413 Throop Avenue
Brooklyn, NY 11221BBL 3-01801-0001Map
Owner of record: 413 Throop Ave LLC
413 Throop Avenue is a walk-up apartment building built in 2022 in Brooklyn, 11221. It has 6 residential units across 3 floors. The owner of record is 413 Throop Ave LLC. HPD has recorded 14 housing violations here, most recently on June 16, 2025. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 14
- DOB violations
- 3
- ECB violations
- 22
- HPD complaints
- 34
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at south yard of building
Apr 13, 2005
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 3rd story
Mar 8, 2005 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire rated material ceilings and walls, all stories at public hall
Mar 8, 2005
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceilings and walls, all stories at public hall
Mar 8, 2005
Closed — Violation closed - BHazardous
Abate the nuisance consisting of evidence of concealed water leak at ceiling in the entire apartment located at apt #2, 3rd story, 1st apartment from south at west
Sep 17, 2003 · Apt #2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling throughout in the entire apartment located at apt #2, 3rd story, 1st apartment from south at west
Sep 17, 2003 · Apt #2
Closed — Violation closed - BHazardous
Repair the broken or defective connection waste line at wash-basin in the bathroom located at apt #2, 3rd story, 1st apartment from south at west
Sep 17, 2003 · Apt #2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective walls and ceiling plaster at 1st and 2nd story at public hall
Sep 17, 2003
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings in the entire apartment located at apt 2, 3rd story
Sep 5, 2003 · Apt 2
Closed — Violation closed
Show 4 more ↓
- BHazardous
Properly repair with similar material the broken or defective cement plaster ceiling at public hall, 3rd story
Sep 5, 2003
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cement plaster west wall at public hall, 2nd story
Sep 5, 2003
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings 1st to 3rd sty. at public hall
Sep 5, 2003
Closed — Violation closed - BHazardous
Replace with new the missing shoe drop ladder south at fire escape
Sep 5, 2003
Closed — Violation closed
DOB building violations · 3
- Unsafe buildings none
Ub-unsafe buildings none
Sep 24, 2016
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Feb 19, 1999
Dob violation - dismissed - Immediate emergency anythingoptional
Aka 413 throop avenue, aka 497-502 lexingtron avenue
Feb 12, 1999
Dob violation - dismissed
ECB violations · 22
- Class - 2
Responding a complaint observed: gc failure to maintain lighting as per code 3307.6.4.8 making an unsafe condition for pedestrians. provide lighting.
Mar 21, 2023 · Penalty $2,400
Resolve - Class - 2
Responding a complaint observed: gc failure to maintain construction fence as per code 3307.7 expo# 2 there is a missing fence panel; having an easy access to job site and getting hurt. make an unsafe condition
Mar 21, 2023
Resolve - Class - 2
Responding complaint observed: sidewalk shed installed at expo# 1-2 upon review department record it appear permit # b00758301-i1-sh, was expired on 03/17/2023
Mar 21, 2023
Resolve - Class - 2
At time of inspection observed no information project panel to sidewalk shed parapet at exp #1 or #2.remedy:provide project info panel.
Mar 11, 2023
Resolve - Class - 2
Failure to maintain supported scaffold as per code, at time of inspection of inactive jobsite of 3 stories new building, observed supported scaffold on place at exposure# 1-2-4 not maintained as per code, missi
Jan 17, 2023
Resolve - Class - 2
Observed unfinished bulkhead work- bulkhead roof parapet not built, exposed rebar. observed that the exp#3 adjoining building's roof and rear yard, both directly below, were unprotected, as required by code. st
Dec 8, 2022
Resolve - Class - 2
Observed cold form steel/c-joist floor framing, at all floors, with bridging/bracing that had an opening in the middle, and was bent 90 deg on both sides in opposing directions, to allow for attachment to adj j
Dec 8, 2022
Resolve - Class - 2
Observed 3 str nb at bulkhead level with cold form steel/ c-joists floor framing on all floors. upon request for the special inspection report for the c-joists, only a report for the 2nd fl was provided. upon r
Dec 8, 2022
Resolve - Class - 1
Work does not conform to ssp. at time of inspection observed. plan indicate 2 stairs from from foundation opening , observed no stairs while two person working in this area. also plan indicate guard-railing aro
Apr 21, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to post or properly post permit for work at premises. at time of inspection of a 3 sty bldg,observed sidewalk shed installed at exp#1&4 w/o permit posted. observed no permits posted on any structure as
Jun 12, 2020 · Penalty $625
Resolve
Show 12 more ↓
- Class - 2
Pedestrian protection does not meet code specifications note at the time of my inspection i oberved a sidewalk shed in place (1) failure to extend sidewalk shed 5 ft at exposure #1 creating a unsafe condition (
May 1, 2020 · Penalty $2,400
Resolve - Class - 2
Pedestrian protection does not meet code specifications. note at time of inspection i observed sidewalk shed in place. (1)failure to maintain parapet wall panel missing and was on the ground (2)failure to maint
Mar 12, 2019
Resolve - Class - 2
Sidewalk shed does not meet code specifications.noted:shed not illuminated @ time of inspec.rem:conform to shed specifications.
May 17, 2012 · Penalty $5,000
Resolve - Class - 2
Fail to maintain.noted:vacant bldg missing windows @ it's 2nd & 3rd fls (western southern elevations).exposing structure environmental elements.rem:seal windows.
Jul 1, 2010
Resolve - Class - 1
Failure to maintain bldg.noted:missing window @ 2nd & 3rd flr levels exposing structural to environmental elements.rem:maintain bldg
Jan 19, 2010 · Penalty $10,000
Resolve - Class - 2
Fail to file cert of correction w/dob pursuant to 28-204.2 for violation 34796616x.remedy:file certificate of correction.
Jan 19, 2010 · Penalty $8,000
Resolve - Class - 1
Fail to maintain bldg interior: defect noted: at cellar level. flooding due to missing piping causing foundation damage basement full of debris. ceiling partially collapsed. major water damage thru out. remedy:
Aug 10, 2009 · Penalty $5,000
Resolve - Non-hazardous
Work without a permit. noted: garage has been demolished at said pre- mises. a search of dept records shows no permit was issued for said work. remedy: obtain necessary permit.
Apr 25, 1999 · Penalty $500
Resolve - Hazardous
Failure to maintain exterior building wall. hazardous defect is: erod-ed mortar joints defective and bulging rear exterior brick wall and indanger of collapsing into the adjoining rear yard of, 411 throop ave.
Feb 18, 1999 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall. hazardous defect is: appr-oximately 75 percent of the one story garage rear brick wall collapsedinto the north adjoining building 411 throop avenue rear yard. in add-
Feb 11, 1999 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior building wall. hazardous defect is: loosemissing and defective brickwork at 3rd story north bearing wall with eroded mortar joints. at upper portion above north adjoining building
Feb 11, 1999 · Penalty $800
Resolve - Hazardous
Failure to maitnain exterior building wak hazarodous defect is approximately 75 percent of one story garage brick rear wall collapsed ito the north adjoining premises 411 throop ave rear yard hte remaining 1/4
Jan 29, 1999 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jun 5, 2024 · Apt IFYOUA
Close - Heating
Heat related
Mar 17, 2005 · Apt BLDG
Close - Electric
Bell-buzzer/intercom
Feb 25, 2005 · Apt 3
Close - Heating
Heat related
Feb 25, 2005 · Apt 3
Close - Electric
Bell-buzzer/intercom
Feb 25, 2005 · Apt 2
Close - Electric
Bell-buzzer/intercom
Feb 18, 2005 · Apt 2
Close - Heating
Heat related
Feb 18, 2005 · Apt 2
Close - Electric
Bell-buzzer/intercom
Feb 12, 2005 · Apt 2
Close - Heating
Heat related
Feb 12, 2005 · Apt 2
Close - Electric
Bell-buzzer/intercom
Feb 3, 2005 · Apt 2
Close
Show 24 more ↓
- Heating
Heat related
Feb 3, 2005 · Apt 2
Close - Heating
Heat related
Jan 31, 2005 · Apt 2
Close - Heating
Heat related
Jan 27, 2005 · Apt 3
Close - Heating
Heat related
Jan 26, 2005 · Apt 2
Close - Heating
Heat related
Jan 25, 2005 · Apt 2
Close - Heating
Heat related
Jan 23, 2005 · Apt 2
Close - Heating
Heat related
Jan 22, 2005 · Apt 3
Close - Paint/plaster
Wall
Jan 19, 2005 · Apt 2
Close - Paint/plaster
Ceiling
Jan 19, 2005 · Apt 2
Close - Heating
Heat related
Jan 19, 2005 · Apt 2
Close - General
Mold
Jan 18, 2005 · Apt 2
Close - Heating
Heat related
Jan 18, 2005 · Apt 2
Close - Heating
Heat related
Jan 17, 2005 · Apt 2
Close - Heating
Heat related
Dec 30, 2004 · Apt 2
Close - Heating
Heat related
Dec 13, 2004 · Apt #2
Close - Heating
Heat related
Jan 15, 2004 · Apt 3
Close - Heating
Heat related
Dec 26, 2003 · Apt #2
Close - Plumbing
Water-leaks
Sep 10, 2003 · Apt #2
Close - General
Windows
Sep 10, 2003 · Apt #2
Close - Plumbing
Water-leaks
Sep 10, 2003 · Apt #2
Close - Paint/plaster
Wall
Sep 2, 2003 · Apt 2
Close - Electric
Lighting
Sep 2, 2003 · Apt 2
Close - Plumbing
Water-leaks
Sep 2, 2003 · Apt 2
Close - Plumbing
Water-leaks
Aug 27, 2003 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 2022
- Floors
- 3
- Residential units
- 6
- Building area
- 4,302 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1801 / 1
- Assessed value
- $548,550
- Landmark / historic district
- No
HPD registration #391432, last renewed Jul 30, 2025.
Questions about 413 Throop Avenue
Who owns 413 Throop Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 413 Throop Ave LLC.
Does 413 Throop Avenue have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 413 Throop Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 413 Throop Avenue built?
City records list 2022 as the year it was built.
How many apartments are in 413 Throop Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.