123 Clifton Place
Brooklyn, NY 11238BBL 3-01949-0067Map
Owner of record: Diamond Garden Partners LLC
123 Clifton Place is a walk-up apartment building built in 2019 in Brooklyn, 11238. It has 9 residential units across 4 floors. The owner of record is Diamond Garden Partners LLC. HPD has recorded 26 housing violations here, most recently on October 2, 2025. 18 of the 26 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 26
- DOB violations
- 3
- ECB violations
- 14
- HPD complaints
- 46
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Oct 2, 2025 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Oct 2, 2025 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Oct 2, 2025 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective gasket at lower refrigerator door in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Oct 2, 2025 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Oct 2, 2025 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Refit door in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Oct 2, 2025 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around the counter top in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Oct 2, 2025 · Apt 1A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 10sq ft at ceiling in closet in the 1st room from east at center located at apt 4b, 4th story, 1st apartment from west at north
Feb 8, 2024 · Apt 4B
Open — Defect letter issued - BHazardous
Repair the roof so that it will not leak at ceiling in the private hallway located at apt 4b, 4th story, 1st apartment from west at north
Feb 8, 2024 · Apt 4B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 4b, 4th story, 1st apartment from west at north
Feb 8, 2024 · Apt 4B
Closed — Violation closed
Show 16 more ↓
- ANon-hazardous
Properly secure the loose air vent at ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Feb 8, 2024 · Apt 4B
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
Feb 8, 2024
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jan 19, 2024 · Apt 1A
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Jan 19, 2024 · Apt 1A
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jan 19, 2024 · Apt 1A
Open — Defect letter issued - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jan 19, 2024 · Apt 1A
Open — Not complied with - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jan 19, 2024 · Apt 1A
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 1st story
Jan 19, 2024
Open — Not complied with - CImmediately hazardous
Properly secure the loose wood tread 9th from bottom up, at staircase, in the private hallway located at apt 4b, 4th story, 1st apartment from west at north
Aug 1, 2023 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Aug 1, 2023 · Apt 4B
Open — Defect letter issued - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tiles surface and grouts joints of visible mold at south wall around bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Aug 1, 2023 · Apt 4B
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Aug 1, 2023 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electric exhaust fan at the ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Aug 1, 2023 · Apt 4B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from west at north original violation 16098818 issued 14-jul-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 14, 2023 · Apt 1A
Open — Defect letter issued - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from west at north
Jul 14, 2023 · Apt 1A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed
DOB building violations · 3
- Immediate emergency anythingoptional
1.at front exp#1,provide approx.30linear ft of constructionfence along sws at east of bldg.construction fence shall be installed with 2 five foot return back to bdlg to enclose the area in frnt of garagebay with defective brick.2.seal all accesible to prevent unauthorized access
Jan 3, 2019
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2012 annual high pressure boiler inspection
May 15, 2014
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2012 annual high pressure boiler inspection
May 15, 2014
Dob violation - dismissed
ECB violations · 14
- Class - 2
Failure to perform proper concrete washout water procedures. at time of inspection observed concrete poured at rear yard and at interior where concrete washout has been drained into to public street., comply wi
Mar 18, 2020 · Penalty $2,500
Resolve - Class - 1
Work does not confrom to approved construction documents @time of inspection of a 4 sty nb currently roof lvl i observed strutural steel @exp#1 welded to bulkhead framing & welded to a plate & attached to parap
Mar 4, 2020 · Penalty $625
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.at timeof inspection of a 4 story nb i observed new steel being erected at roof and work at balconies exp#1 contrary to a stop work order issued un
Feb 24, 2020
Resolve - Class - 2
Construction superintendent faled to perform duties per code.at time of inspection of a 4 story nb currently at roof level construction superintendent not on site upon request for superintendent daily log for t
Feb 5, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to provide sidewalk shed where required.at time of inspection of a 4 story nb currently at roof level i observed sidewalk shed not in place and exterior work at roof level and parapet wall has not been
Feb 5, 2020
Resolve - Class - 1
Failure to maintain a records of safety orientations performed at worksite.at the time of inspection i observed active jobsite with construction superintendent present upon request for records of safety orienta
Jan 23, 2020
Resolve - Class - 1
Failure to maintain records of preshift safety meeting for each workera the time of inspection i observed active jobsite with both construction superintendent and designated competent person present on site upo
Jan 23, 2020
Resolve - Class - 1
Failure to institute maintained safety equipment measures in temporaryconstruction no handrails.at the time of inspection i observed active jobsite with construction superintendent present.i observed various st
Jan 23, 2020
Resolve - Class - 1
Failure to maintained records of preshift safety meeting for each worker.at the time of inspection i observed active jobsite with construction superintendent present upon request for each worker preshift record
Jan 23, 2020
Resolve - Class - 2
Failure to safeguard. at time of inspection observed delivery truck with out rigger into public side walk with no flag person while hoisting material. also at 4th floor open hole with 1 story drop left unsecure
Dec 17, 2019
Resolve
Show 4 more ↓
- Class - 2
Sec. 3301.7 document to be kept on site. note: at the time of inspection of a 4 sty nb in progress i observed that they were using c joists to frame the structure. upon request for special inspector reports non
Oct 7, 2019
Resolve - Class - 2
Sec. 3303.4.1.1 maintenance. note: at the time of inspection of a 4 sty nb i observed the sidewalk adjacent to the roadway was not maintained causing tripping hazards for pedestrians,cracks,unleveled;creates a
Oct 7, 2019
Resolve - Class - 2
Failure to provide/maintain jobsite fence at the time of inspection proposed 4 sty nb foundation level work in progress site gates locked no one was at site observed fence was not adequate expos #4 with adj p
Sep 7, 2019
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/ violation# 35375097y issued on 01/02/19 and to file a certificate of correction pursuant to 28-201.1 amd 1rcny 102-01. failure to maintain b
Feb 21, 2019
Resolve
Complaints
- Unsanitary condition
Sewage
Jun 1, 2026 · Apt 2
Close - Appliance
Electric/gas range
Oct 2, 2025 · Apt 1A
Close - Flooring/stairs
Floor
Oct 2, 2025 · Apt 1A
Close - Electric
Power outage
Oct 2, 2025 · Apt 1A
Close - Paint/plaster
Wall
Oct 2, 2025 · Apt 1A
Close - Water leak
Damp spot
Oct 2, 2025 · Apt 1A
Close - Appliance
Refrigerator
Oct 2, 2025 · Apt 1A
Close - Unsanitary condition
Pests
Oct 2, 2025 · Apt 1A
Close - Unsanitary condition
Mold
Oct 2, 2025 · Apt 1A
Close - Unsanitary condition
Pests
Oct 2, 2025 · Apt 1A
Close
Show 36 more ↓
- Electric
No lighting
Apr 14, 2025 · Apt 1A
Close - Paint/plaster
Ceiling
Feb 6, 2024 · Apt 4B
Close - Unsanitary condition
Pests
Feb 6, 2024 · Apt 4B
Close - Unsanitary condition
Mold
Feb 6, 2024 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 17, 2024 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 15, 2024 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 3, 2024 · Apt 4B
Close - Paint/plaster
Ceiling
Dec 18, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Dec 18, 2023 · Apt 1A
Close - Door/window
Door
Dec 18, 2023 · Apt 1A
Close - Unsanitary condition
Mold
Dec 18, 2023 · Apt 1A
Close - Unsanitary condition
Sewage
Dec 18, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Dec 18, 2023 · Apt 1A
Close - Unsanitary condition
Sewage
Dec 18, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Dec 18, 2023 · Apt 1A
Close - Water leak
Heavy flow
Dec 18, 2023 · Apt 1A
Close - Flooring/stairs
Floor
Dec 18, 2023 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Dec 18, 2023 · Apt 1A
Close - Water leak
Damp spot
Dec 18, 2023 · Apt 1A
Close - Unsanitary condition
Mold
Dec 18, 2023 · Apt 1A
Close - Water leak
Heavy flow
Dec 18, 2023 · Apt 1A
Close - Water leak
Heavy flow
Dec 18, 2023 · Apt 1A
Close - Paint/plaster
Ceiling
Dec 18, 2023 · Apt 1A
Close - Paint/plaster
Ceiling
Dec 18, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Dec 18, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Jul 28, 2023 · Apt 4B
Close - Unsanitary condition
Mold
Jul 28, 2023 · Apt 4B
Close - Unsanitary condition
Mold
Jul 10, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Jul 10, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Jul 10, 2023 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Jul 10, 2023 · Apt 1A
Close - Water leak
Damp spot
Jul 10, 2023 · Apt 1A
Close - Unsanitary condition
Sewage
Jul 10, 2023 · Apt 1A
Close - Unsanitary condition
Mold
Jul 10, 2023 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 3, 2021 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 3, 2021 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2019
- Floors
- 4
- Residential units
- 9
- Building area
- 6,722 ft²
- Lot area
- 2,638 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1949 / 67
- Assessed value
- $998,550
- Landmark / historic district
- No
HPD registration #389211, last renewed Aug 22, 2025.
Questions about 123 Clifton Place
Who owns 123 Clifton Place?
The owner of record in NYC Department of City Planning PLUTO data is Diamond Garden Partners LLC.
Does 123 Clifton Place have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 123 Clifton Place rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 33% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 123 Clifton Place built?
City records list 2019 as the year it was built.
How many apartments are in 123 Clifton Place?
It has 9 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.