320 Malcolm X Boulevard
Brooklyn, NY 11233BBL 3-01681-0045Map
Owner of record: 360 Decatur LLC
320 Malcolm X Boulevard is a walk-up apartment building built in 1886 in Brooklyn, 11233. It has 7 residential units across 4 floors. The owner of record is 360 Decatur LLC. HPD has recorded 280 housing violations here, most recently on August 28, 2026. 15 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 280
- DOB violations
- 32
- ECB violations
- 17
- HPD complaints
- 222
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 280
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq ft at south and west walls in the bathroom located at apt 4r, 4th story, 1st apartment from south at west
Aug 28, 2026 · Apt 4R
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at south, west walls and floor in the bathroom located at apt 4r, 4th story, 1st apartment from south at west
Aug 28, 2026 · Apt 4R
Open — Violation will be reinspected - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south and west walls in the bathroom located at apt 4r, 4th story, 1st apartment from south at west
Aug 28, 2026 · Apt 4R
Open — Violation will be reinspected - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 1st room from east at north located at apt 4r, 4th story, 1st apartment from south at west
Jun 25, 2026 · Apt 4R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west
Jun 25, 2026 · Apt 4R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Jun 18, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 4r, 4th story, 1st apartment from south at west
Jun 18, 2026 · Apt 4R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroom located at apt 4r, 4th story, 1st apartment from south at west
Jun 18, 2026 · Apt 4R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4r, 4th story, 1st apartment from south at west
Jun 18, 2026 · Apt 4R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wash basin at south wall in the bathroom located at apt 4r, 4th story, 1st apartment from south at west
Jun 18, 2026 · Apt 4R
Open — Nov sent out
Show 40 more ↓
- BHazardous
Replace with new the missing base cabinet at south wall in the bathroom located at apt 4r, 4th story, 1st apartment from south at west
Jun 18, 2026 · Apt 4R
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items and boxes at public hall stairs, 4th story
Jun 18, 2026
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Sep 17, 2025
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west
Sep 17, 2025 · Apt 4R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the foyer located at apt 4r, 4th story, 1st apartment from south at west
Sep 17, 2025 · Apt 4R
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of airconditioner installed at window at north wall leading to fire escape in the 1st room from east located at apt 4r, 4th story, 1st apartment from south at west
Sep 17, 2025 · Apt 4R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the bathroom located at apt 4r, 4th story, 1st apartment from south at west
Sep 17, 2025 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock on door leading to egress window in the 4th room from east located at apt 1r, 1st story, 1st apartment from south at west
Jul 31, 2025 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from south at west
Jul 31, 2025 · Apt 1R
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at water closet and wash basin at cellar
Jul 18, 2025
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration breaching of the floor slab and installing stairs connecting the first story and cellar creating a duplex apartment in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west
Jul 18, 2025 · Apt 1R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west
Feb 27, 2025 · Apt 4R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west
Feb 27, 2025 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west
Feb 27, 2025 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Feb 12, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Feb 12, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Feb 12, 2025 · Apt 3R
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd story balcony at building front , 3rd story
Sep 20, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 4r, 4th story, 1st apartment from south at west
Mar 6, 2022 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4r, 4th story, 1st apartment from south at west
Mar 6, 2022 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at boiler room
Feb 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Feb 15, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Feb 15, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at all hot water fixture kitcken sink, wash basin,bathtub in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Dec 19, 2021 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective ceramic floor tile in the private hallway located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north, east, south and west walls in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective ceramic floor tile in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet , inoperable in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective reglaze porcelain enamel bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures , cause unknown in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective bell buzzer intercom at east wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective glass pane at lower window sash at north wall in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective ceramic floor tile in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north, east, and south walls in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective ceramic floor tile in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective lower window sash counter balance at north wall in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west
Dec 7, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective water closet in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Nov 30, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
Replace with new the missing entrance door in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Nov 30, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing window glass at upper and lower sashes in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from south at west
Nov 30, 2021 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective glass pane at lower window sash in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Nov 30, 2021 · Apt 2R
Closed — Violation dismissed
DOB building violations · 32
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 1, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 1, 2015
Dob violation - active
Show 22 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 1, 2015
Dob violation - active - Landmark none
Landmk-landmark none
Apr 30, 2015
Dob violation - active - Landmark none
Landmk-landmark none
Apr 30, 2015
Dob violation - active - Landmark none
Landmk-landmark none
Apr 30, 2015
Dob violation - active - Landmark none
Landmk-landmark none
Apr 30, 2015
Dob violation - dismissed - Landmark none
Landmk-landmark none
Apr 30, 2015
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 17
- Class - 2
Failure to maintain, i observed in cellar a fully installed sump pump, with piping incorrectly discharging waste onto sidewalk, not compliant with pc 712, repair and/or replace
May 29, 2026 · Penalty $1,280
Active - Class - 2
Work without permit, i observed sump pump 100% installed with all typical piping in basement with no permits on file in dob system., obtain all permits
May 29, 2026 · Penalty $1,280
Active - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000072692n0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Sep 27, 2024 · Penalty $625
Active - Class - 1
Work without permit. at time of inspection in cellar i observed illegal gas meter bypass for restaurant. additionally i observed 5 electric hot water heaters. no permit on dob records to perform this work., obt
Mar 4, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to have new or altered plumbing system tested. at time of inspection i observed 5 new electric hot water heaters, 6 commercial gas appliances- no plumbing inspection., perform test
Mar 4, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code complaint manner. at time of inspection in cellar i observed illegal bushing on gas line, installed on gas meter bar to restaurant., repair and/replace
Mar 4, 2022 · Penalty $1,250
Resolve - Class - 1
Gas being supplied to building without inspections and authorization by dob. at time of inspection i observed in restaurant 6 commercial gas appliances. no plumbing inspections, no gas authorization under job#
Mar 4, 2022 · Penalty $5,000
Resolve - Class - 2
Failure to file certificates of correction for 2 violations #351132925 on 4/10/15-#35113287p on 4/10/15.remedy:file certificate of correction
Oct 31, 2015 · Penalty $2,000
Active - Class - 2
Failure to comply with the commissioner's order contained in nov #35113291h issued on 4/08/15 and to file a certificate of correction pursuant to 28-201.1,28-204.4 and 1rcny 102-01.rem:comply with commissioner'
Sep 16, 2015 · Penalty $800
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov #35113292j issued on 4/10/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. for unlawfully continued work while on notice of a stop work
Sep 16, 2015 · Penalty $2,400
Resolve
Show 7 more ↓
- Class - 1
Failure to comply w/the comm's order contained in nov #35113287p issued on 4/8/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. for gut-rehab,damp etc done w/o a permit. remedy: comply w/comm
Sep 16, 2015 · Penalty $2,400
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. found 5 men at work performing various construction work including masonry &cement work,exterior or facade work contrary to stop work order #
Apr 10, 2015 · Penalty $4,800
Active - Class - 1
Work w/o a permit gut rehab in progress w/5 men at work on 5 levels- from bsmt throught 4th flr; work noted include demo,full height parti tions,new electric, new plumbing and mechanicals rebuilding of entry
Apr 8, 2015 · Penalty $1,600
Active - Class - 1
Failure to maintain bldg in code compliant manner.noted:a partially occupied building w/in full blown construction with excessive dust and debris on public hall with no tenant protection plan; severe hazardous
Apr 8, 2015 · Penalty $1,000
Active - Class - 2
Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #35119240p issued on 12/22/14 pursuant to 28-204.4 & 1rcny102-01. continued to work while notice of a stop work order in apts #
Feb 10, 2015
Resolve - Class - 1
Fail to comply w/the commissioner's order contained in n.o.v. #35097975l issued on 10/20/14.work w/o a permit. gut renovations of apt's 2l, 3l, & 4l.remedy: comply w/the commissioner's order.
Dec 22, 2014
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order.a s.w.o was issued for apts 2l,3l, & 4l on 10/28/14.sheetrockers installing sheetrock & taping @time of insp @apts 2l,3l, & 4l.rem:comply w/s.w.o.
Dec 22, 2014
Resolve
Complaints
- Unsanitary condition
Mold
Oct 22, 2026 · Apt 4R
Open - Unsanitary condition
Mold
Aug 24, 2026 · Apt 4R
Close - Water leak
Slow leak
Aug 24, 2026 · Apt 4R
Close - Flooring/stairs
Floor
Aug 24, 2026 · Apt 4R
Close - General
Cabinet
Aug 24, 2026 · Apt 4R
Close - Paint/plaster
Wall
Aug 24, 2026 · Apt 4R
Close - Plumbing
Water supply
Aug 4, 2026 · Apt 2L
Close - Plumbing
Water supply
Aug 3, 2026 · Apt 3L
Close - Unsanitary condition
Mold
Jun 20, 2026 · Apt 4R
Close - Unsanitary condition
Mold
Jun 15, 2026 · Apt 4R
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Feb 8, 2026 · Apt 4R
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt BLDG
Close - Paint/plaster
Wall
Sep 14, 2025 · Apt 4R
Close - Water leak
Slow leak
Jul 28, 2025 · Apt 1R
Close - Unsanitary condition
Mold
Jul 28, 2025 · Apt 1R
Close - Door/window
Door
Jul 28, 2025 · Apt 1R
Close - General
Mailbox
Jul 28, 2025 · Apt 1R
Close - Door/window
Door
Jul 28, 2025 · Apt 1R
Close - Water leak
Slow leak
Jul 15, 2025 · Apt 1R
Close - Unsanitary condition
Mold
Jul 15, 2025 · Apt 1R
Close - Heat/hot water
Entire building
Feb 26, 2025 · Apt 4R
Close - Heat/hot water
Apartment only
Feb 22, 2025 · Apt 4R
Close - Heat/hot water
Apartment only
Feb 9, 2025 · Apt 4R
Close - Electric
Power outage
Jan 11, 2025 · Apt 2L
Close - Unsanitary condition
Garbage/recycling storage
Feb 6, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 28, 2024 · Apt 1R
Close - Heat/hot water
Entire building
Nov 1, 2023 · Apt BLDG
Close - Door/window
Door
Sep 12, 2023 · Apt BLDG
Close - Door/window
Door
Sep 12, 2023 · Apt 3R
Close - Unsanitary condition
Sewage
Dec 27, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Dec 2, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 5, 2022 · Apt 4R
Close - Heat/hot water
Entire building
Feb 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Jan 20, 2022 · Apt 3L
Close - Heat/hot water
Entire building
Jan 15, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 19, 2021 · Apt 4R
Close - Heat/hot water
Entire building
Dec 18, 2021 · Apt 3R
Close - Flooring/stairs
Floor
Dec 3, 2021 · Apt 2R
Close - Door/window
Door
Dec 3, 2021 · Apt 2R
Close - Plumbing
Toilet
Dec 3, 2021 · Apt 2R
Close - Door/window
Window frame
Dec 3, 2021 · Apt 2R
Close - Plumbing
Basin/sink
Dec 3, 2021 · Apt 2R
Close - Electric
Power outage
Dec 3, 2021 · Apt 2R
Close - General
Bell/buzzer/intercom
Nov 7, 2021 · Apt 2R
Close - Door/window
Door
Nov 7, 2021 · Apt 2R
Close - Door/window
Window pane
Nov 7, 2021 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1886
- Floors
- 4
- Residential units
- 7
- Building area
- 6,000 ft²
- Lot area
- 1,500 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1681 / 45
- Assessed value
- $806,850
- Landmark / historic district
- Bedford Stuyvesant / Expanded Stuyvesant Heights Historic District
HPD registration #378310, last renewed Jul 30, 2026.
Questions about 320 Malcolm X Boulevard
Who owns 320 Malcolm X Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 360 Decatur LLC.
Does 320 Malcolm X Boulevard have violations?
Yes. NYC HPD has recorded 280 housing violations at this property.
Is 320 Malcolm X Boulevard rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 29% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 320 Malcolm X Boulevard built?
City records list 1886 as the year it was built.
How many apartments are in 320 Malcolm X Boulevard?
It has 7 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.