80 Dekalb Avenue

Brooklyn, NY 11201BBL 3-02094-0010Map

Owner of record: Atlas Vi Dekalb LLC

80 Dekalb Avenue is an elevator apartment building built in 2011 in Brooklyn, 11201. It has 365 residential units across 35 floors. The owner of record is Atlas Vi Dekalb LLC. HPD has recorded 17 housing violations here, most recently on April 10, 2026. 4 of the 17 most recent violations are still open. City tax records listed 365 rent-stabilized apartments here in 2024.

HPD violations
17
DOB violations
71
ECB violations
84
HPD complaints
47

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 10, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
365
About 100% of the building's 365 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 17

  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 22m, 22nd story, 1st apartment from south at west

    Apr 10, 2026 · Apt 22M

    Open — Invalid certification
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 22m, 22nd story, 1st apartment from south at west

    Apr 10, 2026 · Apt 22M

    Open — Invalid certification
  • A

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt apt5a, 5th story, 1st apartment from west at north

    Jan 10, 2026 · Apt APT5A

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 9h, 9th story, 1st apartment from east at south

    Oct 12, 2024 · Apt 9H

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 31, 2023

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding maximum allowable temperature of 130 degrees in the bathroom located at apt 26n, 26th story, 1st apartment from south at west

    Jan 19, 2023 · Apt 26N

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 9, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 9, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 19, 2021

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 25b, 25th story, 1st apartment from west at north

    Jun 20, 2019 · Apt 25B

    Closed — Violation closed
Show 7 more ↓
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jun 20, 2019

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jun 20, 2019

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jun 20, 2019

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Jun 20, 2019

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Jun 20, 2019

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jun 20, 2019

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt pha, 7th story, 1st apartment from west at north

    Jun 18, 2019 · Apt PHA

    Closed — Violation dismissed

DOB building violations · 71

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
Show 40 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 2, 2018

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 4, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 13, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 13, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 13, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 13, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 13, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 13, 2016

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 13, 2010

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2009

    Dob violation - resolved

ECB violations · 84

  • Class - 1

    At time of inspection on a 35 story facade job site i observed a worker on suspended scaffolding at exp.1 with no hardhat and no work boots. workers must wear proper ppe on site at all times. ensure workers are

    Apr 3, 2023

    Resolve
  • Class - 1

    At time of inspection observed in use suspended scaffolding at exp.1 - when asking the workers on site to provide all required documents - none could be provided. stop all work under permit# b00776984.maintain/

    Apr 3, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    At time of inspection on a 35 story facade alteration job site i observed in use suspended scaffolding at exp.1. when asking the workers on site for the qsp - i was told he is not on site, the superintendent of

    Apr 3, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner.note:at time of inspection,observed extensive amount of grease dripping the wall onto the sidewalk from smashburger restaurant at expo.#2 at the above location.

    Jun 30, 2021 · Penalty $312

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order. stop work order was issued on 10/18/2017 for no plans on site under job #321-634-898 and on 10/25/2017. inspections and work were performed while

    Nov 2, 2017 · Penalty $4,800

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans at job site at time of inspection.no approved plans on site and time of inspection first floor store.rem:provide plans.

    Oct 18, 2017 · Penalty $530

    Resolve
  • Class - 1

    Sec. bc 28-104.8.4 failure to provide tenant protection & safety plan - upon inspection,construction of 34 story nb in progress,the building is enclosed up to roof except hoist run. interior works on various fl

    Feb 23, 2010 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations upon inspection observed recent smoking refuse in several places on 33 & 34th flr of the job site & in violation of nyc fire code.

    Feb 23, 2010 · Penalty $6,000

    Resolve
  • Class - 2

    Sec. bc28-110-1 failure to provide osha cards for 10hrs course completetion upon inspection,construction work of the building in progress. at time of inspection,found 3 construction worker on 34 x 33 flrs of th

    Feb 23, 2010 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to provide toe board - upon inspection, construction of nb in progress. at time of inspection noted: toe boards are missing in flr edges in exp 4 from 12 to 34th flr of the bldg. remedy: provide toe

    Feb 17, 2010 · Penalty $1,000

    Resolve
Show 40 more ↓
  • Class - 2

    Sidewalk shed does not meet code specifications.observed a sidewalk shed is built on the street beyond the curb.the posts are not protected against displacement by vehicles as per code.remedy:comply the code

    Nov 14, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Job site fence not constructed pursuant to subsection on inspection ofabove active site 3 panels 4 x 8 of job site fence missing - public has accessible job site due to missing panels.remedy:repair or replace

    Jun 20, 2009 · Penalty $4,000

    Resolve
  • Class - 2

    Failure to safeguard public & property affected by construction operations noted: at time of inspection at above active, bldg up to 35th flrconstruction work in progress observed cigarette butts and empty pack

    May 15, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. note: at time of inspection at above active construction site pouring 34 flr in progress. observed cigarette buts & empty packs,i

    Apr 27, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to post dot permit for street/sidewalk closing. noted: at timeof inspection at above active site construction work in progress. observed hoisting operations of material on dekalb between rockwell &

    Apr 25, 2009 · Penalty $500

    Resolve
  • Class - 1

    Sec. 3303.4.5.1 material stored less 10ft from perimeter of building. note; at time of inspection at above active site construction work in progress. observed material stored less than 10ft from the edge. the

    Apr 8, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 1906.6.1.2 reshores w/i 10ft of facade not secured. note: at time of inspection at above active construction site,construction work in progress. observed several reshores on the 28th flr w/i 10ft & at the

    Apr 8, 2009 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirement. note: at time of inspection at above active construction site,forming 31,observed excessive amount of material formwork,limber,plywood garbage

    Apr 8, 2009 · Penalty $4,800

    Resolve
  • Class - 1

    Sec. 1906.6.1.2 reshores w/i 10'fl of facade secured from fall: on inspection of above action site,observed reshores on flrs 23,24,25 not banded or secured at edge of building. remedy: secure all reshores w/i

    Mar 30, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    No toe boaers: on inspection of above active site,observe & no toe boards on vertical nets on flrs 15-24 nets pulled away from zero cable leaving no toe boards for debris. remedy: provide toe boards to code.

    Mar 30, 2009 · Penalty $1,000

    Resolve
  • Class - 1

    Opening/holes not covered on inspection of above active site,observed uncovered holes & openings throughout building. remedy: cover all opening & holes.

    Mar 30, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Sec. bc3308.3 & 27-1021 vertical safety netting/damaged & broken on inspection of above active site. observed vertical nets on all flrs from 10-25 loose from cable - ends open- disconnected from zero cable.

    Mar 30, 2009 · Penalty $400

    Resolve
  • Class - 2

    Housekeeping on inspection of above active site debris outside vertical nets on all flrs & on flrs 24 & 23 to much debris piles of debris (wood & concrete & garage) in sections of flrs. remedy: maintain adequat

    Mar 30, 2009 · Penalty $400

    Resolve
  • Class - 2

    Openings holes uncovered or inspection of active site @ 74 dekalb ave holes in decks on 17th-19th flrs openings approx 6/16 remedy: cover all holes in decks call best for ri

    Feb 24, 2009 · Penalty $400

    Resolve
  • Class - 1

    Failure to safeguard persons & property effected by const operations observed on 19th fl at 74 dekalb ave fl stripped and materials & debris on entre fl with no vertical nets compliant of debris falling from

    Feb 24, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by const operations on inspection of 74 dekalb ave active site approx 50 sheets of 4x8 plywood loaded on the edge of the 19th fl ready to be slung fell

    Feb 24, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to provide horizontal safety netting as noted: at time of inspection at above active construction bldg up to 15 lf form work for 16 fl in progress & stripping in progress on 14 fl horizontal safety nett

    Jan 24, 2009 · Penalty $4,000

    Resolve
  • Class - 2

    Opening/holes not covered. as noted: upon inspection at above active construction site observed holes were not covered on 3,4,6 & 10th flr. remedy: cover opening & holes.

    Jan 20, 2009 · Penalty $800

    Resolve
  • Class - 2

    Failure to safeguard all persons 7 property affected by construction operation. observed recent smoking refuse w/i construction site in violation of nyc fire code 1404.1 smoking refuse observed on 2,3,5,6,7,8,9

    Jan 20, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Sec. bc3308.3 & 27-1021(g)(3) vertical safety netting damaged & or/broken. as noted: at time of inspection at above active construction sitebldg up 14 fl &(form) work for 15 flr in progress observed vertical sa

    Jan 20, 2009 · Penalty $800

    Resolve
  • Class - 2

    Matters not provided for as noted: upon inspection at above active construction site bldg up to 14 fl observed safety strap are installed thru-out the bldg safety strap strap log provided lacking information &

    Jan 20, 2009 · Penalty $800

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction no guard rails. as noted: at time of inspection at above active construction site observed there is no guard rail provided at

    Jan 20, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements as noted: at time of inspection at above active construction site observed excessive amounts of debris (masonry,lumber& rubbish) accumulated th

    Jan 20, 2009 · Penalty $800

    Resolve
  • Class - 1

    Sec. 1906.6.1.2 failure to secure reshores w/i 10ft of the facade of abuilding. as noted: upon inspection at above active construction site observed reshores were not secure w/i 10 ft from perimeter of building

    Jan 20, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. bc 3308.1.3 & 27-1021(a)(6) failure to provide horizontal safety netting. as noted: at time of inspection at above active construction site bldg up to 14 fl form work for 15 fl ib progress observed horizo

    Jan 20, 2009 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. observed recent smoking refuse w/i active construction site in violation of n.y.c. 1404.1 smoking refuse was most prominent on up

    Jan 8, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operation. as noted at time of inspection on an active construction site. carpenters were preparing form work on the 3rd flr set back. with n

    Dec 23, 2008 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 3309.10 - 26-230 failure to provide roof protection for adjoiningbuilding during construction operations upon inspection as observed at the 5th flr level there was no roof protection provided for adjacent

    Dec 23, 2008 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to provide required vertical netting upon inspection as observed the vertical netting did not extend to the columns leaving at least 10"-18" unprotected some of the netting had holes & in poor condition

    Dec 23, 2008 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain & institute safety equipment measures of temporary construction. no toe boards upon inspection as observed the "o" cable was to loose more than 4"-6" deflection in many locations at other lo

    Dec 23, 2008 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. observed recent smoking refuse w/i construction site in violation of nyc fire code 1404.1 upon inspection as observed there were

    Dec 23, 2008 · Penalty $1,200

    Resolve
  • Class - 2

    Sec 1001.3 27-361 obstruction of required work place exits upon insp as noted there were metal gates planks metal poles & scaffold buckles blocking corridors & ramps on to the hoist on the 7th fl causing a hazz

    Dec 9, 2008 · Penalty $800

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. upon inspection as observed there was an excessive amount of debris includinf discarded bldg material and waste food strewn throughout the

    Dec 9, 2008 · Penalty $400

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations upon insp as observed recent smoking refuse w/in construction site in violation of nyc fire code 1404.1 smoking refuse observed a

    Dec 9, 2008 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to institute & maintain safety equipment measures or temporary construction no toe board upon insp as observed there no toe board on the upper fl 3rd-8th the o cable was loose 3"-4" deflection also the

    Dec 9, 2008 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to maintain bldg in a code compliant manor noted:at time of inspection on active construction site guard rail on 3rd fl setback in disrepair section missing around car elevator 1st fl remedy:repair & re

    Nov 25, 2008 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to provide approved accepted plans at jobsite at time of inspection noted at active jobsite at time of inspection no approved drawing for cantilever work platform on fls 5 at south and 7 at north & sout

    Nov 25, 2008 · Penalty $250

    Resolve
  • Class - 2

    Work does not conform to approved construction documents & or approved amendments. as noted: at time of inspection on a active construction site,concrete operation in progress,flr 9 is forming deck,on flrs 4 to

    Nov 25, 2008 · Penalty $250

    Resolve
  • Class - 1

    Storage of material during construction as noted:on active construction site bldg up 9th fl material is stored within 10ft from edge of slab 6 fl piles 4 fl piles of 4 x 4 wood 5th fl form work rebar sections

    Nov 25, 2008 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3308.1 &27-1022 failure to provide required vertical netting vertical netting needed when construction reaches a stories or 40ft. noted:on active construction site forming 8th flr sections vertical safety

    Nov 17, 2008 · Penalty $1,600

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Oct 9, 2026 · Apt 10D

    Open
  • Door/window

    Window frame

    Aug 13, 2026 · Apt 22M

    Close
  • Unsanitary condition

    Mold

    Aug 13, 2026 · Apt 22M

    Close
  • Water leak

    Slow leak

    Aug 13, 2026 · Apt 22M

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 3, 2026 · Apt 11J

    Close
  • Unsanitary condition

    Pests

    May 19, 2026 · Apt 6DAND1

    Close
  • General

    Ventilation system

    Apr 8, 2026 · Apt 22M

    Close
  • Paint/plaster

    Wall

    Apr 8, 2026 · Apt 22M

    Close
  • Water leak

    Slow leak

    Apr 8, 2026 · Apt 22M

    Close
  • Door/window

    Window frame

    Apr 8, 2026 · Apt 22M

    Close
Show 37 more ↓
  • Unsanitary condition

    Mold

    Apr 8, 2026 · Apt 22M

    Close
  • Safety

    Fire escape

    Feb 5, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jan 9, 2026 · Apt 28A

    Close
  • Unsanitary condition

    Sewage

    Dec 30, 2025 · Apt APT5A

    Close
  • Unsanitary condition

    Mold

    Nov 12, 2025 · Apt 22M

    Close
  • Water leak

    Slow leak

    Nov 12, 2025 · Apt 22M

    Close
  • Heat/hot water

    Entire building

    May 22, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 11, 2024 · Apt 9H

    Close
  • General

    Bell/buzzer/intercom

    Aug 29, 2024 · Apt NAWHOL

    Close
  • Unsanitary condition

    Sewage

    Aug 29, 2024 · Apt 5A

    Close
  • Plumbing

    Basin/sink

    Apr 17, 2024 · Apt 3F

    Close
  • General

    Cabinet

    Apr 17, 2024 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 27, 2023 · Apt 35D

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jan 19, 2023 · Apt 11C

    Close
  • Plumbing

    Water supply

    Jan 6, 2023 · Apt 26N

    Close
  • Plumbing

    Basin/sink

    Dec 26, 2022 · Apt 27M

    Close
  • Electric

    Power outage

    Dec 12, 2022 · Apt BLDG

    Close
  • Electric

    Power outage

    Dec 12, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 2, 2022 · Apt BLDG

    Close
  • Electric

    Power outage

    Jul 5, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2022 · Apt BLDG

    Close
  • Plumbing

    Steam pipe/riser

    Aug 6, 2021 · Apt 7P

    Close
  • Unsanitary condition

    Mold

    Mar 11, 2021 · Apt 22F

    Close
  • General

    Cooking gas

    Jun 18, 2019 · Apt 25B

    Close
  • Heat/hot water

    Entire building

    Jun 17, 2019 · Apt PHA

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2015 · Apt 4C

    Close
  • Plumbing

    Radiator

    Mar 29, 2011 · Apt 23L

    Close
  • General

    Windows

    Dec 22, 2010 · Apt 26P

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
2011
Floors
35
Residential units
365
Building area
335,187 ft²
Lot area
13,626 ft²
Zoning
C6-4
Community board
302
Council district
35
Block / lot
2094 / 10
Assessed value
$38,065,050
Landmark / historic district
No

HPD registration #382616, last renewed Aug 5, 2025.

Questions about 80 Dekalb Avenue

Who owns 80 Dekalb Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Atlas Vi Dekalb LLC.

Does 80 Dekalb Avenue have violations?

Yes. NYC HPD has recorded 17 housing violations at this property.

Is 80 Dekalb Avenue rent stabilized?

NYC Department of Finance tax bills listed 365 rent-stabilized units here in 2024 (about 100% of its 365 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 80 Dekalb Avenue built?

City records list 2011 as the year it was built.

How many apartments are in 80 Dekalb Avenue?

It has 365 residential units and 370 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.