262 Gates Avenue
Brooklyn, NY 11238BBL 3-01986-0003Map
Owner of record: 262 Enterprises, LLC
262 Gates Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11238. It has 10 residential units across 4 floors. The owner of record is 262 Enterprises, LLC. HPD has recorded 104 housing violations here, most recently on January 19, 2025. 3 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 104
- DOB violations
- 19
- ECB violations
- 7
- HPD complaints
- 134
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 104
- CImmediately hazardous
Properly repair or replace the broken or defective radiator air valve releasing steam in the 1st room from north located at apt bf, 1st apartment from north at east
Jan 19, 2025 · Apt BF
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt bf, 1st apartment from north at east
Jan 19, 2025 · Apt BF
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at gap at door bottom not to exceed a maximum of 3/4 inches in the closed position in the entrance located at apt bf, 1st apartment from north at east
Jan 19, 2025 · Apt BF
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt bf, 1st apartment from north at east
Jan 19, 2025 · Apt BF
Closed — Violation dismissed - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.
Nov 19, 2023
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of paper boxes at public hall, 4th story
May 4, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 4, 2023
Closed — Violation dismissed - BHazardous
Replace with new the missing vestibule door at public hall, 1st story
May 4, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at entrance door to building at public hall, 1st story
Jan 13, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Jan 13, 2023
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective cracked and spalled brown stone masonry with missing and deteriorated mortar at, brick joints , northwest section, all stories, building front
Jan 13, 2023
Closed — Violation dismissed - BHazardous
Replace with new the missing guardrail above stair opening at west yard
Jan 13, 2023
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrixal wires at missing wall light fixture , southwest section, basement story, west yard
Jan 13, 2023
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. properly secure loose stair tread, 12th from bottom , at balcony , 1st stack , northwest section , at west yard, at fire escape, 2nd story
Jan 13, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Jan 13, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant materials plaster at ceiling at public hall, 1st story
Jan 13, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing glass pane at entrance door to building at front at public hall, 1st story
Jan 13, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective rooten wood cornice at porch , building entrance , at front areaway, 1st story
Jan 13, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 31, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 31, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 31, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Mar 31, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling at public hall, 1st story
Mar 31, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3f, 3rd story, 1st apartment from west at north
Mar 31, 2022 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mail box west wall at public hall, 1st story
Mar 31, 2022
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
May 1, 2019 · Apt 2R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 17, 2018
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood treads 1st, 2nd and 3rd from bottom intermidiate landing at public hall stairs, 2nd story
Sep 19, 2016
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood tread 4th from top at public hall stairs, 1st story
Sep 19, 2016
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 10th metal tread from bottom at west / north fire escape, first story
Aug 10, 2015
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing first metal tread from bottom at west / north fire escape, 2nd story
Aug 10, 2015
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 6th metal tread from bottom at west / north fire escape 3rd story
Aug 10, 2015
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner on3rd story balocony west / north fire escape
Aug 10, 2015
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on 3rd story balocony at west / south fire escape
Aug 10, 2015
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes on the third story balcony of the first stack from north, building west at fire escape
Dec 7, 2013
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes on the third story balcony of the second stack from north, building west at fire escape
Dec 7, 2013
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, apartment at north
Oct 28, 2012 · Apt 2F
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story, apartment at north
Oct 28, 2012 · Apt 2F
Closed — Violation closed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Mar 28, 2007
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. located at apt 1f, 1st story, apartment at west
Mar 28, 2007 · Apt 1F
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Mar 28, 2007
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Mar 28, 2007
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of exposed electrical wires, at ceiling light fixture, in the bathroom located at apt 1f, 1st story, apartment at west
Mar 28, 2007 · Apt 1F
Closed — Violation closed - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Mar 28, 2007
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors , at vestibule, to public hall , 1st story
Mar 28, 2007
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts required
Aug 7, 2006
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Jul 27, 2006 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the broken or defective intercom system from 1 sty. vestibule to in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Jul 27, 2006 · Apt 3R
Closed — Violation closed - ANon-hazardous
Refit door in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Jul 27, 2006 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the missing window at public hall stairs, 4th story
Jul 7, 2006
Closed — Violation closed
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Immediate emergency anythingoptional
Immediately provide approx 30 linear feet of sidewalk shed at the north elevation exposure # 1 & approx. 85 linear feet of sidewalk she d at west elevation exposure #4
May 9, 2022
Dob violation - dismissed - Construction other optional
Emergency work due to deteriorating/loose/hanging cornice, cracked/ spalling window sills and lintels and cracke/spalling concrete eyebrows. at wxp1(north)and 4(west). remedy: immed take and provide safety measures to secure and protect the public and install public protection at exp1(north)and 4(west). make immed repairs
May 4, 2022
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 7
- Class - 2
Failure to maintain building in code-compliant manner.at the time of inspection observed at exposure#1(gate ave)damaged wood cornice,damage window sill & lintels cracked/spalled concrete eyebrows.exposure#4(fra
Jul 14, 2022 · Penalty $310
Resolve - Class - 1
Failure to provide unobstructed exit passageway note:observed at exposure#4(franklin ave)multiple level fire escapes obstructed by flower pots and other materials.rem:remove obstruction.
Jul 14, 2022 · Penalty $312
Resolve - Class - 1
Failure to provide unobstructed exit passageway.note:observed at exp.#4(west)multiple fire escapes obstructed by flowere pots & other materials.remedy:remove obstructions.
May 4, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner.note:observed at exp#1(north)deteriorating wood cornice cracked/spalling window sills & lintels & cracked/spalling concrete eyebrows.exp.#4(west)loose/hanging
May 4, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances note wood partico above man entrance porch at 1st floor front has wood structural members missing and hanging loosely in danger of failure the wood partico roof s
Oct 7, 2010 · Penalty $2,500
Resolve - Class - 3
50a. 50a)no sign posted in lobby for the location of keys to the boiler room.
Dec 26, 2009 · Penalty $500
Resolve - Hazardous
Failure to maintain bldg as noted:@ a (5) storied brick framed structure the ceiling of the bathroom @ apt 3r has collapsed on to a water condition @ the roof level with ponding seriously @ various locations
Jul 5, 2006
Resolve
Complaints
- Heat/hot water
Entire building
Nov 2, 2025 · Apt BF
Close - Safety
Smoke detector
Jan 18, 2025 · Apt BF
Close - Door/window
Door frame
Jan 18, 2025 · Apt BF
Close - Safety
Carbon monoxide detector
Jan 18, 2025 · Apt BF
Close - Plumbing
Steam pipe/riser
Jan 18, 2025 · Apt BF
Close - Heat/hot water
Entire building
Nov 18, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2023 · Apt 2R
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close - Water leak
Heavy flow
May 3, 2023 · Apt 4R
Close - Door/window
Door to dumbwaiter
May 3, 2023 · Apt 4R
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Plumbing
Water supply
Oct 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Appliance
Electric/gas range
Sep 17, 2022 · Apt 4R
Close - Appliance
Electric/gas range
Mar 19, 2022 · Apt 3F
Close - General
Mailbox
Mar 19, 2022 · Apt 3F
Close - Heat/hot water
Apartment only
Mar 4, 2022 · Apt 1R
Close - Heat/hot water
Entire building
Feb 14, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 11, 2022 · Apt 1R
Close - Flooring/stairs
Floor
May 6, 2021 · Apt 3R
Close - Water leak
Slow leak
Jul 10, 2020 · Apt 3R
Close - Heat/hot water
Apartment only
Oct 19, 2019 · Apt 4F
Close - Heat/hot water
Entire building
Oct 19, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 18, 2019 · Apt 4F
Close - Heat/hot water
Entire building
May 1, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 29, 2019 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Mar 29, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 23, 2018 · Apt 4R
Close - Unsanitary condition
Pests
Nov 5, 2017 · Apt 4F
Close - Flooring/stairs
Floor
Nov 5, 2017 · Apt 4F
Close - Paint/plaster
Ceiling
Nov 5, 2017 · Apt 4F
Close - Flooring/stairs
Floor
Nov 5, 2017 · Apt 4F
Close - Flooring/stairs
Stairs
Jul 22, 2017 · Apt BLDG
Close - Flooring/stairs
Stairs
Jul 22, 2017 · Apt BLDG
Close - Flooring/stairs
Floor
Apr 26, 2017 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 26, 2017 · Apt BLDG
Close - Flooring/stairs
Floor
Apr 26, 2017 · Apt BLDG
Close - Flooring/stairs
Floor
Apr 26, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 4, 2015 · Apt BF
Close - Heat/hot water
Entire building
Nov 23, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 7, 2014 · Apt BLDG
Close - Heating
Heat related
Dec 2, 2013 · Apt BF
Close - Heating
Heat related
Dec 1, 2013 · Apt NA
Close - Heating
Heat related
Dec 1, 2013 · Apt BF
Close - Heating
Heat related
Apr 12, 2012 · Apt BLDG
Close - Heating
Heat related
Jan 24, 2012 · Apt BR
Close - Plumbing
Water-leaks
Oct 30, 2011 · Apt BSMT
Close - Plumbing
Water-leaks
Oct 30, 2011 · Apt BSMT
Close - Electric
Electric-supply
Jun 20, 2011 · Apt 1F
Close - Heating
Heat related
Oct 30, 2010 · Apt 4R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 10
- Building area
- 6,414 ft²
- Lot area
- 1,670 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1986 / 3
- Assessed value
- $786,600
- Landmark / historic district
- No
HPD registration #340460, last renewed Aug 23, 2025.
Questions about 262 Gates Avenue
Who owns 262 Gates Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 262 Enterprises, LLC.
Does 262 Gates Avenue have violations?
Yes. NYC HPD has recorded 104 housing violations at this property.
Is 262 Gates Avenue rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 50% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 262 Gates Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 262 Gates Avenue?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.