110 St James Place
Brooklyn, NY 11238BBL 3-01963-0045Map
Owner of record: 110 St James LLC
110 St James Place is a walk-up apartment building built in 1874 in Brooklyn, 11238. It has 8 residential units across 3 floors. The owner of record is 110 St James LLC. HPD has recorded 88 housing violations here, most recently on June 7, 2026. 41 of the 50 most recent violations are still open.
- HPD violations
- 88
- DOB violations
- 6
- ECB violations
- 1
- HPD complaints
- 25
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 88
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Jun 7, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7, 3rd story, 1st apartment from east at south
Jun 7, 2026 · Apt 7
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 7, 3rd story, 1st apartment from east at south
Jun 7, 2026 · Apt 7
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 7, 3rd story, 1st apartment from east at south
Jun 7, 2026 · Apt 7
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower sash window at the 2nd window from north at east in the 2nd room from north located at apt 7, 3rd story, 1st apartment from east at south
Jun 7, 2026 · Apt 7
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story
May 14, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
May 14, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7, 3rd story, 1st apartment from west at north
May 14, 2026 · Apt 7
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 7, 3rd story, 1st apartment from west at north
May 14, 2026 · Apt 7
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 7, 3rd story, 1st apartment from west at north
May 14, 2026 · Apt 7
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7, 3rd story, 1st apartment from west at north
May 14, 2026 · Apt 7
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at north wall in the kitchen located at apt 8, 3rd story, 2nd apartment from east at south
Mar 20, 2026 · Apt 8
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the bathroom located at apt 8, 3rd story, 2nd apartment from east at south
Mar 20, 2026 · Apt 8
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the approx 12 sqft of mildew on the ceiling in the bathroom located at apt 8, 3rd story, 2nd apartment from east at south
Mar 20, 2026 · Apt 8
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at south wall in the vestibule at public hall, 1st story
Mar 20, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 20, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Mar 20, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to building entrance at east , 1st story
Mar 20, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the vestibule at public hall, 1st story
Mar 20, 2026
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 8, 3rd story, 2nd apartment from east at south
Mar 20, 2026 · Apt 8
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at north located at apt 8, 3rd story, 2nd apartment from east at south
Mar 20, 2026 · Apt 8
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance upper and lower window sash at 2nd window from south at west in the 2nd room from east at south located at apt 8, 3rd story, 2nd apartment from east at south
Mar 20, 2026 · Apt 8
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance upper window sash at 1st window from south at west in the 2nd room from east at south located at apt 8, 3rd story, 2nd apartment from east at south
Mar 20, 2026 · Apt 8
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the west wall in the bathroom located at apt 8, 3rd story, 2nd apartment from east at south
Mar 20, 2026 · Apt 8
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, south wall in the 2nd room from east at south located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 2nd room from east at south located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at north located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, south wall, ceiling in the 2nd room from east at south located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from east at north located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Notice of issuance sent to tenant - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl at east wall in the bathroom located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposede electrical wires at north wall in the kitchenette located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked and loose brown stone masonry at exterior wall, entrance to building ,1st story, building front yard
Jan 17, 2026
Open — Nov sent out - BHazardous
Replace with new the missing iron baluster at, balustrade at entrance stoop, building front yard
Jan 17, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective exhaust ventilation system at north wall in the kitchenette located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, south wall, west wall in the kitchenette located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft south wall in the bathroom located at apt 8, 3rd story, 1st apartment from east at south original violation 18578882 issued 17-jan-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jan 17, 2026 · Apt 8
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door, north wall at public hall, 1st story
Jan 17, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective the hinges at entrance door to building , at public hall, 1st story
Jan 17, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of a-framed, wood ladder ,at north wall, at public hall, 3rd story
Jan 17, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at west wall, chair rails at west wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 2nd room from east at south located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st window frame from south at west wall in the 2nd room from east at north located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balances at upper sash window, 1st from south at west wall in the 2nd room from east at south located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balances at upper sash window, 2nd from south at west wall in the 2nd room from east at south located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Closed — Violation dismissed - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door .. in the entrance located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over the ceiling in the 2nd room from east at north located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft south wall in the bathroom located at apt 8, 3rd story, 1st apartment from east at south
Jan 17, 2026 · Apt 8
Closed — Violation closed
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Landmark none
Landmk-landmark none
Aug 21, 2003
Dob violation - active - Landmark none
Landmk-landmark none
Aug 21, 2003
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jul 24, 2003
Dob violation - dismissed
ECB violations · 1
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000018705y0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Sep 27, 2024 · Penalty $3,125
Active
Complaints
- Appliance
Electric/gas range
May 23, 2026 · Apt 7
Close - Door/window
Window frame
May 23, 2026 · Apt 7
Close - Paint/plaster
Wall
May 19, 2026 · Apt 8
Close - Appliance
Electric/gas range
Mar 16, 2026 · Apt 8
Close - Unsanitary condition
Mold
Mar 16, 2026 · Apt 8
Close - General
Ventilation system
Mar 16, 2026 · Apt 8
Close - Door/window
Window frame
Mar 16, 2026 · Apt 8
Close - Electric
Wiring
Mar 16, 2026 · Apt 8
Close - Unsanitary condition
Pests
Mar 16, 2026 · Apt 8
Close - Unsanitary condition
Pests
Mar 16, 2026 · Apt 8
Close
Show 15 more ↓
- Paint/plaster
Wall
Mar 16, 2026 · Apt 8
Close - Appliance
Electric/gas range
Feb 26, 2026 · Apt 7
Close - Door/window
Door
Feb 26, 2026 · Apt 7
Close - Heat/hot water
Apartment only
Feb 26, 2026 · Apt 7
Close - Door/window
Window frame
Feb 26, 2026 · Apt 7
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt 8
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 24, 2026 · Apt 6
Close - Paint/plaster
Door/frame
Feb 2, 2026 · Apt 7
Close - Appliance
Electric/gas range
Jan 10, 2026 · Apt 8
Close - Door/window
Door
Dec 31, 2025 · Apt 8
Close - Door/window
Door
Dec 8, 2025 · Apt 8
Close - Plumbing
Toilet
Nov 6, 2025 · Apt 8
Close - Plumbing
Toilet
Nov 6, 2025 · Apt 8
Close - Safety
Fire escape
Sep 21, 2017 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1874
- Floors
- 3
- Residential units
- 8
- Building area
- 2,499 ft²
- Lot area
- 1,850 ft²
- Zoning
- R6B
- Community board
- 302
- Council district
- 35
- Block / lot
- 1963 / 45
- Assessed value
- $535,950
- Landmark / historic district
- Clinton Hill Historic District
HPD registration #365427, last renewed Jan 20, 2026.
Questions about 110 St James Place
Who owns 110 St James Place?
The owner of record in NYC Department of City Planning PLUTO data is 110 St James LLC.
Does 110 St James Place have violations?
Yes. NYC HPD has recorded 88 housing violations at this property.
Is 110 St James Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 110 St James Place built?
City records list 1874 as the year it was built.
How many apartments are in 110 St James Place?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.