90 Downing Street
Brooklyn, NY 11238BBL 3-01982-0069Map
Owner of record: Ds-Cref3 Clinton Senior Propco LLC
90 Downing Street is a walk-up apartment building built in 1930 in Brooklyn, 11238. It has 41 residential units across 6 floors. The owner of record is Ds-Cref3 Clinton Senior Propco LLC. HPD has recorded 633 housing violations here, most recently on September 30, 2026. 17 of the 50 most recent violations are still open. City tax records listed 39 rent-stabilized apartments here in 2024.
- HPD violations
- 633
- DOB violations
- 35
- ECB violations
- 17
- HPD complaints
- 835
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 633
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than 4 inches out of the window at 1st stack from west at east wall at building front at fire escape, 4th story
Sep 30, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at bulkhead door , 5th story
Sep 22, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st private hallway from north at east located at apt 22, 3rd story, 1st apartment from south at west
Sep 3, 2026 · Apt 22
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east, west, and south walls in the 1st private hallway from north at east located at apt 22, 3rd story, 1st apartment from south at west
Sep 3, 2026 · Apt 22
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 22, 3rd story, 1st apartment from south at west
Sep 3, 2026 · Apt 22
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 22, 3rd story, 1st apartment from south at west
Sep 3, 2026 · Apt 22
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at west located at apt 22, 3rd story, 1st apartment from south at west
Sep 3, 2026 · Apt 22
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at west located at apt 22, 3rd story, 1st apartment from south at west
Sep 3, 2026 · Apt 22
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 22, 3rd story, 1st apartment from south at west
Sep 3, 2026 · Apt 22
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south, and west walls in the 1st room from north at west located at apt 22, 3rd story, 1st apartment from south at west
Sep 3, 2026 · Apt 22
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 10, 2nd story, 2nd apartment from east at south
Aug 27, 2026 · Apt 10
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 4th room from north at east located at apt 10, 2nd story, 2nd apartment from east at south
Aug 27, 2026 · Apt 10
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at bulkhead door at public hall stairs, 5th story
Aug 27, 2026
Closed — Violation closed - BHazardous
Remove the illegal fastening key operated lock installed at bulkhead door at public hall stairs, 5th story
Aug 27, 2026
Open — Nov certified on time - BHazardous
Remove all encumbrances consisting of shoe rack and household items at public hall, 4th story
Aug 27, 2026
Open — Nov certified on time - BHazardous
Remove all encumbrances consisting of bicycles at public hall, 3rd story
Aug 27, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash, at north wall window in the 1st room from north at east located at apt 31, 4th story, 2nd apartment from west at north
Aug 27, 2026 · Apt 31
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 15, 2nd story, 1st apartment from west at north
Jul 8, 2026 · Apt 15
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 15, 2nd story, 1st apartment from west at north
Jul 8, 2026 · Apt 15
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of hanging electrical wiring at ceiling in the private hallway located at apt 15, 2nd story, 1st apartment from west at north
Jul 8, 2026 · Apt 15
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at north wall in the 1st room from north at east located at apt 15, 2nd story, 1st apartment from west at north
Jul 8, 2026 · Apt 15
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the 1st room from north at east located at apt 15, 2nd story, 1st apartment from west at north
Jul 8, 2026 · Apt 15
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 15, 2nd story, 1st apartment from west at north
Jul 8, 2026 · Apt 15
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 15, 2nd story, 1st apartment from west at north
Jul 8, 2026 · Apt 15
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 square feet at nort , south , east and west wall in the bathroom located at apt 15, 2nd story, 1st apartment from west at north
Jul 8, 2026 · Apt 15
Open — Defect letter issued - BHazardous
Remove all encumbrances consisting of bicyles at public hall, 3rd story
Apr 21, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor throughout in the private hallway located at apt 34, 5th story, 1st apartment from east at south
Apr 21, 2026 · Apt 34
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 34, 5th story, 1st apartment from east at south
Apr 21, 2026 · Apt 34
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts and stories fire escape at rear
Apr 21, 2026
Open — Not complied with - BHazardous
Remove all encumbrances consisting of bicyles at public hall, 5th story
Apr 21, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the private hallway located at apt 26, 4th story, 1st apartment from east at south
Feb 13, 2025 · Apt 26
Closed — Violation closed - BHazardous
Properly secure the loose upper cabinets at north wall in the kitchen located at apt 26, 4th story, 1st apartment from east at south
Feb 13, 2025 · Apt 26
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 26, 4th story, 1st apartment from east at south
Feb 13, 2025 · Apt 26
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 26, 4th story, 1st apartment from east at south
Feb 13, 2025 · Apt 26
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling in the 1st room from north located at apt 26, 4th story, 1st apartment from east at south
Feb 13, 2025 · Apt 26
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... (hinges) in the entrance located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wooden floor (sloping) in the 2nd room from east at south located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the kitchen located at apt 26, 4th story, 1st apartment from east at south
Sep 20, 2024 · Apt 26
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 26, 4th story, 1st apartment from east at south
Sep 20, 2024 · Apt 26
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the private hallway located at apt 26, 4th story, 1st apartment from east at south
Sep 20, 2024 · Apt 26
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the foyer located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood trim at east doorway in the bathroom located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the bathroom located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the steam riser at west wall in the bathroom located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the private hallway located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, east, south, and west walls in the kitchen located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Replace with new the missing strikeplate at entrance doorway in the 2nd room from east at south located at apt 2, 1st story, 2nd apartment from east at south
Sep 20, 2024 · Apt 2
Closed — Violation dismissed
DOB building violations · 35
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 25 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 22, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 22, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 14, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 11, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 8, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 24, 1991
Vp*-violation unserved ecb- dismissed
ECB violations · 17
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000071505y0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Sep 27, 2024 · Penalty $625
Active - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000071505y0002 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Sep 27, 2024 · Penalty $625
Active - Class - 2
Failure to comply with commissioner's order contained in summons/violation #35581507p issued 10/15/21 and file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain.remedy:comply w
Dec 2, 2021
Resolve - Class - 1
Failure to maintain:at apt 15 a 4' x 6' of lathe & plaster collapsed from ceiling in living room to grade injuring 2 people.remedy:repair and/or replace
Oct 15, 2021
Resolve - Class - 1
Misc violation: gas connector shall not be concealed within or extended through walls floors, partitions ceilings or appliance housing.at time of inspection (1:30pm) i observed in apt labed 9 a gas fired stov
Dec 15, 2016 · Penalty $1,600
Resolve - Class - 2
Unapproved unsafe unsuitable eletrical equipment devices apparatus appliance materials or wiring in use. defective outlets in apt 26 and defetive fixtures and wiring throughout apt 10 and throughout basement
Dec 14, 2016 · Penalty $2,000
Resolve - Class - 1
Failure to provide unobstructed exit/egress: noted: @ 4th flr (rear) fire escape, access to the fire escape stairs is blocked by a wooden beam attached to fire escape landing structure. rem: remove obstruction.
Dec 14, 2016 · Penalty $500
Resolve - Class - 1
Failure to ground electrical systems. no ground conductor provided to service switch in basement. provide grounding.
Dec 14, 2016 · Penalty $12,000
Resolve - Class - 2
Failure to maintain adequate housekeeping per, section requirements. noted: @ apt#22, excessive bags of debris & materials stored throughoutapt area, obstructing access throughout & causing possible tripping ha
Dec 14, 2016 · Penalty $4,000
Resolve - Class - 2
Electrical work w/o a permit. observed at 12pm new branch wiring circuit installed in apt 9 for outlets fixtures and switches also feeders in basement. no applicaiton on file for new electric work.rmdy:obtain p
Dec 14, 2016
Resolve
Show 7 more ↓
- Class - 2
Unapproved unsafe unsuitable electrical equipment devices appliances apparatus materials of wiring in use. defective fixture & wiring in bedroom socket is burnt out in fixture(apt 19). remedy: comply w/ec code.
Dec 5, 2016 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code compliant manner: in lobby 3'x5' section of plaster delaminated from ceiling & fell to grade. remedy: repair &/or replace.
Apr 15, 2016 · Penalty $1,000
Resolve - Class - 3
Failure to maintain building walls &/or appurtenances. on exposures 1 & 2 observed many various hair line cracks both horizontal & vertical . slight bulging at various window at lintal areas. various (covering)
Aug 16, 2012 · Penalty $200
Resolve - Class - 3
Failure to maintain bldg in code compliant manner.defect is water is leaking into apt#33 causing water damage to ceiling and walls in livingroom also bathroom ceiling has water damage living room flr is slaggin
Apr 29, 2011 · Penalty $200
Resolve - Class - 2
Failure to maintain defect is in that their are numerous cracks in theceiling & walls in the bedrooms & living room in apt #31 on the 4th flr. remedy: repair & or replace make all necessary repairs.
Aug 14, 2009
Resolve - Non-hazardous
36,bq9.
Oct 17, 2000 · Penalty $350
Resolve - Non-hazardous
36,4a. (bq9)(27-147) code section work without permit.
Jan 5, 1999 · Penalty $1,300
Resolve
Complaints
- Unsanitary condition
Mold
Jul 6, 2026 · Apt 15
Close - Unsanitary condition
Pests
Jul 6, 2026 · Apt 15
Close - Door/window
Window frame
May 23, 2026 · Apt APT34
Close - Door/window
Window frame
May 23, 2026 · Apt APT34
Close - Door/window
Window frame
May 23, 2026 · Apt APT34
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 7, 2026 · Apt 9
Close - Unsanitary condition
Pests
Jan 7, 2026 · Apt 9
Close
Show 40 more ↓
- Unsanitary condition
Mold
Apr 29, 2025 · Apt 31
Close - Door/window
Window frame
Apr 29, 2025 · Apt 31
Close - Water leak
Slow leak
Apr 29, 2025 · Apt 31
Close - Door/window
Door
Apr 29, 2025 · Apt 31
Close - Plumbing
Basin/sink
Apr 29, 2025 · Apt 31
Close - Unsanitary condition
Pests
Apr 29, 2025 · Apt 31
Close - Paint/plaster
Wall
Apr 29, 2025 · Apt 31
Close - Paint/plaster
Wall
Apr 29, 2025 · Apt 31
Close - Flooring/stairs
Floor
Apr 29, 2025 · Apt 31
Close - Door/window
Door
Apr 29, 2025 · Apt 31
Close - General
Cabinet
Apr 29, 2025 · Apt 31
Close - Heat/hot water
Apartment only
Feb 9, 2025 · Apt 1D
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Sep 14, 2024 · Apt 2
Close - Paint/plaster
Wall
Sep 10, 2024 · Apt 26
Close - Paint/plaster
Ceiling
Sep 10, 2024 · Apt 26
Close - Water leak
Damp spot
Sep 10, 2024 · Apt 26
Close - Flooring/stairs
Floor
Sep 10, 2024 · Apt 26
Close - Paint/plaster
Ceiling
Jul 20, 2024 · Apt 22
Close - Paint/plaster
Ceiling
Jul 5, 2024 · Apt 22
Close - Water leak
Slow leak
Mar 12, 2024 · Apt 33
Close - Heat/hot water
Entire building
Feb 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 17, 2024 · Apt BLDG
Close - Water leak
Heavy flow
Jan 31, 2024 · Apt 33
Close - Water leak
Heavy flow
Jan 10, 2024 · Apt 33
Close - Heat/hot water
Entire building
Nov 13, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 13, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 12, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 12, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 12, 2022 · Apt BLDG
Close - General
Cabinet
Dec 13, 2021 · Apt 34
Close - Paint/plaster
Ceiling
Dec 13, 2021 · Apt 34
Close - Door/window
Door
Dec 13, 2021 · Apt 34
Close - Flooring/stairs
Floor
Dec 13, 2021 · Apt 34
Close - Paint/plaster
Wall
Dec 13, 2021 · Apt 34
Close - Unsanitary condition
Mold
Dec 13, 2021 · Apt 34
Close - Heat/hot water
Entire building
Nov 10, 2021 · Apt 18
Close - Heat/hot water
Entire building
Nov 10, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2021 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1930
- Floors
- 6
- Residential units
- 41
- Building area
- 37,100 ft²
- Lot area
- 7,950 ft²
- Zoning
- R6B
- Community board
- 302
- Council district
- 35
- Block / lot
- 1982 / 69
- Assessed value
- $1,709,550
- Landmark / historic district
- No
HPD registration #347404, last renewed Jul 15, 2026.
Questions about 90 Downing Street
Who owns 90 Downing Street?
The owner of record in NYC Department of City Planning PLUTO data is Ds-Cref3 Clinton Senior Propco LLC.
Does 90 Downing Street have violations?
Yes. NYC HPD has recorded 633 housing violations at this property.
Is 90 Downing Street rent stabilized?
NYC Department of Finance tax bills listed 39 rent-stabilized units here in 2024 (about 95% of its 41 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 90 Downing Street built?
City records list 1930 as the year it was built.
How many apartments are in 90 Downing Street?
It has 41 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.