop all work under permit# b00776984.maintain/
Apr 3, 2023 · Penalty $2,500
Resolve - Class - 1
At time of inspection on a 35 story facade alteration job site i observed in use suspended scaffolding at exp.1. when asking the workers on site for the qsp - i was told he is not on site, the superintendent of
Apr 3, 2023 · Penalty $2,500
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner.note:at time of inspection,observed extensive amount of grease dripping the wall onto the sidewalk from smashburger restaurant at expo.#2 at the above location.
Jun 30, 2021 · Penalty $312
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. stop work order was issued on 10/18/2017 for no plans on site under job #321-634-898 and on 10/25/2017. inspections and work were performed while
Nov 2, 2017 · Penalty $4,800
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection.no approved plans on site and time of inspection first floor store.rem:provide plans.
Oct 18, 2017 · Penalty $530
Resolve - Class - 1
Sec. bc 28-104.8.4 failure to provide tenant protection & safety plan - upon inspection,construction of 34 story nb in progress,the building is enclosed up to roof except hoist run. interior works on various fl
Feb 23, 2010 · Penalty $1,600
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations upon inspection observed recent smoking refuse in several places on 33 & 34th flr of the job site & in violation of nyc fire code.
Feb 23, 2010 · Penalty $6,000
Resolve - Class - 2
Sec. bc28-110-1 failure to provide osha cards for 10hrs course completetion upon inspection,construction work of the building in progress. at time of inspection,found 3 construction worker on 34 x 33 flrs of th
Feb 23, 2010 · Penalty $4,000
Resolve - Class - 1
Failure to provide toe board - upon inspection, construction of nb in progress. at time of inspection noted: toe boards are missing in flr edges in exp 4 from 12 to 34th flr of the bldg. remedy: provide toe
Feb 17, 2010 · Penalty $1,000
Resolve
Show 40 more ↓
- Class - 2
Sidewalk shed does not meet code specifications.observed a sidewalk shed is built on the street beyond the curb.the posts are not protected against displacement by vehicles as per code.remedy:comply the code
Nov 14, 2009 · Penalty $2,400
Resolve - Class - 2
Job site fence not constructed pursuant to subsection on inspection ofabove active site 3 panels 4 x 8 of job site fence missing - public has accessible job site due to missing panels.remedy:repair or replace
Jun 20, 2009 · Penalty $4,000
Resolve - Class - 2
Failure to safeguard public & property affected by construction operations noted: at time of inspection at above active, bldg up to 35th flrconstruction work in progress observed cigarette butts and empty pack
May 15, 2009 · Penalty $1,200
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. note: at time of inspection at above active construction site pouring 34 flr in progress. observed cigarette buts & empty packs,i
Apr 27, 2009 · Penalty $1,200
Resolve - Class - 2
Failure to post dot permit for street/sidewalk closing. noted: at timeof inspection at above active site construction work in progress. observed hoisting operations of material on dekalb between rockwell &
Apr 25, 2009 · Penalty $500
Resolve - Class - 1
Sec. 3303.4.5.1 material stored less 10ft from perimeter of building. note; at time of inspection at above active site construction work in progress. observed material stored less than 10ft from the edge. the
Apr 8, 2009 · Penalty $1,600
Resolve - Class - 1
Sec. 1906.6.1.2 reshores w/i 10ft of facade not secured. note: at time of inspection at above active construction site,construction work in progress. observed several reshores on the 28th flr w/i 10ft & at the
Apr 8, 2009 · Penalty $1,600
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirement. note: at time of inspection at above active construction site,forming 31,observed excessive amount of material formwork,limber,plywood garbage
Apr 8, 2009 · Penalty $4,800
Resolve - Class - 1
Sec. 1906.6.1.2 reshores w/i 10'fl of facade secured from fall: on inspection of above action site,observed reshores on flrs 23,24,25 not banded or secured at edge of building. remedy: secure all reshores w/i
Mar 30, 2009 · Penalty $1,600
Resolve - Class - 1
No toe boaers: on inspection of above active site,observe & no toe boards on vertical nets on flrs 15-24 nets pulled away from zero cable leaving no toe boards for debris. remedy: provide toe boards to code.
Mar 30, 2009 · Penalty $1,000
Resolve - Class - 1
Opening/holes not covered on inspection of above active site,observed uncovered holes & openings throughout building. remedy: cover all opening & holes.
Mar 30, 2009 · Penalty $1,200
Resolve - Class - 2
Sec. bc3308.3 & 27-1021 vertical safety netting/damaged & broken on inspection of above active site. observed vertical nets on all flrs from 10-25 loose from cable - ends open- disconnected from zero cable.
Mar 30, 2009 · Penalty $400
Resolve - Class - 2
Housekeeping on inspection of above active site debris outside vertical nets on all flrs & on flrs 24 & 23 to much debris piles of debris (wood & concrete & garage) in sections of flrs. remedy: maintain adequat
Mar 30, 2009 · Penalty $400
Resolve - Class - 2
Openings holes uncovered or inspection of active site @ 74 dekalb ave holes in decks on 17th-19th flrs openings approx 6/16 remedy: cover all holes in decks call best for ri
Feb 24, 2009 · Penalty $400
Resolve - Class - 1
Failure to safeguard persons & property effected by const operations observed on 19th fl at 74 dekalb ave fl stripped and materials & debris on entre fl with no vertical nets compliant of debris falling from
Feb 24, 2009 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons and property affected by const operations on inspection of 74 dekalb ave active site approx 50 sheets of 4x8 plywood loaded on the edge of the 19th fl ready to be slung fell
Feb 24, 2009 · Penalty $2,400
Resolve - Class - 1
Failure to provide horizontal safety netting as noted: at time of inspection at above active construction bldg up to 15 lf form work for 16 fl in progress & stripping in progress on 14 fl horizontal safety nett
Jan 24, 2009 · Penalty $4,000
Resolve - Class - 2
Opening/holes not covered. as noted: upon inspection at above active construction site observed holes were not covered on 3,4,6 & 10th flr. remedy: cover opening & holes.
Jan 20, 2009 · Penalty $800
Resolve - Class - 2
Failure to safeguard all persons 7 property affected by construction operation. observed recent smoking refuse w/i construction site in violation of nyc fire code 1404.1 smoking refuse observed on 2,3,5,6,7,8,9
Jan 20, 2009 · Penalty $1,200
Resolve - Class - 2
Sec. bc3308.3 & 27-1021(g)(3) vertical safety netting damaged & or/broken. as noted: at time of inspection at above active construction sitebldg up 14 fl &(form) work for 15 flr in progress observed vertical sa
Jan 20, 2009 · Penalty $800
Resolve - Class - 2
Matters not provided for as noted: upon inspection at above active construction site bldg up to 14 fl observed safety strap are installed thru-out the bldg safety strap strap log provided lacking information &
Jan 20, 2009 · Penalty $800
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction no guard rails. as noted: at time of inspection at above active construction site observed there is no guard rail provided at
Jan 20, 2009 · Penalty $2,400
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements as noted: at time of inspection at above active construction site observed excessive amounts of debris (masonry,lumber& rubbish) accumulated th
Jan 20, 2009 · Penalty $800
Resolve - Class - 1
Sec. 1906.6.1.2 failure to secure reshores w/i 10ft of the facade of abuilding. as noted: upon inspection at above active construction site observed reshores were not secure w/i 10 ft from perimeter of building
Jan 20, 2009 · Penalty $1,600
Resolve - Class - 1
Sec. bc 3308.1.3 & 27-1021(a)(6) failure to provide horizontal safety netting. as noted: at time of inspection at above active construction site bldg up to 14 fl form work for 15 fl ib progress observed horizo
Jan 20, 2009 · Penalty $1,600
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. observed recent smoking refuse w/i active construction site in violation of n.y.c. 1404.1 smoking refuse was most prominent on up
Jan 8, 2009 · Penalty $1,200
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operation. as noted at time of inspection on an active construction site. carpenters were preparing form work on the 3rd flr set back. with n
Dec 23, 2008 · Penalty $2,400
Resolve - Class - 1
Sec. 3309.10 - 26-230 failure to provide roof protection for adjoiningbuilding during construction operations upon inspection as observed at the 5th flr level there was no roof protection provided for adjacent
Dec 23, 2008 · Penalty $1,600
Resolve - Class - 2
Failure to provide required vertical netting upon inspection as observed the vertical netting did not extend to the columns leaving at least 10"-18" unprotected some of the netting had holes & in poor condition
Dec 23, 2008 · Penalty $800
Resolve - Class - 1
Failure to maintain & institute safety equipment measures of temporary construction. no toe boards upon inspection as observed the "o" cable was to loose more than 4"-6" deflection in many locations at other lo
Dec 23, 2008 · Penalty $1,000
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. observed recent smoking refuse w/i construction site in violation of nyc fire code 1404.1 upon inspection as observed there were
Dec 23, 2008 · Penalty $1,200
Resolve - Class - 2
Sec 1001.3 27-361 obstruction of required work place exits upon insp as noted there were metal gates planks metal poles & scaffold buckles blocking corridors & ramps on to the hoist on the 7th fl causing a hazz
Dec 9, 2008 · Penalty $800
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. upon inspection as observed there was an excessive amount of debris includinf discarded bldg material and waste food strewn throughout the
Dec 9, 2008 · Penalty $400
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations upon insp as observed recent smoking refuse w/in construction site in violation of nyc fire code 1404.1 smoking refuse observed a
Dec 9, 2008 · Penalty $1,200
Resolve - Class - 1
Failure to institute & maintain safety equipment measures or temporary construction no toe board upon insp as observed there no toe board on the upper fl 3rd-8th the o cable was loose 3"-4" deflection also the
Dec 9, 2008 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in a code compliant manor noted:at time of inspection on active construction site guard rail on 3rd fl setback in disrepair section missing around car elevator 1st fl remedy:repair & re
Nov 25, 2008 · Penalty $1,600
Resolve - Class - 2
Failure to provide approved accepted plans at jobsite at time of inspection noted at active jobsite at time of inspection no approved drawing for cantilever work platform on fls 5 at south and 7 at north & sout
Nov 25, 2008 · Penalty $250
Resolve - Class - 2
Work does not conform to approved construction documents & or approved amendments. as noted: at time of inspection on a active construction site,concrete operation in progress,flr 9 is forming deck,on flrs 4 to
Nov 25, 2008 · Penalty $250
Resolve - Class - 1
Storage of material during construction as noted:on active construction site bldg up 9th fl material is stored within 10ft from edge of slab 6 fl piles 4 fl piles of 4 x 4 wood 5th fl form work rebar sections
Nov 25, 2008 · Penalty $1,600
Resolve - Class - 1
Sec. 3308.1 &27-1022 failure to provide required vertical netting vertical netting needed when construction reaches a stories or 40ft. noted:on active construction site forming 8th flr sections vertical safety
Nov 17, 2008 · Penalty $1,600
Resolve
Complaints
- Unsanitary condition
Pests
Oct 9, 2026 · Apt 10D
Open - Door/window
Window frame
Aug 13, 2026 · Apt 22M
Close - Unsanitary condition
Mold
Aug 13, 2026 · Apt 22M
Close - Water leak
Slow leak
Aug 13, 2026 · Apt 22M
Close - Unsanitary condition
Garbage/recycling storage
Jul 3, 2026 · Apt 11J
Close - Unsanitary condition
Pests
May 19, 2026 · Apt 6DAND1
Close - General
Ventilation system
Apr 8, 2026 · Apt 22M
Close - Paint/plaster
Wall
Apr 8, 2026 · Apt 22M
Close - Water leak
Slow leak
Apr 8, 2026 · Apt 22M
Close - Door/window
Window frame
Apr 8, 2026 · Apt 22M
Close
Show 37 more ↓
- Unsanitary condition
Mold
Apr 8, 2026 · Apt 22M
Close - Safety
Fire escape
Feb 5, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jan 9, 2026 · Apt 28A
Close - Unsanitary condition
Sewage
Dec 30, 2025 · Apt APT5A
Close - Unsanitary condition
Mold
Nov 12, 2025 · Apt 22M
Close - Water leak
Slow leak
Nov 12, 2025 · Apt 22M
Close - Heat/hot water
Entire building
May 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 11, 2024 · Apt 9H
Close - General
Bell/buzzer/intercom
Aug 29, 2024 · Apt NAWHOL
Close - Unsanitary condition
Sewage
Aug 29, 2024 · Apt 5A
Close - Plumbing
Basin/sink
Apr 17, 2024 · Apt 3F
Close - General
Cabinet
Apr 17, 2024 · Apt 3F
Close - Heat/hot water
Entire building
Oct 18, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 27, 2023 · Apt 35D
Close - Heat/hot water
Entire building
Feb 9, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 19, 2023 · Apt 11C
Close - Plumbing
Water supply
Jan 6, 2023 · Apt 26N
Close - Plumbing
Basin/sink
Dec 26, 2022 · Apt 27M
Close - Electric
Power outage
Dec 12, 2022 · Apt BLDG
Close - Electric
Power outage
Dec 12, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 2, 2022 · Apt BLDG
Close - Electric
Power outage
Jul 5, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Plumbing
Steam pipe/riser
Aug 6, 2021 · Apt 7P
Close - Unsanitary condition
Mold
Mar 11, 2021 · Apt 22F
Close - General
Cooking gas
Jun 18, 2019 · Apt 25B
Close - Heat/hot water
Entire building
Jun 17, 2019 · Apt PHA
Close - Heat/hot water
Entire building
Oct 3, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2015 · Apt 4C
Close - Plumbing
Radiator
Mar 29, 2011 · Apt 23L
Close - General
Windows
Dec 22, 2010 · Apt 26P
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2011
- Floors
- 35
- Residential units
- 365
- Building area
- 335,187 ft²
- Lot area
- 13,626 ft²
- Zoning
- C6-4
- Community board
- 302
- Council district
- 35
- Block / lot
- 2094 / 10
- Assessed value
- $38,065,050
- Landmark / historic district
- No
HPD registration #382616, last renewed Aug 5, 2025.
Questions about 80 Dekalb Avenue
Who owns 80 Dekalb Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Atlas Vi Dekalb LLC.
Does 80 Dekalb Avenue have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 80 Dekalb Avenue rent stabilized?
NYC Department of Finance tax bills listed 365 rent-stabilized units here in 2024 (about 100% of its 365 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 80 Dekalb Avenue built?
City records list 2011 as the year it was built.
How many apartments are in 80 Dekalb Avenue?
It has 365 residential units and 370 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.