249 Malcolm X Boulevard
Brooklyn, NY 11233BBL 3-01667-0008Map
Owner of record: Bainbridge Claster As
249 Malcolm X Boulevard is a mixed residential and retail building built in 1927 in Brooklyn, 11233. It has 6 residential units across 3 floors. The owner of record is Bainbridge Claster As. HPD has recorded 29 housing violations here, most recently on May 5, 2026. 2 of the 29 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 29
- DOB violations
- 17
- ECB violations
- 0
- HPD complaints
- 10
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 29
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from west at north
Oct 8, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2b, 3rd story, 1st apartment from east at south
Aug 28, 2023 · Apt 2B
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2b, 3rd story, 1st apartment from east at south
Aug 28, 2023 · Apt 2B
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective mechanical stopper at bathtub in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west
Apr 10, 2023 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt 3b, 3rd story, 1st apartment from south at west
Apr 10, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 3b, 3rd story, 1st apartment from south at west
Apr 10, 2023 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from west at north
Apr 10, 2023 · Apt 3A
Closed — Violation dismissed
Show 19 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of hot water , exceeding the maximum allowable temperature of 130 degrees at hot water fixtures in the entire apartment located at apt 3a, 3rd story
Apr 10, 2023 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at 1st public hall bulkhead from east
Apr 10, 2023
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from west at north
Apr 10, 2023 · Apt 3A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees at all hot fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Jun 14, 2021 · Apt 3A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak through ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from west at north
Aug 27, 2018 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balances and window lower sash in the 1st room from east located at apt 3a, 3rd story, 1st apartment from west at north
Aug 27, 2018 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from west at north
Aug 27, 2018 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective upper and lower sashes of window in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west
Jan 5, 2018 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective upper and lower sashes of window in the 1st room from east located at apt 1a, 1st story, 1st apartment from south at west
Jan 5, 2018 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed live electrical wires at ceiling in the kitchen in the kitchen located at apt 1a, 1st story, 1st apartment from south at west
Jan 5, 2018 · Apt 1A
Closed — Violation closed - BHazardous
Replace with new the broken or defective light fixture at ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from south at west
Jan 5, 2018 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperative located at apt 2b, 2nd story, 1st apartment from west at north
Aug 11, 2017 · Apt 2B
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors at bulkhead , 3rd story
Sep 8, 2016
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked at flap doors
Aug 26, 2014
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall & on boiler room door.
Nov 10, 1989
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked.
Nov 10, 1989
Closed — Violation closed - CImmediately hazardous
D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system 1 sty pub hall.
Aug 13, 1986
Closed — Violation closed - CImmediately hazardous
D26-17.10 adm code provide ready access to building's heating system pad lock on flap door street front.
Aug 13, 1986
Closed — Violation closed
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
Show 7 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Public assembly none
Pa-public assembly none
Mar 11, 1989
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Heavy flow
Mar 11, 2026 · Apt 3A
Close - Water leak
Heavy flow
Mar 2, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 1, 2018 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 13, 2017 · Apt 1A
Close - Heating
Heat related
Jan 25, 2013 · Apt 3
Close - Paint/plaster
Wall
May 22, 2008 · Apt 2B
Close - Plumbing
Toilet
May 22, 2008 · Apt 2B
Close - Plumbing
Basin/sink
May 22, 2008 · Apt 2B
Close - Plumbing
Basin/sink
May 22, 2008 · Apt 2B
Close - General
Doors
May 22, 2008 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1927
- Floors
- 3
- Residential units
- 6
- Building area
- 4,883 ft²
- Lot area
- 1,715 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1667 / 8
- Assessed value
- $497,250
- Landmark / historic district
- No
HPD registration #366792, last renewed Aug 31, 2025.
Questions about 249 Malcolm X Boulevard
Who owns 249 Malcolm X Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Bainbridge Claster As.
Does 249 Malcolm X Boulevard have violations?
Yes. NYC HPD has recorded 29 housing violations at this property.
Is 249 Malcolm X Boulevard rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 83% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 249 Malcolm X Boulevard built?
City records list 1927 as the year it was built.
How many apartments are in 249 Malcolm X Boulevard?
It has 6 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.