roofy

263 Franklin Avenue

Brooklyn, NY 11205BBL 3-01941-0016Map

Owner of record: Franklin Avenue Group LLC

263 Franklin Avenue is an elevator apartment building built in 2019 in Brooklyn, 11205. It has 16 residential units across 8 floors. The owner of record is Franklin Avenue Group LLC. HPD has recorded 10 housing violations here, most recently on March 10, 2022. City tax records listed 6 rent-stabilized apartments here in 2024.

HPD violations
10
DOB violations
1
ECB violations
9
HPD complaints
18

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 10, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
6
About 38% of the building's 16 apartments
Down from 13 in 2020

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 10

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 10, 2022

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Oct 23, 2021

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Mar 30, 2021

    Closed — Violation dismissed
  • A

    File with this department a registration statement for building.

    Mar 30, 2021

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 30, 2021

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 30, 2021

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box misssing at public hall, 1st story

    Mar 30, 2021

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Mar 30, 2021

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Mar 30, 2021

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Mar 30, 2021

    Closed — Violation closed

DOB building violations · 1

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2021

    Dob violation - active

ECB violations · 9

  • Class - 2

    Sec. 3307.6.4.2 no storage on shed. at the time of inspection on an active jobsite currently at roof level,i observed debris on top of sidewalk shed at exp#1 consisting of wood,metal & other construction materi

    Dec 6, 2019

    Resolve
  • Class - 1

    Sec. 3303.9 failure to maintain required means of egress 7 ither elements in existing bldg under construction. note: at the time of inspection of a 6 sty nb in progress i observed inadequate egress from the 5th

    Aug 22, 2019

    Resolve
  • Class - 1

    Failure to maintain adequate hosekeeping per section requirements. note: at the time of my inspection of a 6 sty nb in progress i observed in adequate housekeeping throughout site causing tripping hazards. this

    Aug 22, 2019

    Resolve
  • Class - 1

    Construction superintendent fail to perform duties per rule. the following hazadrous condition & stop work order was observed & issued on this date. 1)failure to maintain egress from 5th level to 6th level 2)fa

    Aug 22, 2019

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications. note: at the time of my inspection of a 6 sty nb in progress i observed a sidewalk shed in place. upon my inspection i observed there was a concrete truc

    Aug 22, 2019

    Resolve
  • Class - 1

    Sec. 3301.13.12 competent person. note: at the time of my inspection of a 6 sty bldg,construction work in progress,upon request for a competent person(as per code)for operation none was provided or available as

    Aug 22, 2019

    Resolve
  • Class - 2

    Failure to institute/maintain safety equipment measures or temporary construction. note: at the time of my inspection of a 6 sty nb in progress,upon my inspection i oberved workers in progress doing perimeter

    Aug 22, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Work does not conform to approved construction documents &/or approvedamendments. note: at the time of my inspection of a 6 sty nb in progress. i observed concrete pump truck in roadway. this did not conform to

    Aug 22, 2019

    Resolve
  • Class - 1

    Sec. 3307.4 work & storage zone. note: at the time of my inspection ofa 6 sty bldg at 6th fl level construction work in progress i observed concrete operation in progress at exp#1 grade level adjacent to sidewa

    Aug 22, 2019 · Penalty $625

    Resolve

Complaints

  • Appliance

    Refrigerator

    Jul 20, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Jun 5, 2025 · Apt 6C

    Close
  • Plumbing

    Basin/sink

    Jul 31, 2024 · Apt 6C

    Close
  • Water leak

    Heavy flow

    Sep 29, 2023 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Feb 13, 2023 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Dec 4, 2022 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Jun 8, 2022 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Apr 23, 2022 · Apt 2B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 18, 2022 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Oct 26, 2021 · Apt 1A

    Close
Show 8 more ↓
  • Flooring/stairs

    Floor

    Oct 26, 2021 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Oct 26, 2021 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Oct 25, 2021 · Apt 1A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 19, 2021 · Apt BLDG

    Close
  • General

    Signage missing

    Oct 18, 2021 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Sep 27, 2021 · Apt BASEME

    Close
  • Unsanitary condition

    Pests

    Mar 25, 2021 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Mar 25, 2021 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2019
Floors
8
Residential units
16
Building area
14,257 ft²
Lot area
3,160 ft²
Zoning
R7A
Community board
303
Council district
36
Block / lot
1941 / 16
Assessed value
$1,538,550
Landmark / historic district
No

HPD registration #389237, last renewed Jul 8, 2025.

Questions about 263 Franklin Avenue

Who owns 263 Franklin Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Franklin Avenue Group LLC.

Does 263 Franklin Avenue have violations?

Yes. NYC HPD has recorded 10 housing violations at this property.

Is 263 Franklin Avenue rent stabilized?

NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 38% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 263 Franklin Avenue built?

City records list 2019 as the year it was built.

How many apartments are in 263 Franklin Avenue?

It has 16 residential units and 17 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.