307 Malcolm X Boulevard
Brooklyn, NY 11233BBL 3-01682-0001Map
Owner of record: 307 Partners Realty Samuel Halbe Rg
307 Malcolm X Boulevard is a walk-up apartment building built in 1927 in Brooklyn, 11233. It has 7 residential units across 4 floors. The owner of record is 307 Partners Realty Samuel Halbe Rg. HPD has recorded 171 housing violations here, most recently on September 16, 2026. 14 of the 50 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 171
- DOB violations
- 8
- ECB violations
- 4
- HPD complaints
- 453
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 171
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north at west located at apt 2l, 2nd story, 1st apartment from west at north
Sep 16, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 2l, 2nd story, 1st apartment from west at north
Sep 16, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 2l, 2nd story, 1st apartment from west at north
Sep 16, 2026 · Apt 2L
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes construction buckets at balcony at 2nd fire escape from north at west, 3rd story
Jun 21, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarding material at ceiling in vestibule at public hall, 1st story
Jun 21, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in vestibule at public hall, 1st story
Jun 21, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2023
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Jun 5, 2023
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Jun 5, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Jun 5, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door at public hall, 1st story
Aug 11, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at east, the private hallway located at apt 2r, 2nd story, 1st apartment from east at south
Sep 26, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Sep 26, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Sep 26, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at east located at apt 2r, 2nd story, 1st apartment from east at south
Sep 26, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 12 sq.ft at ceiling, west wall, north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Jul 1, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of ac at fire escape window at west wall in the 3rd room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Jul 1, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color approximately 30 sq.ft, the ceiling, south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Jul 1, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Jul 1, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Jul 1, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jul 1, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at west 2 fire escape at front of building , 2nd story
Jun 29, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 3rd room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 29, 2021
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from south at west wall, north wall, south wall, east wall, west wall in the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling (approx 10 sq ft) north wall (approx 2 sq ft) and south wall (approx 2 sq ft) in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Jun 29, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots located at 2nd story balcony at building front at fire escape
Nov 11, 2020
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor at 2nd, 3rd and 4th stories at public hall
Nov 11, 2020
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 19, 2019
Closed — Violation dismissed
DOB building violations · 8
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 4
- Hazardous
Failure to maintain exterior bldg defects noted: 1 brick chimney is missing bricks and mortar 2 missing coping stone approx. 7 linear ft on roof level. remedy: maintain exterior bldg defects.
Oct 24, 2007 · Penalty $800
Resolve - Hazardous
Failure to maintain note interior main staircase is in disrepair, with 1st step at first fl rocking and loose and various steps throug hout loose split and in disrepair. remedy: maintain bldg
Oct 24, 2007 · Penalty $800
Resolve - Non-hazardous
B4a,32a,50a,b,c,d,e. 50a-flue pipe not properly sealed to chimney 50b-flue pipe holes 50c-pipe safety or relief valve up right 50d-boiler rmnot a storage rm. 50e-holes on boiler rm walls & ceiling.
Jan 5, 2007 · Penalty $2,500
Active - Hazardous
Failure to maintain building:defect is:apt 1r 1st floor has learge &collapsed ceiling area 6x6 in bathroom over shower. remedy:make immediate repairs.
Oct 17, 2002 · Penalty $2,500
Resolve
Complaints
- Water leak
Slow leak
Aug 21, 2026 · Apt 2L
Close - Plumbing
Basin/sink
Jul 10, 2026 · Apt 2L
Close - Flooring/stairs
Floor
Jul 10, 2026 · Apt 2L
Close - Water leak
Heavy flow
Jun 9, 2026 · Apt 4L
Close - Plumbing
Basin/sink
Apr 10, 2023 · Apt 2L
Close - Unsanitary condition
Garbage/recycling storage
Jul 27, 2022 · Apt BLDG
Close - Plumbing
Toilet
Mar 18, 2022 · Apt 2R
Close - Unsanitary condition
Pests
Sep 24, 2021 · Apt 2R
Close - Unsanitary condition
Mold
Sep 24, 2021 · Apt 2R
Close - Paint/plaster
Ceiling
Jun 28, 2021 · Apt 2R
Close
Show 40 more ↓
- Plumbing
Basin/sink
Oct 31, 2020 · Apt 4R
Close - Flooring/stairs
Floor
Oct 31, 2020 · Apt 4R
Close - Paint/plaster
Ceiling
Oct 31, 2020 · Apt 4R
Close - Door/window
Window frame
Oct 31, 2020 · Apt 4R
Close - Door/window
Window pane
Oct 31, 2020 · Apt 4R
Close - Water leak
Slow leak
Oct 31, 2020 · Apt 4R
Close - Water leak
Slow leak
Jun 30, 2020 · Apt 4R
Close - Plumbing
Bathtub/shower
Jun 30, 2020 · Apt 4R
Close - Door/window
Window frame
Jun 30, 2020 · Apt 4R
Close - Plumbing
Bathtub/shower
May 27, 2020 · Apt 4R
Close - Door/window
Window frame
May 27, 2020 · Apt 4R
Close - Water leak
Slow leak
May 27, 2020 · Apt 4R
Close - Door/window
Window frame
Apr 30, 2020 · Apt 4R
Close - Plumbing
Toilet
Apr 30, 2020 · Apt 4R
Close - Water leak
Slow leak
Apr 30, 2020 · Apt 4R
Close - Water leak
Slow leak
Jan 16, 2019 · Apt 3L
Close - Heat/hot water
Entire building
Dec 14, 2017 · Apt 3L
Close - Heat/hot water
Apartment only
Mar 5, 2017 · Apt 1R
Close - Electric
Outlet/switch
Jul 15, 2016 · Apt 2R
Close - General
Cabinet
Jul 15, 2016 · Apt 2R
Close - Safety
Carbon monoxide detector
Jul 15, 2016 · Apt 2R
Close - Safety
Smoke detector
Jul 15, 2016 · Apt 2R
Close - Paint/plaster
Wall
May 4, 2016 · Apt 2R
Close - Paint/plaster
Ceiling
May 4, 2016 · Apt 2R
Close - Door/window
Window frame
May 4, 2016 · Apt 2R
Close - Safety
Smoke detector
May 4, 2016 · Apt 2R
Close - Door/window
Door
Jan 29, 2016 · Apt BLDG
Close - Plumbing
Bathtub/shower
Jan 14, 2016 · Apt 2R
Close - General
Bell/buzzer/intercom
Jan 14, 2016 · Apt 2R
Close - Door/window
Door to dumbwaiter
Jan 14, 2016 · Apt 2L
Close - Plumbing
Basin/sink
Jan 9, 2016 · Apt 4R
Close - Flooring/stairs
Floor
Jan 9, 2016 · Apt 4R
Close - Heat/hot water
Entire building
Oct 18, 2015 · Apt 1R
Close - Heat/hot water
Entire building
Jan 10, 2015 · Apt 1R
Close - Unsanitary condition
Pests
Oct 1, 2014 · Apt 2L
Close - Unsanitary condition
Pests
Oct 1, 2014 · Apt 2L
Close - Plumbing
Water supply
Oct 1, 2014 · Apt 2L
Close - Water leak
Heavy flow
Jun 10, 2014 · Apt 2R
Close - Paint/plaster
Ceiling
Jun 10, 2014 · Apt 2R
Close - Paint/plaster
Ceiling
Jun 10, 2014 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1927
- Floors
- 4
- Residential units
- 7
- Building area
- 10,800 ft²
- Lot area
- 3,000 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1682 / 1
- Assessed value
- $726,300
- Landmark / historic district
- No
HPD registration #313064, last renewed Sep 7, 2022.
Questions about 307 Malcolm X Boulevard
Who owns 307 Malcolm X Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 307 Partners Realty Samuel Halbe Rg.
Does 307 Malcolm X Boulevard have violations?
Yes. NYC HPD has recorded 171 housing violations at this property.
Is 307 Malcolm X Boulevard rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 14% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 307 Malcolm X Boulevard built?
City records list 1927 as the year it was built.
How many apartments are in 307 Malcolm X Boulevard?
It has 7 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.