295 Throop Avenue
Brooklyn, NY 11206BBL 3-01773-0004Map
Owner of record: Lexington Avenue L.p.
295 Throop Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11206. It has 6 residential units across 3 floors. The owner of record is Lexington Avenue L.p.. HPD has recorded 20 housing violations here, most recently on September 4, 2026. 10 of the 20 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 20
- DOB violations
- 10
- ECB violations
- 5
- HPD complaints
- 62
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east at south located at apt 3a, 3rd story, 1st apartment from south at west
Sep 4, 2026 · Apt 3A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 3a, 3rd story, 1st apartment from south at west
Sep 4, 2026 · Apt 3A
Open — Civ14 mailed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 4, 2026
Open — Nov certified on time - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ventilation system in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Jul 13, 2022 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Jul 13, 2022 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ventilation system in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Jul 13, 2022 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed
Show 10 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 25, 2015
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperative located at apt 2b, 2nd story, 1st apartment from north at east
Jun 19, 2013 · Apt 2B
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 2b, 2nd story, 1st apartment from north at east
Jun 19, 2013 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; located at apt 2b, 2nd story, 1st apartment from north at east
Jun 19, 2013 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the 2nd room from east located at apt 2-l, 2nd story, 2nd apartment from north at east
Sep 15, 2003 · Apt 2-L
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the 1st room from east located at apt 2-l, 2nd story, 2nd apartment from north at east
Sep 15, 2003 · Apt 2-L
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. north wall in the foyer located at apt 2-l, 2nd story, 2nd apartment from north at east
Sep 15, 2003 · Apt 2-L
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the 1st room from east located at apt 2r, 2nd story, 2nd apartment from north at east
Aug 27, 2003 · Apt 2R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. west wall in the 1st room from east located at apt 2r, 2nd story, 2nd apartment from north at east
Aug 27, 2003 · Apt 2R
Open — First no access to re- inspect violation
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boiler boiler optional
24b/20b burner base not sealed properly
Nov 6, 1989
Dob violation - dismissed
ECB violations · 5
- Hazardous
Plumbing work w/o permit in the celar found approx 20 ft of 3/4 in gas piping ran out to new hot water heater remedy obtain a permit if feasible or restore to prior legal condition
Aug 11, 2003 · Penalty $1,000
Resolve - Hazardous
Plumbing work performed is required to be performed by a licensed master plumber. new installation of 3/4" gas line with all related fitting and valve running in excess of 20' for hot water tank. also new
Aug 6, 2003 · Penalty $2,500
Resolve - Hazardous
Plumbing work without a permit. now installation of 3/4" gas line with all related fittings and valve running in excess of to' for hot water tank as well as the tank itself with all related exhaust piping. all
Aug 6, 2003 · Penalty $1,000
Resolve - Non-hazardous
Failure to have new or a hered plumbing system tested. new installation of 3/4" case line with all related fittings and valve. new installation of hot and cold water lines for hot water tank. hot water tank
Aug 6, 2003 · Penalty $2,500
Resolve - Non-hazardous
Returns leaking. burner base not sealed properly.
Nov 6, 1989 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Mold
Sep 1, 2026 · Apt 3A
Close - General
Ventilation system
Sep 1, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Aug 18, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Mar 20, 2015 · Apt 1A
Close - Heat/hot water
Apartment only
Apr 23, 2014 · Apt 3A
Close - Heating
Heat related
Feb 19, 2004 · Apt 1R
Close - General
Mold
Jan 26, 2004 · Apt 3-L
Close - Heating
Heat related
Jan 26, 2004 · Apt 3-L
Close - Heating
Heat related
Jan 17, 2004 · Apt 3L
Close - Heating
Heat related
Jan 15, 2004 · Apt 3L
Close
Show 40 more ↓
- Heating
Heat related
Dec 16, 2003 · Apt BLDG
Close - General
Windows
Dec 12, 2003 · Apt 3L
Close - Electric
Lighting
Dec 12, 2003 · Apt 3L
Close - Appliance
Refrigerator
Dec 12, 2003 · Apt 3L
Close - General
Mold
Dec 12, 2003 · Apt 3L
Close - Heating
Heat related
Dec 12, 2003 · Apt 3L
Close - Heating
Heat related
Dec 11, 2003 · Apt 3-L
Close - General
Mold
Dec 11, 2003 · Apt 3-L
Close - General
Mold
Dec 11, 2003 · Apt 3-L
Close - Heating
Heat related
Dec 9, 2003 · Apt 1-L
Close - Appliance
Refrigerator
Nov 25, 2003 · Apt 3L
Close - Electric
Electric-supply
Nov 25, 2003 · Apt 3L
Close - General
Windows
Nov 25, 2003 · Apt 3L
Close - General
Mold
Nov 25, 2003 · Apt 3L
Close - Heating
Heat related
Nov 25, 2003 · Apt 3L
Close - Heating
Heat related
Oct 24, 2003 · Apt 3L
Close - Heating
Heat related
Oct 22, 2003 · Apt 2R
Close - General
Windows
Sep 23, 2003 · Apt 3L
Close - Electric
Electric-supply
Sep 23, 2003 · Apt 3L
Close - Plumbing
Basin/sink
Sep 23, 2003 · Apt 3L
Close - Appliance
Refrigerator
Sep 23, 2003 · Apt 3L
Close - Electric
Wiring
Sep 23, 2003 · Apt 3L
Close - General
Mold
Sep 23, 2003 · Apt 3L
Close - Plumbing
Basin/sink
Sep 23, 2003 · Apt 3L
Close - Plumbing
Basin/sink
Sep 23, 2003 · Apt 3L
Close - General
Mold
Sep 23, 2003 · Apt 3L
Close - Paint/plaster
Wall
Sep 23, 2003 · Apt 3L
Close - General
Doors
Sep 23, 2003 · Apt 3L
Close - General
Mold
Sep 15, 2003 · Apt 3L
Close - Electric
Electric-supply
Sep 8, 2003 · Apt 2-L
Close - General
Locks
Sep 8, 2003 · Apt 2-L
Close - Paint/plaster
Wall
Sep 8, 2003 · Apt 2-L
Close - General
Windows
Sep 8, 2003 · Apt 2-L
Close - Paint/plaster
Wall
Sep 8, 2003 · Apt 2-L
Close - General
Mold
Sep 8, 2003 · Apt 2-L
Close - Plumbing
Water-leaks
Sep 8, 2003 · Apt 2-L
Close - Plumbing
Water supply
Sep 8, 2003 · Apt 2-L
Close - Plumbing
Basin/sink
Sep 8, 2003 · Apt 2-L
Close - Paint/plaster
Ceiling
Aug 27, 2003 · Apt 2R
Close - Heating
Heat related
Aug 26, 2003 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 5,109 ft²
- Lot area
- 2,564 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1773 / 4
- Assessed value
- $629,550
- Landmark / historic district
- No
HPD registration #315377, last renewed Aug 31, 2025.
Questions about 295 Throop Avenue
Who owns 295 Throop Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Lexington Avenue L.p..
Does 295 Throop Avenue have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 295 Throop Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 295 Throop Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 295 Throop Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.