roofy

262 St James Place

Brooklyn, NY 11238BBL 3-02013-0141Map

Owner of record: 260-262 St. James Investor, LLC

262 St James Place is a walk-up apartment building built in 1930 in Brooklyn, 11238. It has 20 residential units across 5 floors. The owner of record is 260-262 St. James Investor, LLC. HPD has recorded 78 housing violations here, most recently on August 22, 2026. 4 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2024.

HPD violations
78
DOB violations
6
ECB violations
2
HPD complaints
298

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 22, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
14
About 70% of the building's 20 apartments
Down from 15 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 78

  • C

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west

    Aug 22, 2026 · Apt 2D

    Open — Civ14 mailed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at apartment entrance door in the entrance located at apt 2d, 2nd story, 1st apartment from south at west

    Aug 22, 2026 · Apt 2D

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective electrical light switch at north wall in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west

    Aug 1, 2026 · Apt 2D

    Closed — Violation closed
  • B

    Provide an escutcheon plate at heat riser in the 3rd room from east located at apt 2d, 2nd story, 1st apartment from south at west

    Aug 1, 2026 · Apt 2D

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall behind riser in the 3rd room from east located at apt 2d, 2nd story, 1st apartment from south at west

    Aug 1, 2026 · Apt 2D

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west

    Aug 1, 2026 · Apt 2D

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west

    Aug 1, 2026 · Apt 2D

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water exceeds maximum allowed temp of 130 degrees in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west

    Aug 1, 2026 · Apt 2D

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges , 1st story

    Jun 16, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story

    Jun 12, 2026

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective brick and morter joints at bracket 2nd story balcony fire escape at building front

    Jun 9, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance. at public hall, 1st story

    Jun 9, 2026

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures range in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west

    Jul 24, 2025 · Apt 2C

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective fire retarted plaster at ceiling at public hall, 5th story

    Apr 14, 2025

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling at public hall, 5th story

    Apr 14, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story

    Apr 14, 2025

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective fire retarted plaster at north and west wall at public hall, 5th story

    Apr 14, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at north and west wall at public hall, 5th story

    Apr 14, 2025

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling at public hall, 5th story

    Apr 3, 2024

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story

    Apr 3, 2024

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective fire retardant material at south and west walls at public hall, 5th story

    Apr 3, 2024

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective heavy duty alarm-activated lockset at door leading to roof

    Apr 3, 2024

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at the ceiling at public hall, 5th story

    May 12, 2023

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 5th story

    May 12, 2023

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at the ceiling at public hall, 5th story

    May 12, 2023

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    May 12, 2023

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items on 3rd story balcony, at building front stack at fire escape

    Feb 1, 2023

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at east stack building front. at fire escape, 3rd story

    Jan 23, 2023

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items on 2 stiry balcony at fire escape

    Jun 10, 2022

    Closed — Violation closed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts all stories balconies stacks at the front of the building at fire escape

    Jun 10, 2022

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flowers pot on 6th story balcony building front at fire escape

    May 28, 2022

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Feb 22, 2021

    Closed — Violation closed
  • C

    Arrange and make self-closing the doors .. in the entrance located at apt 2c, 2nd story, 2nd apartment from south at west

    Nov 26, 2019 · Apt 2C

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west

    Nov 26, 2019 · Apt 2C

    Open — Violation will be reinspected
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Mar 8, 2019

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Mar 8, 2019

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Nov 30, 2017

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 2nd room from east located at apt 4d, 4th story, 1st apartment from south at west

    Nov 30, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallway located at apt 4d, 4th story, 1st apartment from south at west

    Nov 30, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 4d, 4th story, 1st apartment from south at west

    Nov 30, 2017 · Apt 4D

    Closed — Violation dismissed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 4d, 4th story, 1st apartment from south at west

    Nov 30, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the north wall in the kitchenette located at apt 4d, 4th story, 1st apartment from south at west

    Oct 12, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection ....leaking waste drain pipe at sink in the kitchenette located at apt 4d, 4th story, 1st apartment from south at west

    Oct 12, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). ...missing located at apt 4d, 4th story, 1st apartment from south at west

    Oct 12, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector ....missing located at apt 4d, 4th story, 1st apartment from south at west

    Oct 12, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 4d, 4th story, 1st apartment from east at south

    Sep 13, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 4d, 4th story, 1st apartment from east at south

    Sep 13, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 4d, 4th story, 1st apartment from south at west

    Mar 29, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from east located at apt 4d, 4th story, 1st apartment from south at west

    Mar 29, 2017 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4d, 4th story, 1st apartment from south at west

    Mar 29, 2017 · Apt 4D

    Closed — Violation dismissed

DOB building violations · 6

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations · 2

  • Class - 1

    Cease use boiler=vibrating the building/boiler room light defect/fresh air louvers 1/2 clog/hwh#1 incorrect discharge pipe/storage in gas meter area/no air for gas meter area/correct all hazardous conditions an

    Apr 21, 2021 · Penalty $1,250

    Resolve
  • Non-hazardous

    50/36. 50- misssing "h" stamping on hb smith boiler (gas) no information for safety valve specifacting missing syphon device/pigtail on steam pressure gauge.

    Dec 13, 2005

    Resolve

Complaints

  • Water leak

    Damp spot

    Sep 15, 2026 · Apt 1D

    Close
  • Electric

    Lighting

    Sep 15, 2026 · Apt 1D

    Close
  • Electric

    Lighting

    Sep 15, 2026 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Aug 25, 2026 · Apt 4B

    Close
  • Unsanitary condition

    Pests

    Aug 25, 2026 · Apt 4B

    Close
  • Unsanitary condition

    Mold

    Aug 25, 2026 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Aug 3, 2026 · Apt 2D

    Close
  • Flooring/stairs

    Floor

    Aug 3, 2026 · Apt 2D

    Close
  • Door/window

    Window frame

    Aug 3, 2026 · Apt 2D

    Close
  • Flooring/stairs

    Floor

    Aug 3, 2026 · Apt 2D

    Close
Show 40 more ↓
  • Door/window

    Door frame

    Aug 3, 2026 · Apt 2D

    Close
  • Plumbing

    Water supply

    Jul 31, 2026 · Apt 2D

    Close
  • Plumbing

    Water supply

    Jul 31, 2026 · Apt 2D

    Close
  • Door/window

    Door

    Jun 16, 2026 · Apt 1A

    Close
  • Door/window

    Door

    Jun 16, 2026 · Apt 1A

    Close
  • Door/window

    Door

    Jun 11, 2026 · Apt 3D

    Close
  • Appliance

    Electric/gas range

    Jun 11, 2026 · Apt 3D

    Close
  • Door/window

    Door

    Jun 8, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Jun 8, 2026 · Apt 3A

    Close
  • Door/window

    Door

    Jun 5, 2026 · Apt 3D

    Close
  • Door/window

    Door

    Jun 5, 2026 · Apt 4D

    Close
  • General

    Mailbox

    Jun 5, 2026 · Apt 4D

    Close
  • Door/window

    Door

    Jun 5, 2026 · Apt 2C

    Close
  • Door/window

    Door

    Feb 11, 2026 · Apt LOBBY

    Close
  • General

    Mailbox

    Feb 10, 2026 · Apt 3D

    Close
  • Appliance

    Electric/gas range

    Jul 22, 2025 · Apt 2C

    Close
  • Water leak

    Slow leak

    Apr 12, 2025 · Apt 5THFLO

    Close
  • Paint/plaster

    Ceiling

    Apr 12, 2025 · Apt 5THFLO

    Close
  • Paint/plaster

    Wall

    Apr 12, 2025 · Apt 5THFLO

    Close
  • Paint/plaster

    Ceiling

    Apr 12, 2025 · Apt 5THFLO

    Close
  • Heat/hot water

    Apartment only

    Mar 20, 2025 · Apt APT4A

    Close
  • Water leak

    Slow leak

    Dec 16, 2024 · Apt 5THFLO

    Close
  • Appliance

    Refrigerator

    Oct 17, 2024 · Apt 2D

    Close
  • Unsanitary condition

    Pests

    Oct 17, 2024 · Apt 2D

    Close
  • Paint/plaster

    Ceiling

    Apr 2, 2024 · Apt 5FLOOR

    Close
  • Paint/plaster

    Wall

    Apr 2, 2024 · Apt 5FLOOR

    Close
  • Water leak

    Slow leak

    Apr 2, 2024 · Apt 5FLOOR

    Close
  • Appliance

    Refrigerator

    Jan 13, 2024 · Apt 4D

    Close
  • Appliance

    Electric/gas range

    Jan 13, 2024 · Apt 4D

    Close
  • Appliance

    Electric/gas range

    Jan 12, 2024 · Apt 4D

    Close
  • Appliance

    Electric/gas range

    Nov 27, 2023 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2023 · Apt BLDG

    Close
  • Door/window

    Door

    Jan 28, 2023 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2023 · Apt 2B

    Close
  • Appliance

    Refrigerator

    Jan 26, 2023 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 12, 2023 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Jan 10, 2023 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1930
Floors
5
Residential units
20
Building area
10,060 ft²
Lot area
2,500 ft²
Zoning
R6B
Community board
302
Council district
35
Block / lot
2013 / 141
Assessed value
$868,050
Landmark / historic district
No

HPD registration #341465, last renewed Oct 2, 2025.

Questions about 262 St James Place

Who owns 262 St James Place?

The owner of record in NYC Department of City Planning PLUTO data is 260-262 St. James Investor, LLC.

Does 262 St James Place have violations?

Yes. NYC HPD has recorded 78 housing violations at this property.

Is 262 St James Place rent stabilized?

NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 70% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 262 St James Place built?

City records list 1930 as the year it was built.

How many apartments are in 262 St James Place?

It has 20 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.