231 Hancock Street
Brooklyn, NY 11216BBL 3-01833-0046Map
Owner of record: Meraki Properties LLC
231 Hancock Street is a walk-up apartment building built in 1881 in Brooklyn, 11216. It has 8 residential units across 4 floors. The owner of record is Meraki Properties LLC. HPD has recorded 329 housing violations here, most recently on September 14, 2026. 2 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 329
- DOB violations
- 12
- ECB violations
- 5
- HPD complaints
- 252
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 329
- CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at ...throughout yard
Sep 14, 2026
Open — Not complied with - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Dec 1, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of missing fire stopping material, all walls and ceiling in the entire apartment located at apt 1l
Apr 30, 2024 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of missing fire stopping material, entire apt gutted out, all walls and ceilings in the entire apartment located at apt 1r, 1st story
Apr 30, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective steam riser line in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Properly secure the loose hanging electrical light fixture at ceiling at public hall, 1st story
Sep 13, 2023
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. properly secure 1st tread from dottom at 2nd story balcony, building rear
Sep 13, 2023
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods dropladder in down position at building rear
Sep 13, 2023
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling throughout in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electrical light fixture at ceiling in the private hallway located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling at public hall, 1st story
Sep 13, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective sub wood floor in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective sub wood floor in the private hallway located at apt 3, 2nd story, 1st apartment from south at west
Sep 13, 2023 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats at front yard
Aug 5, 2023
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Aug 5, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Aug 5, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Aug 5, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Aug 5, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Aug 5, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the private hallway located at apt 3, 2nd story, 1st apartment from south at west
Aug 5, 2023 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Jun 13, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and all ceilings in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Jun 13, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Provide plain glass at building front entrance , 1st story
Jun 13, 2023
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of plexi glass at building front entrance , 1st story
Jun 13, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department approx. 4 sq.ft. at ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Open — False certification - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 4th room from north located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Refit lower sash at the window in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Properly secure the loose the washbasin and the bathtub at east wall in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective electrical switch at east wall in the 1st room from north at west located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx. 8 sq.ft at ceiling in the 1st room from north at west located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color approx 40 sq.ft. at ceiling in the 1st room from north at west located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Jun 2, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation door and door trim in the entrance located at apt 3, 2nd story, 1st apartment from south at west
May 22, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
May 22, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all doors and door trims and windowframe in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
May 22, 2023 · Apt 3
Closed — Violation dismissed
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active
Show 2 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 5
- Class - 1
At time of inspection, observed construction work performed on 1st floor and cellar with this application still not being approved at time of inspection., obtain permit; obtain permit.
Apr 30, 2024 · Penalty $1,250
Resolve - Class - 1
At time of inspection, observed work being performed without permit on 1st floor. all firestopping removed and not replaced causing immediate danger for occupied tenant in unit 2l on 2nd floor., provide/maintai
Apr 30, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner@apt3 kitchen sink waste line defective&leaking causing damage to wood fl in front of sink.repair &/or replace.
Jul 8, 2021
Resolve - Non-hazardous
Failure to maintain exterior building wall. noted: at top floor window on marcy ave. elevation- brick and stone masonry until missing and dislodge. * immediately+ remedy: shore remaining masonry- protect public
Sep 29, 2002
Active - Hazardous
Scaffold not in compliance with bldg code specifications(phatform damaged & bent use of rigging equipment without special riggers li cense use of rigging equipment without proper damage signs.failure
Oct 7, 1994 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Mold
Sep 5, 2026 · Apt 2
Close - Safety
Carbon monoxide detector
Sep 5, 2026 · Apt 2
Close - General
Ventilation system
Sep 5, 2026 · Apt 2
Close - Safety
Fire escape
Sep 5, 2026 · Apt 2
Close - Door/window
Door
Sep 5, 2026 · Apt 2
Close - Unsanitary condition
Sewage
Sep 5, 2026 · Apt 2
Close - Flooring/stairs
Floor
Sep 5, 2026 · Apt 2
Close - Heat/hot water
Entire building
Sep 5, 2026 · Apt 2
Close - Appliance
Electric/gas range
Sep 5, 2026 · Apt 2
Close - Water leak
Heavy flow
Sep 5, 2026 · Apt 2
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jul 3, 2026 · Apt OUTSID
Close - Unsanitary condition
Garbage/recycling storage
Dec 1, 2025 · Apt BUILD
Close - Unsanitary condition
Pests
Dec 1, 2025 · Apt BUILD
Close - Safety
Fire escape
Dec 1, 2025 · Apt BUILD
Close - Plumbing
Steam pipe/riser
Sep 12, 2023 · Apt 3
Close - Plumbing
Bathtub/shower
Sep 12, 2023 · Apt 3
Close - Flooring/stairs
Floor
Sep 12, 2023 · Apt 3
Close - Water leak
Heavy flow
Sep 12, 2023 · Apt 3
Close - Electric
Lighting
Sep 12, 2023 · Apt 3
Close - Flooring/stairs
Floor
Sep 12, 2023 · Apt 3
Close - Paint/plaster
Ceiling
Sep 12, 2023 · Apt 3
Close - Electric
Power outage
Sep 12, 2023 · Apt 3
Close - Unsanitary condition
Pests
Jul 17, 2023 · Apt 3
Close - Safety
Smoke detector
Jun 9, 2023 · Apt 3
Close - Heat/hot water
Apartment only
Jun 9, 2023 · Apt 3
Close - Door/window
Window frame
Jun 9, 2023 · Apt 3
Close - Door/window
Window frame
Jun 9, 2023 · Apt 3
Close - Unsanitary condition
Mold
Jun 9, 2023 · Apt 3
Close - Paint/plaster
Ceiling
Jun 9, 2023 · Apt 3
Close - Safety
Carbon monoxide detector
Jun 9, 2023 · Apt 3
Close - Heat/hot water
Apartment only
Jun 9, 2023 · Apt 3
Close - Unsanitary condition
Pests
Jun 9, 2023 · Apt 3
Close - Outside building
Gutter/leader
Jun 9, 2023 · Apt BLDG
Close - Electric
No lighting
Jun 9, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 9, 2023 · Apt BLDG
Close - Outside building
Roofing
Jun 9, 2023 · Apt BLDG
Close - General
Mailbox
Jun 9, 2023 · Apt BLDG
Close - Door/window
Window frame
May 30, 2023 · Apt 3
Close - Flooring/stairs
Floor
May 30, 2023 · Apt 3
Close - Water leak
Slow leak
May 30, 2023 · Apt 3
Close - Water leak
Slow leak
May 30, 2023 · Apt 3
Close - Paint/plaster
Ceiling
May 30, 2023 · Apt 3
Close - Flooring/stairs
Floor
May 30, 2023 · Apt 3
Close - Unsanitary condition
Mold
May 30, 2023 · Apt 3
Close - Paint/plaster
Ceiling
May 30, 2023 · Apt 3
Close - Plumbing
Steam pipe/riser
May 22, 2023 · Apt 3
Close - Paint/plaster
Ceiling
Apr 23, 2023 · Apt 3
Close - Water leak
Slow leak
Apr 23, 2023 · Apt 3
Close - Paint/plaster
Ceiling
Mar 29, 2023 · Apt 3
Close - Heat/hot water
Apartment only
Mar 29, 2023 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1881
- Floors
- 4
- Residential units
- 8
- Building area
- 11,520 ft²
- Lot area
- 4,000 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1833 / 46
- Assessed value
- $1,412,100
- Landmark / historic district
- Bedford Historic District
HPD registration #320108, last renewed Jul 10, 2025.
Questions about 231 Hancock Street
Who owns 231 Hancock Street?
The owner of record in NYC Department of City Planning PLUTO data is Meraki Properties LLC.
Does 231 Hancock Street have violations?
Yes. NYC HPD has recorded 329 housing violations at this property.
Is 231 Hancock Street rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 88% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 231 Hancock Street built?
City records list 1881 as the year it was built.
How many apartments are in 231 Hancock Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.