257 Hart Street
Brooklyn, NY 11206BBL 3-01769-0052Map
Owner of record: 257 Hart LLC
257 Hart Street is a walk-up apartment building built in 1931 in Brooklyn, 11206. It has 6 residential units across 3 floors. The owner of record is 257 Hart LLC. HPD has recorded 202 housing violations here, most recently on May 27, 2026. 25 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2019.
- HPD violations
- 202
- DOB violations
- 24
- ECB violations
- 31
- HPD complaints
- 318
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 202
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
May 27, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at electrical meter room door at basement
May 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to building front at basement
May 27, 2026
Open — Invalid certification - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
May 27, 2026
Open — Invalid certification - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 27, 2026
Open — Invalid certification - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
May 27, 2026
Open — Invalid certification - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
May 27, 2026
Open — Invalid certification - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 27, 2026
Open — Invalid certification - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 27, 2026
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at boiler room door at basement
May 27, 2026
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 3b, 3rd story
Jul 24, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 3b, 3rd story original violation 17148718 issued 24-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 24, 2024 · Apt 3B
Open — First no access to re- inspect violation - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jul 24, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 24, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 24, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jul 24, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 24, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jul 24, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jul 24, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 24, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jul 24, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3b, 3rd story
Jul 24, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling in the bathroom located at apt 3b, 3rd story
Jul 24, 2024 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from north located at apt 3a, 3rd story, 1st apartment from south at west
Oct 5, 2023 · Apt 3A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north located at apt 3a, 3rd story, 1st apartment from south at west
Oct 5, 2023 · Apt 3A
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 5, 2023
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Oct 5, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 5, 2023
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 5, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 5, 2023
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 5, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective , at hinge in the entrance located at apt 3a, 3rd story, 1st apartment from south at west
Oct 5, 2023 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx. 1 sq. ft. at north wall in the 6th room from north located at apt 1a, 1st story, 1st apartment from north at east
Aug 20, 2023 · Apt 1A
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx. 1 sq. ft. at north wall in the 6th room from north located at apt 1a, 1st story, 1st apartment from north at east original violation 16174259 issued 20-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 20, 2023 · Apt 1A
Open — Defect letter issued - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Dec 9, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Dec 9, 2022 · Apt 3A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north
Nov 5, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above ceiling in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north
Nov 5, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx . two sq. feet at east wall in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north
Nov 5, 2022 · Apt 3B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx . two sq. feet at east wall in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north original violation 15464743 issued 05-nov-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 5, 2022 · Apt 3B
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north located at apt 2b, 2nd story, 1st apartment from west at north
Oct 27, 2022 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 27, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 27, 2022
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 27, 2022
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 27, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 27, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missjng at public hall, 1st story
Oct 27, 2022
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approxmaitaly 5 square feet at windows recess in the 1st room from north located at apt 2b, 2nd story, 1st apartment from west at north
Oct 27, 2022 · Apt 2B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approxmaitaly 5 square feet at windows recess in the 1st room from north located at apt 2b, 2nd story, 1st apartment from west at north original violation 15450516 issued 27-oct-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 27, 2022 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Provide ready access to buildings heating system from 1st storyvto boile room to basement at public hall, 1st story
Oct 27, 2022
Closed — Violation dismissed
DOB building violations · 24
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Construction other optional
Special inspector, alberto roman, pe#95364 surrendered all .filing privileges, therefore pursuant to ac-28-105.10.2 borough .commissioner has ordered swo under application #322031403.
Aug 28, 2022
Dob violation - active - Construction other optional
Special inspector, alberto roman, pe#95364 surrendered all .filing privileges, therefore pursuant to ac-28-105.10.2 borough .commissioner has ordered swo under application #322031403
Aug 28, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed
Show 14 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 31
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000060332y0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Jul 1, 2025 · Penalty $625
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35355204m issued on 10/05/18 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. for failure to maintain adequate housekeeping per
Sep 17, 2020 · Penalty $625
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35355204m issued on 10-05-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain adequate housekeeping per section requireme
Jan 28, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35355204m issued on 10/05/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for excessive amount of
Dec 5, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/comm's order contained in vio#35355204m issued on 10/05/18 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01.for:333.4&27-1018-failure to maintain adequate housekeeping per section re
Oct 24, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35355205y issued on 10-08-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for working while on a stop work order. remedy: comply w/comm's
Sep 20, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35355204m issued on 10-05-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Aug 13, 2019
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35355205y issued on 10/8/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commissio
Aug 5, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation# 35355202z issued on 10/05/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for: work does not con
Jun 28, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35355204m issued on 10-05-18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain adeq
May 22, 2019
Resolve
Show 21 more ↓
- Class - 2
Failure to comply with the commissioners order contained in summons/v olation#35355205y issued on 10/08/18 and to file a certificate of cor ectiion pursuant to 28-201.1 and 1rcny 102-01.rem;comply with commiss
May 13, 2019 · Penalty $3,125
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35355202z issued on 10/05/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work does not conform
Apr 11, 2019
Resolve - Class - 1
Tampered with.removed.or defaced a writte posted stop work order.at time of inspection and observed an stop work order had been tampered anddefected on front door and cannot read the violations numbers and dott
Apr 11, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply with commissioners order contained in summons/violation #35355204m issued on 10/5/18 and to file a certificate of correction pursuant to 28.201.1 and rcny 102-01failure to maintain building
Mar 6, 2019
Resolve - Class - 2
Failure to comply with commissioners order contained in summons/violation #35355205y issued on 10/8/18 and to file a certificate of correction pursuant to 28.201.1 and rcny 102-01unlawfully continued work again
Mar 6, 2019
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35355202z issued on 10/5/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. work does not conform to a
Feb 14, 2019
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35355202z issued on 10/5/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for work that does not con
Dec 31, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35355205y issued on 10-08-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for working while on stop work order. remedy: comply w/comm's o
Dec 31, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35355204m issued on 10-05-10 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for inadequate housekeeping at 2 & 3 floors. remedy: comply w/c
Dec 31, 2018
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35355202z issued on 10/05/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work does not conform to approced construction documents & or
Dec 31, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35355203k issued on 10-05-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for failure to safeguard. remedy: comply w/comm's order &/or fi
Nov 11, 2018 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35355206x issued on 10-08-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for filing false application. remedy: comply w/comm's order &/o
Nov 11, 2018 · Penalty $625
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35355205y issued on 10/8/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. unlawfully continued work
Nov 10, 2018
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35355202z issued on 10-5-18 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01 work does not conform to approved construction docume
Nov 10, 2018
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35355204m issued on 10/5/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to maintain adequa
Nov 10, 2018
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. noted:at time of inspection observed workers on 2nd & 3rd floor working on walls removal & cleaning & hauling debris from bldg contrary to posted
Oct 8, 2018 · Penalty $12,500
Resolve - Class - 1
Filed a certificate,form,application etc,containing false statement. noted: under job #321765979 under section 26,checked no applying to bldg occupied at 1st fl observed tenants at apt#1r. remedy: comply w/code
Oct 8, 2018 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.noted:permit #321765979 for renovation of exisiting 6 family with work at 1st floor has construction ongoing at 2nd and 3rd fl
Oct 5, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to safeguard all persons and proeprty affected by constructionoperations.noted:on active jobsite under permit #321765979 work ongoing at 2 and 3 floor have tenants occupying 1st floor.application falsel
Oct 5, 2018 · Penalty $12,500
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.noted:at 2nd and 3rd floors removed wall finishing and material lays accumulated throughout floors of both 2&4 floors.wood lathe,plaster.framin
Oct 5, 2018 · Penalty $6,250
Resolve - Hazardous
Occupancy contrary to that allowed by c of o and dept of bldgs records. class "a" apt created at cellar fixtures present. remedy:restore premises to legal occupancy
Jul 30, 2007 · Penalty $800
Active
Complaints
- Door/window
Door
Nov 10, 2025 · Apt ENTIRE
Close - Electric
Power outage
Oct 13, 2025 · Apt 1B
Close - General
Ventilation system
Sep 26, 2024 · Apt 1B
Close - Door/window
Door
Sep 16, 2024 · Apt ENTIRE
Close - Unsanitary condition
Garbage/recycling storage
Sep 6, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 21, 2024 · Apt 3B
Close - Unsanitary condition
Mold
Jul 29, 2024 · Apt 3B
Close - Door/window
Door
Feb 5, 2024 · Apt ENTIRE
Close - Water leak
Slow leak
Nov 27, 2023 · Apt 3A
Close - Paint/plaster
Ceiling
Nov 27, 2023 · Apt 3A
Close
Show 40 more ↓
- Water leak
Slow leak
Oct 30, 2023 · Apt 3A
Close - Water leak
Damp spot
Oct 15, 2023 · Apt 3A
Close - Paint/plaster
Ceiling
Oct 15, 2023 · Apt 3A
Close - Paint/plaster
Ceiling
Oct 5, 2023 · Apt 3A
Close - Water leak
Slow leak
Sep 29, 2023 · Apt 3A
Close - Paint/plaster
Ceiling
Sep 29, 2023 · Apt 3A
Close - General
Bell/buzzer/intercom
Sep 21, 2023 · Apt 1B
Close - Door/window
Door
Sep 21, 2023 · Apt 1B
Close - Door/window
Door
Sep 21, 2023 · Apt 1B
Close - Door/window
Door
Sep 20, 2023 · Apt ENTIRE
Close - Door/window
Door
Sep 20, 2023 · Apt 2B
Close - Unsanitary condition
Mold
Aug 13, 2023 · Apt 1A
Close - Heat/hot water
Entire building
Dec 7, 2022 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 16, 2022 · Apt 2B
Close - Water leak
Heavy flow
Oct 16, 2022 · Apt 2B
Close - Door/window
Window frame
Oct 12, 2022 · Apt 3B
Close - Flooring/stairs
Floor
Oct 12, 2022 · Apt 3B
Close - Water leak
Heavy flow
Oct 12, 2022 · Apt 3B
Close - Flooring/stairs
Floor
Oct 12, 2022 · Apt 3B
Close - Unsanitary condition
Mold
Oct 12, 2022 · Apt 3B
Close - Plumbing
Basin/sink
Oct 7, 2022 · Apt 3A
Close - Paint/plaster
Ceiling
Oct 7, 2022 · Apt 3A
Close - Unsanitary condition
Mold
Oct 7, 2022 · Apt 3A
Close - Water leak
Slow leak
Oct 7, 2022 · Apt 3A
Close - Heat/hot water
Apartment only
Oct 7, 2022 · Apt 3A
Close - Paint/plaster
Ceiling
Jun 21, 2022 · Apt 3A
Close - Water leak
Slow leak
Jun 21, 2022 · Apt 3A
Close - Appliance
Electric/gas range
Jan 22, 2022 · Apt 3B
Close - Heat/hot water
Apartment only
Oct 14, 2018 · Apt 1R
Close - Unsanitary condition
Pests
Apr 1, 2018 · Apt 3R
Close - Electric
Power outage
Feb 6, 2018 · Apt 1R
Close - Electric
Power outage
Feb 4, 2018 · Apt 1R
Close - Electric
Power outage
Jan 25, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 24, 2018 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Jan 24, 2018 · Apt 3R
Close - Electric
No lighting
Jan 24, 2018 · Apt 3R
Close - Electric
Power outage
Jan 23, 2018 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 21, 2018 · Apt 2L
Close - Unsanitary condition
Pests
Nov 28, 2017 · Apt 1R
Close - Plumbing
Basin/sink
Jul 10, 2017 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 5,985 ft²
- Lot area
- 2,650 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1769 / 52
- Assessed value
- $556,650
- Landmark / historic district
- No
HPD registration #329526, last renewed Jul 23, 2026.
Questions about 257 Hart Street
Who owns 257 Hart Street?
The owner of record in NYC Department of City Planning PLUTO data is 257 Hart LLC.
Does 257 Hart Street have violations?
Yes. NYC HPD has recorded 202 housing violations at this property.
Is 257 Hart Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2019 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 257 Hart Street built?
City records list 1931 as the year it was built.
How many apartments are in 257 Hart Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.