roofy

320 Malcolm X Boulevard

Brooklyn, NY 11233BBL 3-01681-0045Map

Owner of record: 360 Decatur LLC

320 Malcolm X Boulevard is a walk-up apartment building built in 1886 in Brooklyn, 11233. It has 7 residential units across 4 floors. The owner of record is 360 Decatur LLC. HPD has recorded 280 housing violations here, most recently on August 28, 2026. 15 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.

HPD violations
280
DOB violations
32
ECB violations
17
HPD complaints
222

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 28, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
2
About 29% of the building's 7 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 280

  • A

    Trace and repair the source and abate the visible mold condition... less then 10 sq ft at south and west walls in the bathroom located at apt 4r, 4th story, 1st apartment from south at west

    Aug 28, 2026 · Apt 4R

    Open — Notice of issuance sent to tenant
  • A

    Properly repair with similar material the broken or defective ceramic tiles at south, west walls and floor in the bathroom located at apt 4r, 4th story, 1st apartment from south at west

    Aug 28, 2026 · Apt 4R

    Open — Violation will be reinspected
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south and west walls in the bathroom located at apt 4r, 4th story, 1st apartment from south at west

    Aug 28, 2026 · Apt 4R

    Open — Violation will be reinspected
  • C

    M/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 1st room from east at north located at apt 4r, 4th story, 1st apartment from south at west

    Jun 25, 2026 · Apt 4R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west

    Jun 25, 2026 · Apt 4R

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story

    Jun 18, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 4r, 4th story, 1st apartment from south at west

    Jun 18, 2026 · Apt 4R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroom located at apt 4r, 4th story, 1st apartment from south at west

    Jun 18, 2026 · Apt 4R

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4r, 4th story, 1st apartment from south at west

    Jun 18, 2026 · Apt 4R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wash basin at south wall in the bathroom located at apt 4r, 4th story, 1st apartment from south at west

    Jun 18, 2026 · Apt 4R

    Open — Nov sent out
Show 40 more ↓
  • B

    Replace with new the missing base cabinet at south wall in the bathroom located at apt 4r, 4th story, 1st apartment from south at west

    Jun 18, 2026 · Apt 4R

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items and boxes at public hall stairs, 4th story

    Jun 18, 2026

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    Sep 17, 2025

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west

    Sep 17, 2025 · Apt 4R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the foyer located at apt 4r, 4th story, 1st apartment from south at west

    Sep 17, 2025 · Apt 4R

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of airconditioner installed at window at north wall leading to fire escape in the 1st room from east located at apt 4r, 4th story, 1st apartment from south at west

    Sep 17, 2025 · Apt 4R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the bathroom located at apt 4r, 4th story, 1st apartment from south at west

    Sep 17, 2025 · Apt 4R

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of key operated lock on door leading to egress window in the 4th room from east located at apt 1r, 1st story, 1st apartment from south at west

    Jul 31, 2025 · Apt 1R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from south at west

    Jul 31, 2025 · Apt 1R

    Closed — Violation closed
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at water closet and wash basin at cellar

    Jul 18, 2025

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration breaching of the floor slab and installing stairs connecting the first story and cellar creating a duplex apartment in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Jul 18, 2025 · Apt 1R

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west

    Feb 27, 2025 · Apt 4R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west

    Feb 27, 2025 · Apt 4R

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west

    Feb 27, 2025 · Apt 4R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Feb 12, 2025

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Feb 12, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Feb 12, 2025 · Apt 3R

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd story balcony at building front , 3rd story

    Sep 20, 2023

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 4r, 4th story, 1st apartment from south at west

    Mar 6, 2022 · Apt 4R

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west

    Mar 6, 2022 · Apt 4R

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system boiler room door locked at boiler room

    Feb 15, 2022

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Feb 15, 2022 · Apt 3R

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Feb 15, 2022 · Apt 3R

    Closed — Violation closed
  • C

    Provide adequate supply of hot water for the fixtures at all hot water fixture kitcken sink, wash basin,bathtub in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 19, 2021 · Apt 3R

    Closed — Violation dismissed
  • A

    Replace with new the broken or defective ceramic floor tile in the private hallway located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north, east, south and west walls in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • A

    Replace with new the broken or defective ceramic floor tile in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • C

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet , inoperable in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective reglaze porcelain enamel bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • C

    Provide a safe and adequate supply of electric service to the fixtures , cause unknown in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective bell buzzer intercom at east wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • A

    Replace with new the broken or defective glass pane at lower window sash at north wall in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • A

    Replace with new the broken or defective ceramic floor tile in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north, east, and south walls in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • A

    Replace with new the broken or defective ceramic floor tile in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective lower window sash counter balance at north wall in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 7, 2021 · Apt 2R

    Closed — Violation dismissed
  • C

    Replace the broken or defective water closet in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 30, 2021 · Apt 2R

    Closed — Violation dismissed
  • B

    Replace with new the missing entrance door in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 30, 2021 · Apt 2R

    Closed — Violation dismissed
  • C

    Replace with new the missing window glass at upper and lower sashes in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 30, 2021 · Apt 2R

    Closed — Violation dismissed
  • C

    Replace with new the broken or defective glass pane at lower window sash in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 30, 2021 · Apt 2R

    Closed — Violation dismissed

DOB building violations · 32

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 1, 2015

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 1, 2015

    Dob violation - active
Show 22 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 1, 2015

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Apr 30, 2015

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Apr 30, 2015

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Apr 30, 2015

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Apr 30, 2015

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Apr 30, 2015

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 17

  • Class - 2

    Failure to maintain, i observed in cellar a fully installed sump pump, with piping incorrectly discharging waste onto sidewalk, not compliant with pc 712, repair and/or replace

    May 29, 2026 · Penalty $1,280

    Active
  • Class - 2

    Work without permit, i observed sump pump 100% installed with all typical piping in basement with no permits on file in dob system., obtain all permits

    May 29, 2026 · Penalty $1,280

    Active
  • Class - 2

    Failure to file required annual boiler inspection reports for low-pressure boiler 30000072692n0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for

    Sep 27, 2024 · Penalty $625

    Active
  • Class - 1

    Work without permit. at time of inspection in cellar i observed illegal gas meter bypass for restaurant. additionally i observed 5 electric hot water heaters. no permit on dob records to perform this work., obt

    Mar 4, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to have new or altered plumbing system tested. at time of inspection i observed 5 new electric hot water heaters, 6 commercial gas appliances- no plumbing inspection., perform test

    Mar 4, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain building in code complaint manner. at time of inspection in cellar i observed illegal bushing on gas line, installed on gas meter bar to restaurant., repair and/replace

    Mar 4, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Gas being supplied to building without inspections and authorization by dob. at time of inspection i observed in restaurant 6 commercial gas appliances. no plumbing inspections, no gas authorization under job#

    Mar 4, 2022 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to file certificates of correction for 2 violations #351132925 on 4/10/15-#35113287p on 4/10/15.remedy:file certificate of correction

    Oct 31, 2015 · Penalty $2,000

    Active
  • Class - 2

    Failure to comply with the commissioner's order contained in nov #35113291h issued on 4/08/15 and to file a certificate of correction pursuant to 28-201.1,28-204.4 and 1rcny 102-01.rem:comply with commissioner'

    Sep 16, 2015 · Penalty $800

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in nov #35113292j issued on 4/10/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. for unlawfully continued work while on notice of a stop work

    Sep 16, 2015 · Penalty $2,400

    Resolve
Show 7 more ↓
  • Class - 1

    Failure to comply w/the comm's order contained in nov #35113287p issued on 4/8/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. for gut-rehab,damp etc done w/o a permit. remedy: comply w/comm

    Sep 16, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order. found 5 men at work performing various construction work including masonry &cement work,exterior or facade work contrary to stop work order #

    Apr 10, 2015 · Penalty $4,800

    Active
  • Class - 1

    Work w/o a permit gut rehab in progress w/5 men at work on 5 levels- from bsmt throught 4th flr; work noted include demo,full height parti tions,new electric, new plumbing and mechanicals rebuilding of entry

    Apr 8, 2015 · Penalty $1,600

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner.noted:a partially occupied building w/in full blown construction with excessive dust and debris on public hall with no tenant protection plan; severe hazardous

    Apr 8, 2015 · Penalty $1,000

    Active
  • Class - 2

    Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #35119240p issued on 12/22/14 pursuant to 28-204.4 & 1rcny102-01. continued to work while notice of a stop work order in apts #

    Feb 10, 2015

    Resolve
  • Class - 1

    Fail to comply w/the commissioner's order contained in n.o.v. #35097975l issued on 10/20/14.work w/o a permit. gut renovations of apt's 2l, 3l, & 4l.remedy: comply w/the commissioner's order.

    Dec 22, 2014

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of stop work order.a s.w.o was issued for apts 2l,3l, & 4l on 10/28/14.sheetrockers installing sheetrock & taping @time of insp @apts 2l,3l, & 4l.rem:comply w/s.w.o.

    Dec 22, 2014

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Oct 22, 2026 · Apt 4R

    Open
  • Unsanitary condition

    Mold

    Aug 24, 2026 · Apt 4R

    Close
  • Water leak

    Slow leak

    Aug 24, 2026 · Apt 4R

    Close
  • Flooring/stairs

    Floor

    Aug 24, 2026 · Apt 4R

    Close
  • General

    Cabinet

    Aug 24, 2026 · Apt 4R

    Close
  • Paint/plaster

    Wall

    Aug 24, 2026 · Apt 4R

    Close
  • Plumbing

    Water supply

    Aug 4, 2026 · Apt 2L

    Close
  • Plumbing

    Water supply

    Aug 3, 2026 · Apt 3L

    Close
  • Unsanitary condition

    Mold

    Jun 20, 2026 · Apt 4R

    Close
  • Unsanitary condition

    Mold

    Jun 15, 2026 · Apt 4R

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Feb 8, 2026 · Apt 4R

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2025 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Sep 14, 2025 · Apt 4R

    Close
  • Water leak

    Slow leak

    Jul 28, 2025 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Jul 28, 2025 · Apt 1R

    Close
  • Door/window

    Door

    Jul 28, 2025 · Apt 1R

    Close
  • General

    Mailbox

    Jul 28, 2025 · Apt 1R

    Close
  • Door/window

    Door

    Jul 28, 2025 · Apt 1R

    Close
  • Water leak

    Slow leak

    Jul 15, 2025 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Jul 15, 2025 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2025 · Apt 4R

    Close
  • Heat/hot water

    Apartment only

    Feb 22, 2025 · Apt 4R

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2025 · Apt 4R

    Close
  • Electric

    Power outage

    Jan 11, 2025 · Apt 2L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 6, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 28, 2024 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2023 · Apt BLDG

    Close
  • Door/window

    Door

    Sep 12, 2023 · Apt BLDG

    Close
  • Door/window

    Door

    Sep 12, 2023 · Apt 3R

    Close
  • Unsanitary condition

    Sewage

    Dec 27, 2022 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 5, 2022 · Apt 4R

    Close
  • Heat/hot water

    Entire building

    Feb 17, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 14, 2022 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2022 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 19, 2021 · Apt 4R

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2021 · Apt 3R

    Close
  • Flooring/stairs

    Floor

    Dec 3, 2021 · Apt 2R

    Close
  • Door/window

    Door

    Dec 3, 2021 · Apt 2R

    Close
  • Plumbing

    Toilet

    Dec 3, 2021 · Apt 2R

    Close
  • Door/window

    Window frame

    Dec 3, 2021 · Apt 2R

    Close
  • Plumbing

    Basin/sink

    Dec 3, 2021 · Apt 2R

    Close
  • Electric

    Power outage

    Dec 3, 2021 · Apt 2R

    Close
  • General

    Bell/buzzer/intercom

    Nov 7, 2021 · Apt 2R

    Close
  • Door/window

    Door

    Nov 7, 2021 · Apt 2R

    Close
  • Door/window

    Window pane

    Nov 7, 2021 · Apt 2R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1886
Floors
4
Residential units
7
Building area
6,000 ft²
Lot area
1,500 ft²
Zoning
R6A
Community board
303
Council district
36
Block / lot
1681 / 45
Assessed value
$806,850
Landmark / historic district
Bedford Stuyvesant / Expanded Stuyvesant Heights Historic District

HPD registration #378310, last renewed Jul 30, 2026.

Questions about 320 Malcolm X Boulevard

Who owns 320 Malcolm X Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is 360 Decatur LLC.

Does 320 Malcolm X Boulevard have violations?

Yes. NYC HPD has recorded 280 housing violations at this property.

Is 320 Malcolm X Boulevard rent stabilized?

NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 29% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 320 Malcolm X Boulevard built?

City records list 1886 as the year it was built.

How many apartments are in 320 Malcolm X Boulevard?

It has 7 residential units and 8 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.