33 Brevoort Place
Brooklyn, NY 11216BBL 3-02017-0051Map
Owner of record: 33 Brevoort LLC
33 Brevoort Place is a walk-up apartment building built in 1930 in Brooklyn, 11216. It has 7 residential units across 4 floors. The owner of record is 33 Brevoort LLC. HPD has recorded 115 housing violations here, most recently on August 1, 2023. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 115
- DOB violations
- 19
- ECB violations
- 5
- HPD complaints
- 111
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 115
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 1, 2023
Closed — Violation dismissed - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the sewerage water flooded approximately 2inches deep throughout at cellar
Aug 1, 2023
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing [brick obstructed building front entrance door] at basement
Aug 1, 2023
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing [ hook and eyelet installed from east wall to vestibule door ]in public hall at basement
Aug 1, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at entrance to cellar stairs 1st from north at east at basement
Aug 1, 2023
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tiles surface, caulking and grouts joints of visible mold at north and west walls around bathtub in the bathroom located at bsmt-apt 1f, 1st story, 1st bsmt-apt from south at west
Aug 1, 2023 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the ceiling in the bathroom located at bsmt-apt 1f, 1st story, 1st bsmt-apt from south at west
Aug 1, 2023 · Apt 1F
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the entire apartment located at bsmt-apt 1f, 1st story, 1st bsmt-apt from south at west
Aug 1, 2023 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at bsmt-apt 1f, 1st story, 1st bsmt-apt from south at west
Aug 1, 2023 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at bsmt-apt 1f, 1st story, 1st bsmt-apt from south at west
Aug 1, 2023 · Apt 1F
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Remove device preventing door from being self-closing [ hook and eyelet installed from east wall to vestibule door ] in public hall, at basement
Jul 31, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at 1st and 2nd stories at public hall
Sep 22, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls at public hall, 2nd story
Sep 22, 2020
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 22, 2020
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective heavy duty lockset at building entrance door , 1st story
Sep 22, 2020
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material, all walls at public hall, 2nd story
Sep 22, 2020
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Sep 22, 2020
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Dec 10, 2017
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing on wall at public hall, 1st story
Dec 10, 2017
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration celotex ceiling installed in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Jun 11, 2015 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 13, 2015
Closed — Violation closed - BHazardous
Properly repair the broken or defective lower sash window at north in the kitchen located at apt 3r, 3rd story
Apr 13, 2015 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder lock instoled on door to backyard located at apt 1r, 1st story
Mar 3, 2014 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder lock instoled on door in the entrance located at apt 1r, 1st story
Mar 3, 2014 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor northwest corner in the 1st room from north located at apt 1r, 1st story
Mar 3, 2014 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north located at apt 1r, 1st story
Mar 3, 2014 · Apt 1R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 1r, 1st story
Mar 3, 2014 · Apt 1R
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1r, 1st story
Mar 3, 2014 · Apt 1R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 1r, 1st story
Mar 3, 2014 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 4r, 4th story, 2nd apartment from south at west
Jul 22, 2012 · Apt 4R
Closed — Violation dismissed - BHazardous
Replace with new the missing bell/buzzer intercom system at bldg. entrance
Jul 22, 2012
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 4r, 4th story, 2nd apartment from south at west
Jul 22, 2012 · Apt 4R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at south wall in the bathroom located at apt 4r, 4th story, 2nd apartment from south at west
Jul 22, 2012 · Apt 4R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 4r, 4th story, 2nd apartment from south at west
Jul 22, 2012 · Apt 4R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls at public hall
Apr 2, 2012
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at public hall
Apr 2, 2012
Closed — Violation closed - BHazardous
Replace with new the missing buzzer system in the entire apartment located at apt 4r, 4th story
Feb 3, 2012 · Apt 4R
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin bedbugs in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west
Jan 27, 2009 · Apt 3F
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1rear, 1st story, 1st apartment from west at north
Dec 21, 2004 · Apt 1REAR
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1rear, 1st story, 1st apartment from west at north
Dec 21, 2004 · Apt 1REAR
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyer located at apt 1rear, 1st story, 1st apartment from west at north
Dec 21, 2004 · Apt 1REAR
Closed — Violation closed - ANon-hazardous
Refit upper and lower sash at east and west window in the 1st room from north located at apt 1rear, 1st story, 1st apartment from west at north
Dec 21, 2004 · Apt 1REAR
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cellulose tiles ceiling in the 1st room from north located at apt 1rear, 1st story, 1st apartment from west at north
Dec 21, 2004 · Apt 1REAR
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1rear, 1st story, 1st apartment from west at north
Dec 21, 2004 · Apt 1REAR
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from north located at apt 1rear, 1st story, 1st apartment from west at north
Dec 21, 2004 · Apt 1REAR
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 1rear, 1st story, 1st apartment from west at north
Dec 21, 2004 · Apt 1REAR
Closed — Violation closed - BHazardous
Provide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler system.
Aug 18, 2004
Closed — Violation closed
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 5
- Non-hazardous
Work w/o a permit:work as noted: at a four storied brick framed structurea heavy duty sidewalk shed has been erected @ the southside front yard of bldg approx. 20' in length and 10' in height. expired permit as
Apr 18, 2006 · Penalty $500
Resolve - Non-hazardous
Work without a permit. expired permit. noted: in that permit number 301605403 issued for sidewalk shed located at front yard of premises expired on 12/16/2004. remedy: renew permit forthwith.
Aug 22, 2005 · Penalty $500
Resolve - Non-hazardous
Failure to maintain exterior building wall. noted: loose and missing bricks around windows at 2nd thru 4th story front facade at various location. (2) holes in wood cornice at front facade of roof level. remedy
Aug 22, 2005 · Penalty $350
Resolve - Non-hazardous
Sidewalk shed does not meet building code specifications. noted: no deck enclosures has been provided at construction bridge that is erected at the front entrance of adjacent building known as number 31 brevoor
Aug 22, 2005 · Penalty $2,000
Resolve - Hazardous
Failure to maintain exterior bldg wall noted: decorative stone lentels missing & fell to ground from seven different windows. brown stone also spalling in several areas throughout fascade. other pieces of mason
Jul 5, 2004 · Penalty $800
Resolve
Complaints
- Water leak
Slow leak
Oct 7, 2023 · Apt 1F
Close - Unsanitary condition
Mold
Oct 7, 2023 · Apt 1F
Close - Unsanitary condition
Pests
Oct 7, 2023 · Apt 1F
Close - Unsanitary condition
Sewage
Oct 7, 2023 · Apt 1F
Close - Electric
Power outage
Jul 31, 2023 · Apt 1F
Close - Electric
Power outage
Jul 29, 2023 · Apt 1F
Close - Door/window
Door
Jan 3, 2019 · Apt 4R
Close - Heat/hot water
Entire building
Dec 10, 2017 · Apt 1R
Close - Heat/hot water
Entire building
Dec 9, 2017 · Apt 1R
Close - Heat/hot water
Entire building
Dec 8, 2017 · Apt 2F
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 11, 2017 · Apt 1F
Close - Heat/hot water
Entire building
Nov 11, 2017 · Apt 1R
Close - Heat/hot water
Apartment only
Nov 2, 2017 · Apt 1F
Close - Heat/hot water
Entire building
Jun 25, 2017 · Apt 1F
Close - Heat/hot water
Entire building
Mar 30, 2017 · Apt 1R
Close - Heat/hot water
Apartment only
Feb 9, 2017 · Apt 1R
Close - Heat/hot water
Apartment only
Jan 16, 2017 · Apt 3F
Close - Heat/hot water
Entire building
Jan 15, 2017 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 15, 2017 · Apt 1F
Close - Heat/hot water
Apartment only
Dec 9, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Oct 26, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2016 · Apt BLDG
Close - General
Janitor/super
Feb 25, 2016 · Apt 4R
Close - General
Bell/buzzer/intercom
Feb 25, 2016 · Apt 4R
Close - Unsanitary condition
Garbage/recycling storage
Apr 26, 2015 · Apt BLDG
Close - Electric
Lighting
Apr 10, 2015 · Apt 4F
Close - Door/window
Window frame
Apr 10, 2015 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Mar 30, 2015 · Apt BLDG
Close - Plumbing
Basin/sink
Feb 20, 2015 · Apt 4R
Close - Heat/hot water
Entire building
Apr 5, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 1, 2014 · Apt BLDG
Close - Plumbing
Boiler
Apr 1, 2014 · Apt 33
Close - Heat/hot water
Entire building
Mar 31, 2014 · Apt 33
Close - Heat/hot water
Entire building
Mar 23, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2014 · Apt BLDG
Close - Heating
Heat related
Mar 7, 2014 · Apt NA
Close - Heating
Heat related
Mar 6, 2014 · Apt 4R
Close - Paint/plaster
Wall
Feb 28, 2014 · Apt 1R
Close - Paint/plaster
Wall
Feb 28, 2014 · Apt 1R
Close - Nonconst
Carbon monoxide
Feb 28, 2014 · Apt 1R
Close - Nonconst
Smoke detector
Feb 28, 2014 · Apt 1R
Close - Heating
Heat related
Dec 1, 2013 · Apt 4F
Close - Heating
Heat related
Jul 26, 2013 · Apt NA
Close - Heating
Heat related
Jun 27, 2013 · Apt 3F
Close - Nonconst
Rubbish
Apr 29, 2013 · Apt 4R
Close - Nonconst
Rubbish
Apr 29, 2013 · Apt 4R
Close - General
Floor
Apr 29, 2013 · Apt 4R
Close - Paint/plaster
Wall
Apr 29, 2013 · Apt 4R
Close - Paint/plaster
Ceiling
Apr 29, 2013 · Apt 4R
Close - Nonconst
Smoke detector
Apr 29, 2013 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1930
- Floors
- 4
- Residential units
- 7
- Building area
- 3,600 ft²
- Lot area
- 1,930 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 2017 / 51
- Assessed value
- $441,900
- Landmark / historic district
- No
Questions about 33 Brevoort Place
Who owns 33 Brevoort Place?
The owner of record in NYC Department of City Planning PLUTO data is 33 Brevoort LLC.
Does 33 Brevoort Place have violations?
Yes. NYC HPD has recorded 115 housing violations at this property.
Is 33 Brevoort Place rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 33 Brevoort Place built?
City records list 1930 as the year it was built.
How many apartments are in 33 Brevoort Place?
It has 7 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.