50 Mac Donough Street
Brooklyn, NY 11216BBL 3-01854-0023Map
Owner of record: 50 Macdonough Street Property Owner LLC
50 Mac Donough Street is a walk-up apartment building built in 1931 in Brooklyn, 11216. It has 8 residential units across 4 floors. The owner of record is 50 Macdonough Street Property Owner LLC. HPD has recorded 139 housing violations here, most recently on February 4, 2026. 7 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2018.
- HPD violations
- 139
- DOB violations
- 27
- ECB violations
- 22
- HPD complaints
- 261
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 139
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2andba, 1st story, 1st apartment from north at east
Feb 4, 2026 · Apt 2ANDBA
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Jan 29, 2026 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west
Nov 27, 2024 · Apt 5
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 27, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Nov 27, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6, 3rd story, 1st apartment from north at east
Mar 5, 2024 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door to basement locked to boiler room at boiler room
Mar 5, 2024
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 16, 2023 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Aug 16, 2023 · Apt 3
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story
Aug 16, 2023
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at closet in the 2nd room from north located at apt 3, 2nd story, 1st apartment from north at east
Feb 15, 2021 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the closet in the 2nd room from east located at apt 3, 2nd story, 1st apartment from west at north
Feb 15, 2021 · Apt 3
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Sep 15, 2020
Closed — Violation dismissed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 1st story
Sep 15, 2020
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 3, 3rd story
Sep 10, 2019 · Apt 3
Open — Nov certified late - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3, 3rd story
Sep 10, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Replace the broken or defective at wash basin in the bathroom located at apt 3, 3rd story
Sep 10, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective the east wall under sink in the kitchen located at apt 3, 3rd story
Sep 10, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 3, 3rd story, 1st apartment from south at west
Sep 10, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective the wood floor in the private hallway located at apt 3, 3rd story
Sep 10, 2019 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors at bulkhead to roof
Aug 23, 2019
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors at all stories at public hall
Aug 23, 2019
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 23, 2019
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 23, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 23, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 23, 2019
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Replace with new the missing escutcheon plate at heat riser in the 2nd room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Replace with new the missing escutcheon plate at heat riser in the 3rd room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Replace with new the missing escutcheon plate at heat riser in the 5th room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling throughout in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Replace with new the missing escutcheon plate at heat riser in the private hallway located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallway located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 6th room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 6th room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Replace with new the missing escutcheon plate at heat riser in the 6th room from north located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the broken or defective door knob at door leading to fire escape window in the 7th room from north at east located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Replace with new the missing escutcheon plate at heat riser in the 7th room from north at east located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 7th room from north at east located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 7th room from north at east located at apt 3, 2nd story, 1st apartment from south at west
Aug 23, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective bell buzzer/ intercom from building entrance to apartment located at apt 3, 2nd story, 1st apartment from south at west
Dec 26, 2018 · Apt 3
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Dec 9, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door to cellar at public hall, 1st story
Dec 9, 2018
Closed — Violation dismissed
DOB building violations · 27
- Construction other optional
Ftc w/commissioner's order control#341410 vio#070825pi30301hz dated 7/8/25 reuesting owner to prov a corrective action plan w/in 30 days &start bldg reprs. as of 10/16/25 a cap & evidence of compl was not rec'd. immed comply w/commissioner's order control#341410 vio# 070825pi30301hz to provide a corretive action plan
Oct 16, 2025
Dob violation - active - Construction other optional
Correction action plan req'd-obsvd @ exp1 ornamental stonework in disrepair,metal cornice in disrepair & mortar deteriortion @ various locations @ exp4 vert masonry cracks & stucco in disrepair. owner to immed retain reg design prof to eval the entire bldg and submit correction action plan to [email protected] w/in 30days
Jul 8, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Construction other optional
Stop all work immediately and make site safe
Mar 9, 2020
Dob violation - dismissed - Construction other optional
Stop all work make site safe
Mar 9, 2020
Dob violation - dismissed - Construction other optional
Stop all work immediately and make site safe
Mar 9, 2020
Dob violation - dismissed - Construction other optional
Stop all wor immediately and make site safe
Mar 9, 2020
Dob violation - dismissed - Construction other optional
Stop all work immediately and make site safe
Mar 9, 2020
Dob violation - dismissed - Construction other optional
Stop all work immediately and make site safe
Mar 9, 2020
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #340537244 due to contractor withdrawal
Feb 27, 2020
Dob violation - dismissed
Show 17 more ↓
- Construction other optional
The dob hereby orders you to stop all work under job #340537244 due to contractor withdrawal
Feb 27, 2020
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #321927233 immediately due to contractor withdrawal
Feb 27, 2020
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #321927233 immediately due to contractor withdrawal
Feb 27, 2020
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #340535308 due to contractor withdrawal
Feb 27, 2020
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #340535308 immediately due to contractor withdrawal
Feb 27, 2020
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #340535335 due to contractor withdrawal
Feb 27, 2020
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #340535335 immediately due to contractor withdrawal
Feb 27, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 26, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 26, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 26, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 3, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 22
- Class - 2
At time of inspection observed: sidewalk shed/ohp in place at exposure# 1-2 with permit# b01271897-i1-sh upon review department record it appear permit expired on 08/19/2026, creating an unsafe condition, no su
Aug 24, 2026 · Penalty $1,250
Active - Class - 2
At time of inspection observed 4 story building 45ft in height. observed supported scaffolding installed on top of sidewalk shed at exp# 1. sidewalk shed installed contrary to bc 3307.6.3 not extended 5ft as re
Jun 19, 2026 · Penalty $10,000
Active - Class - 1
Failure to maintain building in code-compliant manner. i observed at exp. 01 ornamental stonework in disrepair metal cornice in disrepair and deteriorated mortar at various locations; at exp 04 vertical masonry
Jul 8, 2025 · Penalty $12,500
Active - Class - 2
Work does not conform to approved construction documents and/or approved amendments.appl#321927233 noted at the time of inspection plams found on site didn't conform to actual work done.based on phisical inspec
Jun 25, 2020 · Penalty $625
Resolve - Class - 1
Dwelling converted, maintained or occupied with 3 or more additional dwellling units than legally authorized by dept of building records indicates premises to be legally approved as a class a m/d base on physi
Dec 4, 2019 · Penalty $25,000
Resolve - Class - 1
Failure to maintain building in code-compliant manner. lack of a system of automatic sprinkler where require as per bc 903.2 and 27954 for sro in apt 4 on 2nd floor. previous violation 35450146z. rem: disconti
Dec 4, 2019 · Penalty $3,125
Resolve - Class - 1
Dwelling converted, maintained or occupie with 3 or more additional dwellimg units than legally authorized by dept of building records in-dicates premises to be legally approved as a class a m/d base on physi
Dec 4, 2019 · Penalty $25,000
Resolve - Class - 1
Dwelling converted, maintained or occupied with 3 or more additional dwellling units than legally authorized by dept of building records indicates premises to be legally approved as a class a m/d base on physi
Dec 4, 2019 · Penalty $25,000
Resolve - Class - 1
Dwelling converted, maintained or occupied with 3 or more additional dwellling units than legally authorized by dept of building records indicates premises to be legally approved as a class a m/d base on physi
Dec 4, 2019 · Penalty $15,000
Resolve - Class - 1
Failure to maintain building in code-compliant manner. lack of required number of means of egress for every floor per bc 1018.1 (2008) code. 27-306 bc 1021.1 2014 code for so in apt 4 on 2nd floor. previous vio
Dec 4, 2019 · Penalty $6,250
Resolve
Show 12 more ↓
- Class - 1
Failure to provide a fire alarm system for sro in apt 4 on 2nd floor. previous violation 35450145r. rem: discontinue illegal occupancy.
Dec 4, 2019
Resolve - Class - 1
Dwelling converted, maintained or occupied with 3 or more additional dwellling units than legally authorized by dept of building records indicates premises to be legally approved as a class a m/d base on physi
Dec 4, 2019 · Penalty $25,000
Resolve - Class - 1
Bc907.28/failure to provide a fire alarm system for sro in apt 4 on 2 nd flr.rem:discontinue illegal occupancy.
Sep 23, 2019
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of system of automatic sprinkler where is required as per bc9032 and 27-954 per bc9032 and 27-954 for sro in apt 4 on 2 floor.
Sep 23, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack fo requirednumber of means of egress for every floor as per bc1018.1(2008 code)bc1021.1(2014 code for sro in apt 4.rem discontinue illegl occupancy.
Sep 23, 2019 · Penalty $2,500
Resolve - Class - 1
Dwelling converted maintained or occupied with 3 or more additional dwelling units than legally authorized by dob indicates premises to be legally a class a m/d base on physical inspection apt4 on 2 flr equippe
Sep 23, 2019 · Penalty $60,000
Resolve - Class - 1
Dwelling ocnverted maintained or occupied with 3 or more additional dwelling units than legally authorized by dept of building records indicates premises to be legally a class a m/d base on physical inspection
Sep 23, 2019 · Penalty $60,000
Resolve - Class - 1
Dwelling converted maintained or ocupied with 3 or more additional dwelling units than legally authorized by the dob records indicates premises to be legally approved as a class a multiple dwelling base on phys
Sep 23, 2019 · Penalty $60,000
Resolve - Class - 1
Dwelling converted maintained r occupied with 3 or more additional dwelling units than legally authorized by dob records indicates premises to be legally a class a m/d based on physical inspection apt 4 on 2 fl
Sep 23, 2019
Resolve - Class - 1
Dwelling converted maintained or occupied with 3 or more additional dwelling units than legally authorized by dob records indicates premisesto be legally a class a m/d based on physical inspection apt 4 on 2 fl
Sep 23, 2019 · Penalty $60,000
Resolve - Class - 2
Work without a permit noted apt4 on 2nd floor a full partition wall with door in living room area to create a additional bedroom.rem:obtain all permits.
Sep 23, 2019 · Penalty $1,250
Resolve - Class - 2
Electrical work w/o a permit. observed at 3pm emergency exit lights installed on every hallway and feeders to hallway fixtures in every hallway. no app on file for new electrical work. rmdy:obtain permit.
Mar 3, 2016 · Penalty $2,000
Resolve
Complaints
- Unsanitary condition
Sewage
Oct 20, 2026 · Apt 5
Open - Unsanitary condition
Mold
Oct 20, 2026 · Apt 5
Open - Heat/hot water
Apartment only
Feb 9, 2026 · Apt UNIT1B
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 3
Close - Safety
Smoke detector
Jan 31, 2026 · Apt BASEME
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 2ANDBA
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 3
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 25, 2026 · Apt 3
Close - Plumbing
Radiator
Jan 25, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Jan 13, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Jan 10, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Oct 28, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Oct 27, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Oct 25, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Oct 24, 2025 · Apt 3
Close - General
Bell/buzzer/intercom
Oct 24, 2025 · Apt 3
Close - Door/window
Door
Feb 9, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Dec 2, 2024 · Apt APARTM
Close - Heat/hot water
Apartment only
Dec 2, 2024 · Apt 3FLOOR
Close - Heat/hot water
Apartment only
Nov 30, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Nov 29, 2024 · Apt 3C
Close - Heat/hot water
Apartment only
Nov 25, 2024 · Apt 3ONTHE
Close - Unsanitary condition
Mold
Aug 11, 2024 · Apt 4ROOMA
Close - Water leak
Slow leak
Aug 4, 2024 · Apt 4ROOMA
Close - Flooring/stairs
Floor
Aug 4, 2024 · Apt 4ROOMA
Close - Water leak
Damp spot
Aug 4, 2024 · Apt 4ROOMA
Close - Unsanitary condition
Pests
Aug 4, 2024 · Apt 4ROOMA
Close - Unsanitary condition
Mold
Aug 4, 2024 · Apt 4ROOMA
Close - Flooring/stairs
Floor
Aug 4, 2024 · Apt 4ROOMA
Close - Unsanitary condition
Pests
Aug 4, 2024 · Apt 4ROOMA
Close - Flooring/stairs
Floor
Aug 4, 2024 · Apt 4ROOMA
Close - Electric
Lighting
Aug 4, 2024 · Apt 4ROOMA
Close - Unsanitary condition
Sewage
Mar 25, 2024 · Apt 8
Close - Unsanitary condition
Pests
Mar 25, 2024 · Apt 8
Close - Heat/hot water
Apartment only
Mar 3, 2024 · Apt 6
Close - Heat/hot water
Apartment only
Feb 29, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Feb 18, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Oct 29, 2023 · Apt 3
Close - Unsanitary condition
Pests
Sep 6, 2023 · Apt 8
Close - Unsanitary condition
Pests
Sep 6, 2023 · Apt 8
Close - Paint/plaster
Ceiling
Aug 16, 2023 · Apt 3
Close - Water leak
Heavy flow
May 4, 2023 · Apt 1
Close - Water leak
Heavy flow
May 2, 2023 · Apt BASEME
Close - Heat/hot water
Apartment only
Nov 21, 2022 · Apt 3
Close - Heat/hot water
Apartment only
Nov 20, 2022 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 8
- Building area
- 15,520 ft²
- Lot area
- 5,400 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1854 / 23
- Assessed value
- $968,850
- Landmark / historic district
- No
HPD registration #319598, last renewed Sep 16, 2025.
Questions about 50 Mac Donough Street
Who owns 50 Mac Donough Street?
The owner of record in NYC Department of City Planning PLUTO data is 50 Macdonough Street Property Owner LLC.
Does 50 Mac Donough Street have violations?
Yes. NYC HPD has recorded 139 housing violations at this property.
Is 50 Mac Donough Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2018 (about 63% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 50 Mac Donough Street built?
City records list 1931 as the year it was built.
How many apartments are in 50 Mac Donough Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.