119 Cambridge Place
Brooklyn, NY 11238BBL 3-01981-0015Map
Owner of record: 119 Cambridge Place LLC
119 Cambridge Place is a walk-up apartment building built in 1879 in Brooklyn, 11238. It has 9 residential units across 5 floors. The owner of record is 119 Cambridge Place LLC. HPD has recorded 41 housing violations here, most recently on May 4, 2026. 21 of the 41 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 41
- DOB violations
- 9
- ECB violations
- 1
- HPD complaints
- 70
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Closed — Violation dismissed - BHazardous
Properly secure the loose hand rail at public hall, 1st story
Feb 19, 2021
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in wasteline at sink in the kitchen located at apt 7, 3rd story, 1st apartment from east at south
Feb 19, 2021 · Apt 7
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective shut off valve at radiator in the 1st room from north located at apt 7, 3rd story, 1st apartment from east at south
Feb 19, 2021 · Apt 7
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling light fixture in the bathroom located at apt 7, 3rd story, 1st apartment from east at south
Feb 19, 2021 · Apt 7
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 7, 3rd story, 1st apartment from east at south
Feb 19, 2021 · Apt 7
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 7, 3rd story, 1st apartment from east at south
Feb 19, 2021 · Apt 7
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 17, 2019
Closed — Violation dismissed
Show 31 more ↓
- ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 17, 2019
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bottom rail at lower window sash in the entire apartment located at apt 7, 3rd story, apartment at east
Mar 25, 2019 · Apt 7
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 7, 3rd story, apartment at east
Mar 25, 2019 · Apt 7
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective lock at building entrance door , 1st story
Mar 25, 2019
Closed — Violation closed - BHazardous
Properly secure the loose wooden tread 2nd up at basement at public hall stairs
Mar 25, 2019
Closed — Violation dismissed - BHazardous
Remove the torn and/or loose floor covering [carpet] all stories at public hall stairs
Mar 25, 2019
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling all stories at public hall
Mar 25, 2019
Closed — Violation dismissed - BHazardous
Replace with new the missing handrail at stairs of building front
Feb 21, 2018
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4, 1st story, apartment at south
Mar 23, 2016 · Apt 4
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall over bathtub in the bathroom located at apt 4, 1st story, apartment at south
Mar 23, 2016 · Apt 4
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at the north and east walls around the bath tub in the bathroom located at apt 4, 1st story, apartment at south
Mar 23, 2016 · Apt 4
Closed — Violation closed - BHazardous
Repair the broken or defective connection wastline in the kitchen located at apt 7, 3rd story, apartment at east
Dec 9, 2013 · Apt 7
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 7, 3rd story, apartment at east
Dec 9, 2013 · Apt 7
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the bathroom located at apt 7, 3rd story, apartment at east
Dec 9, 2013 · Apt 7
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around window frame in the 1st room from east located at apt 7, apartment at east
Dec 9, 2013 · Apt 7
Open — Nov sent out - ANon-hazardous
Refit lower and upper window sash in the entire apartment located at apt 9, 4th story, 1st apartment from east at south
Jan 14, 2007 · Apt 9
Open — Nov sent out - BHazardous
Provide temporary securing of vacant apartment door 3rd story south apt. 8
Jun 27, 2006
Open — Nov certified late - BHazardous
Replace with new the missing up and down mechanical stopper bathtub in the bathroom located at apt 7, 3rd story, apartment at north
Jun 27, 2006 · Apt 7
Open — Nov certified late - BHazardous
Repair the leaky and/or defective faucets bathtub in the bathroom located at apt 7, 3rd story, apartment at north
Jun 27, 2006 · Apt 7
Open — Nov sent out - BHazardous
Replace with new the missing overflow at bathtub in the bathroom located at apt 7, 4th story, 1st apartment from north at east
May 27, 2006 · Apt 7
Open — Nov certified late - ANon-hazardous
Refit the strike plate of locking assembly at vestibule entrance door to building at public hall, 1st story
Jan 30, 2003
Open — Nov sent out - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk. yard, 1st story
Jan 30, 2003
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the private hallway located at apt 7, 3rd story
Jan 30, 2003 · Apt 7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective splintering wood floors throughout in the entire apartment located at apt 7, 3rd story
Jan 30, 2003 · Apt 7
Open — Nov sent out - BHazardous
Properly secure the loose ceiling light fixtures throughout in the entire apartment located at apt 7, 3rd story
Jan 30, 2003 · Apt 7
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings throughoput in the entire apartment located at apt 7, 3rd story
Jan 30, 2003 · Apt 7
Open — Nov sent out - BHazardous
Properly secure the loose light fixture at ceiling in the bathroom located at apt 7, 4th story, 1st apartment from south at west
Nov 17, 2002 · Apt 7
Open — Nov sent out - BHazardous
Properly secure the loose light fixture at ceiling in the kitchen located at apt 7, 4th story, 1st apartment from south at west
Nov 17, 2002 · Apt 7
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of partial pvc pipeing fo the wasteline at the wash basin in the bathroom located at apt 8, 4th story
Nov 1, 2002 · Apt 8
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 8, 4th story
Nov 1, 2002 · Apt 8
Open — Nov sent out - ANon-hazardous
M/d law abate the nuisance consisting of evidence of a concealed water leak from the ceiling in the bathroom located at apt 8, 4th story
Nov 1, 2002 · Apt 8
Open — Nov sent out
DOB building violations · 9
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Landmark none
Landmk-landmark none
Feb 24, 2004
Dob violation - dismissed - Landmark none
Landmk-landmark none
Feb 24, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 1
- Non-hazardous
Failing to maintain exterior of building in that brownstone has fallen from above 3 story window at front south. remedy: repair all defective and loose masonary brownstone at front fascia.
Oct 21, 1989 · Penalty $125
Resolve
Complaints
- Paint/plaster
Ceiling
Feb 9, 2021 · Apt 7
Close - Plumbing
Basin/sink
Feb 9, 2021 · Apt 7
Close - Door/window
Window frame
Feb 9, 2021 · Apt 7
Close - Electric
Lighting
Feb 9, 2021 · Apt 7
Close - Plumbing
Radiator
Feb 9, 2021 · Apt 7
Close - Plumbing
Basin/sink
Feb 9, 2021 · Apt 7
Close - Appliance
Electric/gas range
Feb 9, 2021 · Apt 7
Close - Door/window
Door frame
Feb 9, 2021 · Apt 7
Close - Appliance
Electric/gas range
Feb 9, 2021 · Apt 7
Close - Door/window
Door
Feb 9, 2021 · Apt 7
Close
Show 40 more ↓
- Door/window
Door
Feb 9, 2021 · Apt 7
Close - Flooring/stairs
Stairs
Feb 9, 2021 · Apt 7
Close - Flooring/stairs
Stairs
Feb 9, 2021 · Apt 7
Close - Electric
Power outage
Jul 28, 2019 · Apt 7
Close - Electric
Power outage
Jul 21, 2019 · Apt 7
Close - Appliance
Electric/gas range
Mar 21, 2019 · Apt 7
Close - Door/window
Window frame
Mar 21, 2019 · Apt 7
Close - Paint/plaster
Ceiling
Mar 21, 2019 · Apt 7
Close - Flooring/stairs
Stairs
Mar 21, 2019 · Apt 7
Close - Paint/plaster
Wall
Mar 21, 2019 · Apt 7
Close - Paint/plaster
Wall
Mar 21, 2019 · Apt 7
Close - Paint/plaster
Ceiling
Mar 21, 2019 · Apt 7
Close - Paint/plaster
Wall
Mar 21, 2019 · Apt 7
Close - Door/window
Door
Mar 21, 2019 · Apt 7
Close - Paint/plaster
Wall
Mar 21, 2019 · Apt 7
Close - Flooring/stairs
Stairs
Mar 21, 2019 · Apt 7
Close - Door/window
Window frame
Mar 21, 2019 · Apt 7
Close - Flooring/stairs
Stairs
Feb 18, 2018 · Apt 7
Close - Flooring/stairs
Stairs
Feb 18, 2018 · Apt 7
Close - Flooring/stairs
Floor
Dec 3, 2017 · Apt APT7
Close - Paint/plaster
Wall
Mar 16, 2016 · Apt 4
Close - Paint/plaster
Ceiling
Mar 16, 2016 · Apt 4
Close - Water leak
Damp spot
Mar 16, 2016 · Apt 4
Close - Unsanitary condition
Mold
Mar 16, 2016 · Apt 4
Close - Paint/plaster
Wall
Mar 16, 2016 · Apt 4
Close - Paint/plaster
Ceiling
Dec 5, 2013 · Apt 7
Close - Plumbing
Basin/sink
Dec 5, 2013 · Apt 7
Close - General
Stairs
Dec 5, 2013 · Apt 7
Close - Nonconst
Vermin
Dec 5, 2013 · Apt 7
Close - Nonconst
Vermin
Dec 5, 2013 · Apt 7
Close - Nonconst
Vermin
Dec 5, 2013 · Apt 7
Close - Paint/plaster
Wall
Dec 5, 2013 · Apt 7
Close - Paint/plaster
Ceiling
Dec 5, 2013 · Apt 7
Close - Heating
Heat related
Feb 25, 2012 · Apt 1
Close - Nonconst
Vermin
May 28, 2011 · Apt 7
Close - General
Floor
May 28, 2011 · Apt 7
Close - Electric
Lighting
May 28, 2011 · Apt 7
Close - Nonconst
Vermin
May 28, 2011 · Apt 7
Close - Plumbing
Bathtub/shower
May 28, 2011 · Apt 7
Close - Nonconst
Vermin
May 26, 2011 · Apt 7
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1879
- Floors
- 5
- Residential units
- 9
- Building area
- 4,410 ft²
- Lot area
- 2,100 ft²
- Zoning
- R6B
- Community board
- 302
- Council district
- 35
- Block / lot
- 1981 / 15
- Assessed value
- $779,400
- Landmark / historic district
- Clinton Hill Historic District
HPD registration #343937, last renewed Aug 15, 2025.
Questions about 119 Cambridge Place
Who owns 119 Cambridge Place?
The owner of record in NYC Department of City Planning PLUTO data is 119 Cambridge Place LLC.
Does 119 Cambridge Place have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 119 Cambridge Place rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 89% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 119 Cambridge Place built?
City records list 1879 as the year it was built.
How many apartments are in 119 Cambridge Place?
It has 9 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.