139 Flatbush Avenue
Brooklyn, NY 11217BBL 3-02001-7501Map
Owner of record: Metropolitan Transit Auth
139 Flatbush Avenue is a condominium built in 2003 in Brooklyn, 11217. The owner of record is Metropolitan Transit Auth. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 527
- ECB violations
- 46
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 527
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 11, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 13, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 24, 2021
Dob violation - resolved - Elevator elevatorrequired
Cease use
Jul 24, 2021
Dob violation - resolved - Elevator elevatorrequired
Cease use
Jul 24, 2021
Dob violation - resolved - Elevator elevatorrequired
Cease use
Jul 24, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 24, 2021
Dob violation - resolved - Elevator elevatorrequired
Cease use
Jul 24, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 26, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2020
Dob violation - resolved
ECB violations · 46
- Class - 2
Basement level in dsw store, at ceiling level multiple locations throughout missing fireproofing on underside of metal decking, according tocode all exposed metal throughout will be encased/covered with continu
Feb 7, 2025 · Penalty $655
Resolve - Class - 2
Bc 3314.1 side walk shed not maintained. at the time of my inspection of a sidewalk shed that was provided to protect the safety of members of the public and others using side walk, i observed that the vert
May 7, 2024
Resolve - Class - 1
Failure to maintain building in code compliant manner.at basement level mall inside of dsw shoe store,corrugated steel deck and beams in various locations shower water penetrations and missing,show signs of rus
Feb 14, 2022
Resolve - Class - 2
Failure to maintain building in walls & appurtenances.note:crack on limestone panels on exposure#1,west elevation were observed.also observed deteriorate caulkings along movement joints on the same exposure of
Oct 15, 2021 · Penalty $625
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner observed:@mall,bsmt level,dsw store,steeldeck&metal beams in ceiling slab shows signs of corrosion due to water penetration thru pipes penetration&joints of stru
Sep 29, 2021
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner:@bsmt level store "dsw shoes" fireproofing (illegible) &corrugated sheetmetal show signs ofcorroding&missing firestopping called qdock.repair &/or replace.
Jul 14, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner:atoi&observed@bsmt level commercial (illegible) dsw shoe store.1rock coated&steel corrugated fl base rusted whcih around&collapsed,2other areas fireproofing 1roc
Jun 3, 2021
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner.noted:observed@bsmt level@dsw store pieces of fireproofing coated qdock has fallen from ceiling@various locations.repair &/or replace.
Mar 3, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.noted:in the basement at dsw store approx 6"x24" piece of fireproofing coated q dock has fallen from the ceililng.remedy:repair and/or replace.
Jan 31, 2020
Resolve - Class - 1
Failure to maintain building in code compliant manner.at time of inspection approx 6"x24"of fireproofing code 2-docs hts fallen on to ms sales room causing injury to customers w/multiple apts w water making and
Dec 5, 2019
Resolve
Show 36 more ↓
- Class - 1
Cu86i11,cu84i11. 86i11-replce damaged combs; 84i11-replace defective demarcation.
Feb 9, 2019 · Penalty $3,125
Resolve - Class - 1
Cu86i11,cu84i11. 86i11-replace damaged combs; 84i11-replace damaged demarcation.
Feb 9, 2019 · Penalty $3,125
Resolve - Class - 1
100## failure to provide info and cooperate with accident investigation as per bc 3012.1 owner must provide information concerning accident that occurred on 622/18.
Jul 3, 2018 · Penalty $312
Resolve - Class - 2
91m07:cover for emergency stop button broken/missing -provide.
Jun 25, 2018
Resolve - Class - 2
Escalator fails to comply with asmea 17.1/csa or local code when not conveying passengers. comply with code.
Oct 27, 2017 · Penalty $500
Resolve - Class - 2
42b10 escalator fails to have a variable frequency regenerative drive as per section requirements comply with code.
Oct 27, 2017 · Penalty $1,000
Resolve - Class - 2
Escalator fails to have variable frequency regenerative drive as per section requirements.rem:comply w/code.
Oct 27, 2017 · Penalty $1,000
Resolve - Class - 2
42b10:escalator fails to comply with asme 17.1/csa or local code when not conveying passengers.rem:comply w/code
Oct 27, 2017 · Penalty $500
Resolve - Class - 2
91l10,86m07,92j01. 91l-inavoidable; 92j01-ballistrades; 86m-replace with missing teeth.
Jan 5, 2017
Resolve - Class - 1
86i11,89i10,95x10,87d06. 86-two or more teeth missing from comb plate 87-floor not screwed down. 89i-demarcation strips are damaged. 93x- broken main drive chain safety is disabled.
Dec 21, 2016
Resolve - Class - 1
Cease use. 97b07-unsafe use of an escalator. this device is being replaced, however the motot and normal braking device have been removed. the escalator was not properly secured to prevent the steps from moving
Dec 21, 2016 · Penalty $1,000
Resolve - Class - 1
97b07-unsafe use of an escalator.this device is being repaired howeverthe motor & normal braking device have been removed.the escalator was not properly secured to prevent the steps from moving.the pawl brake
Dec 21, 2016
Resolve - Class - 1
100## failure to report on escaltor accident.failure to report an accident promptly. accident occurried on 12/20/16 at escalator. several pedle suffered personnel injuries requiring medical attention.
Dec 20, 2016 · Penalty $1,600
Resolve - Class - 1
*89i11,*87d06,*87q03; 86m11,91q03,100j01. *cease use items.89i-providemissing step threads; 87d,q-secure newell*; 86m-replace combplates where teeth missing; 91q-bottom panel; 100v-adjust abrupt stop/increas
Dec 9, 2015 · Penalty $1,030
Resolve - Class - 1
*89i11,*87d06,*87q03; 86m11,100j01. *cease use items; 89i-provide missing step threads; 87d,q-secure newell*; 86m-repalce combplates with missing teeth; 100j-adjust abrupt stop/increase stepslide.
Dec 9, 2015 · Penalty $1,030
Resolve - Class - 1
Sec. 3310.6 failure to have designated site safety manager on site as required. at the time of my inspection construction work in prgress. an inspection of ssm log book show that ssm #563 has not been on site
Feb 4, 2014 · Penalty $8,000
Resolve - Class - 2
Failed to notify dept/obtain permit. prior to use/install off c-hooks/outrigger beams in connection w/suspended scaffolds. noted: at time ofinspection observed workers on suspended scaffold at exp 2. no cd-5
Dec 2, 2013
Resolve - Class - 2
Failure to provide approved/accepted plans at job site, at time of inspection. premises under pc alt ii 320750086, loc 4.30.13. no plans presented at site for inspection. remedy: obtain approved plans, contact
Jun 3, 2013 · Penalty $530
Resolve - Class - 2
92j01- adjust ballustrades to code.
Jan 9, 2013
Resolve - Class - 2
92j01,86m07,64m07. 92j- adjust per code. 86m- replace plates w/missingteeth.
Jan 9, 2013
Resolve - Class - 1
100#11;cease use item:replace all damaged demarcation stairs before return to service call 212-566-5539.
Jun 21, 2012 · Penalty $1,000
Resolve - Class - 2
Defet is at north west store payless shoes in shopping mall 2nd means of egress west of storefront has illegal hardwar lock installed rem: maintain egress during all business hours make safe install legal hardw
Oct 21, 2011 · Penalty $2,500
Resolve - Class - 2
02x10/69m07/02-x-10-in car emergency phone no inoperative. repair
Apr 10, 2009
Resolve - Class - 2
59y02, 56y02, 56y13, 100#11, 34o02, 39o02, 32h10, 60q03, 52m07, 97v10, 17h11 97v10 elevator releveling w/ doors open 100#11 fire extinguisher in machine rm expired 52m07 provide spun out for hoist rope shackles
Aug 6, 2008
Resolve - Non-hazardous
23d06.23m07
Jun 23, 2008 · Penalty $350
Resolve - Non-hazardous
03x10.19m07.83e10. 03x10 car phone not working 19m07 lobby line gib missing "provide" 83e10 noise in pit area
Jun 23, 2008 · Penalty $350
Resolve - Hazardous
Failure to safe guard public + property effected by construction operations. at time of inspection. there are men working on scaffold on west elevation above a court yard. there is a man inside court yard under
May 14, 2008 · Penalty $800
Resolve - Non-hazardous
Section: c.u.81r11,c.u.83s07,c.u.84m07,55f01,86u05. 81r-tripping hazard(cover opens towards traffic) 83s-transom on its entirety. 84m-barricades 9rule802.3(i)) o5f-drive chain cease use unti items 81r,83s,and
Mar 31, 2008 · Penalty $500
Resolve - Non-hazardous
C.u.79x10,82l11,c.u.83s07,c.u.81r11,c.u.84j01,86u05,c.u.84m07,83u15. 70x-stalling. 82l-top,83s-transom on its entirety 81r-tripping hazard(opens towards traffic) cease use until items 79x,83s,81r,84i,84j, and
Mar 28, 2008 · Penalty $500
Resolve - Hazardous
C.u.76x10,c.u.80i11,84##. 76x-all switches. 80i-all damaged and/or razor sharp steps and demarcation strips as need it. 84# do not use device as means of egress as per rule 27-987 (g)-cease use until items 76x
Mar 25, 2008 · Penalty $2,500
Resolve - Hazardous
C.u.80i11,84##. 80i-all steps and/or demarcation strips,damaged or razor sharp(as need it). 84#-do not use device as means of egress (as perrule 27-987(g() cease use until item 80i is complied with before resto
Mar 25, 2008 · Penalty $2,500
Resolve - Non-hazardous
Failure to post contractor's sign note demolition work being zone w/ permit #301848071 expired on 04/04/05 and no contractor's sign posted. remedy:provide contractor's sign forthwith.
Jan 10, 2005
Resolve - Non-hazardous
Failure to post permit note demolition work being done and sidewalk shed erected w/ permit #301598297 expired on 12/31/05 and not posted on site. remedy:post permit forthwith.
Jan 10, 2005
Resolve - Non-hazardous
Failure to post dot permit to place container on the street upon inspection at the above property demolition was in progress (roof)down and noted:there are dumpsters placed on the street and dof permit was
Dec 23, 2004 · Penalty $400
Resolve - Hazardous
Failure to provide design drawing upon insp at above property noted replacement of the tiles at facade e side on 15th was in progress with using window washing rig and no design drawing has been on site
Apr 21, 2004 · Penalty $200
Resolve - Non-hazardous
Failure to carry out operation in safe and proper manner. upon inspection of above address past of parapet wall(bricks,concrete)fall on the street due to direction operation broken sidewalk shed and car parking
Jan 10, 2004 · Penalty $2,000
Resolve
Complaints
- Unsanitary condition
Pests
Nov 5, 2024 · Apt 11
Close - Heat/hot water
Entire building
Dec 5, 2017 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RC)
- Year built
- 2003
- Floors
- —
- Residential units
- —
- Building area
- 906,158 ft²
- Lot area
- 191,713 ft²
- Zoning
- C6-4
- Community board
- 302
- Council district
- 35
- Block / lot
- 2001 / 7501
- Assessed value
- $104,810,400
- Landmark / historic district
- No
Questions about 139 Flatbush Avenue
Who owns 139 Flatbush Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Metropolitan Transit Auth.
Does 139 Flatbush Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 139 Flatbush Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 139 Flatbush Avenue built?
City records list 2003 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.